Federal contract award

693C7326F00004N

TN NP GRSM 11(6): THE PROJECT CONSISTS OF REPAIRING PAVEMENT EDGE DROP-OFFS, REMOVING OR PAVING GRAVEL PULL-OFF AREAS AND REPLACING TIMBER GUARDRAIL. THE WORK INCLUDES SHOULDER HARDENING, WHICH CONSISTS OF CONSTRUCTING A 2-FOOT WIDE ASPHALT PAVED SH

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693C73 EASTERN FED LANDS DIVISION
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicle693C7320D000008
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$3.2M
Current contract value$3.2M
Potential contract value / ceiling$3.2M
Start dateOct 30, 2025
Current end dateSep 30, 2028
Potential end dateSep 30, 2028
Latest award activityAug 31, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 31, 2026P00003$135.2KTN NP GRSM 11(6) - CM #3: 693C7320D000008/693C7326F00004N THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) INCREASE THE CONTRACT AMOUNT BY $135,175.95 FROM $3,110,339.95 TO $3,245,515.90. 2) ADD ONE NEW PAY ITEM TO ADDRESS THE REPAIR OF AN
Aug 4, 2026P00002$0TN NP GRSM 11(6) - CM #2: 693C7320D000008/693C7326F00004N THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) EXTEND THE PERIOD OF PERFORMANCE FOR TN NP GRSM 11(6) TO SEPTEMBER 30, 2028. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Jun 16, 2026P00001$-14.6KTN NP GRSM 11(6) - CM #1: 693C7320D000008/693C7326F00004N THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) DECREASE THE CONTRACT AMOUNT BY $14,632.80 FROM $3,124,972.75 TO $3,110,339.95. 2) ADD ADDITIONAL CURB AND GUTTER TO CONTROL A WATER
Oct 30, 20250$3.1MTN NP GRSM 11(6): THE PROJECT CONSISTS OF REPAIRING PAVEMENT EDGE DROP-OFFS, REMOVING OR PAVING GRAVEL PULL-OFF AREAS AND REPLACING TIMBER GUARDRAIL. THE WORK INCLUDES SHOULDER HARDENING, WHICH CONSISTS OF CONSTRUCTING A 2-FOOT WIDE ASPHALT PAVED SH

Estimated positioning window

Sep 30, 2027 – Mar 30, 2028

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2028-09-30 (706 days from calculation)
+25 points
221 historical awards in this buyer and category group
+15 points
4 recorded award transactions
+10 points
Latest award action: 2026-08-31
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.