Federal contract award
693C7326F00004N
TN NP GRSM 11(6): THE PROJECT CONSISTS OF REPAIRING PAVEMENT EDGE DROP-OFFS, REMOVING OR PAVING GRAVEL PULL-OFF AREAS AND REPLACING TIMBER GUARDRAIL. THE WORK INCLUDES SHOULDER HARDENING, WHICH CONSISTS OF CONSTRUCTING A 2-FOOT WIDE ASPHALT PAVED SH
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693C73 EASTERN FED LANDS DIVISION |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | 693C7320D000008 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $3.2M |
| Current contract value | $3.2M |
| Potential contract value / ceiling | $3.2M |
| Start date | Oct 30, 2025 |
| Current end date | Sep 30, 2028 |
| Potential end date | Sep 30, 2028 |
| Latest award activity | Aug 31, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 31, 2026 | P00003 | $135.2K | TN NP GRSM 11(6) - CM #3: 693C7320D000008/693C7326F00004N THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) INCREASE THE CONTRACT AMOUNT BY $135,175.95 FROM $3,110,339.95 TO $3,245,515.90. 2) ADD ONE NEW PAY ITEM TO ADDRESS THE REPAIR OF AN |
| Aug 4, 2026 | P00002 | $0 | TN NP GRSM 11(6) - CM #2: 693C7320D000008/693C7326F00004N THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) EXTEND THE PERIOD OF PERFORMANCE FOR TN NP GRSM 11(6) TO SEPTEMBER 30, 2028. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
| Jun 16, 2026 | P00001 | $-14.6K | TN NP GRSM 11(6) - CM #1: 693C7320D000008/693C7326F00004N THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) DECREASE THE CONTRACT AMOUNT BY $14,632.80 FROM $3,124,972.75 TO $3,110,339.95. 2) ADD ADDITIONAL CURB AND GUTTER TO CONTROL A WATER |
| Oct 30, 2025 | 0 | $3.1M | TN NP GRSM 11(6): THE PROJECT CONSISTS OF REPAIRING PAVEMENT EDGE DROP-OFFS, REMOVING OR PAVING GRAVEL PULL-OFF AREAS AND REPLACING TIMBER GUARDRAIL. THE WORK INCLUDES SHOULDER HARDENING, WHICH CONSISTS OF CONSTRUCTING A 2-FOOT WIDE ASPHALT PAVED SH |
Estimated positioning window
Sep 30, 2027 – Mar 30, 2028
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2028-09-30 (706 days from calculation)
- +25 points
- 221 historical awards in this buyer and category group
- +15 points
- 4 recorded award transactions
- +10 points
- Latest award action: 2026-08-31
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.