Federal contract award
693C7326F00048N
PROJECT DC NP NAMA 18(1), 19(1), 25(2): THIS PROJECT CONSISTS OF 2-INCH MILL AND ASPHALT OVERLAY AND PAVEMENT MARKINGS ON HENRY BACON DR NW, 23RD STREET NW, 23RD STEET SW, DANIEL FRENCH DR SW, PARKWAY DR NW, AND LINCOLN MEMORIAL CIRCLE AND ADJACENT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693C73 EASTERN FED LANDS DIVISION |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | 693C7326D000004 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $2.3M |
| Current contract value | $2.3M |
| Potential contract value / ceiling | $2.3M |
| Start date | Apr 2, 2026 |
| Current end date | Nov 30, 2027 |
| Potential end date | Nov 30, 2027 |
| Latest award activity | Sep 8, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 8, 2026 | P00003 | $-33.4K | DC NP NAMA 18(1), 19(1), 25(2) CM #03: 693C7326D000004/693C7326F00048N THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) DECREASE CONTRACT AMOUNT BY $33,380.78 FROM $2,376,702.73 TO $2,343,321.95. |
| Aug 11, 2026 | P00002 | $0 | DC NP NAMA 18(1), 19(1), 25(2) - CM #2: 693C7326D000004/693C7326F00048N THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) EXTEND THE PERIOD OF PERFORMANCE FOR DC NP NAMA 18(1), 19(1), 25(2) TO NOVEMBER 30, 2027. ALL OTHER TERMS AND CONDITI |
| Apr 23, 2026 | P00001 | $383.9K | DC NP NAMA 18(1), 19(1), 25(2) CM #01: 693C7326D000004/693C7326F00048N THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) INCREASE CONTRACT AMOUNT BY $383,891.80 FROM $1,992,810.93 TO $2,376,702.73. 2) INCREASE QUANTITIES OF EXISTING PAY ITEMS |
| Apr 2, 2026 | 0 | $2.0M | PROJECT DC NP NAMA 18(1), 19(1), 25(2): THIS PROJECT CONSISTS OF 2-INCH MILL AND ASPHALT OVERLAY AND PAVEMENT MARKINGS ON HENRY BACON DR NW, 23RD STREET NW, 23RD STEET SW, DANIEL FRENCH DR SW, PARKWAY DR NW, AND LINCOLN MEMORIAL CIRCLE AND ADJACENT |
Estimated positioning window
Nov 30, 2026 – May 30, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2027-11-30 (401 days from calculation)
- +25 points
- 221 historical awards in this buyer and category group
- +15 points
- 4 recorded award transactions
- +10 points
- Latest award action: 2026-09-08
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.