Federal contract award

693JF721F000018

(A)THIS TASK ORDER PROVIDES THE INITIAL FUND FOR THE PURCHASE AND INSTALLATION OF THE ATTACHMENT J-10 TRAINING AND OPERATIONS SPACE EQUIPMENT AND MATERIAL THIS INITIAL FUND (1,004,592.91) IS THE FIRM-FIXED PRICE FOR THE PHASE I OF THE PURCHASE AND I

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693JF7 DOT MARITIME ADMINISTRATION
NAICS336611 — Ship Building and Repairing
PSCR408 — Program Management/Support Services
Parent award / vehicle693JF719D000002
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$29.5M
Current contract value$29.5M
Potential contract value / ceiling$29.5M
Start dateMar 17, 2021
Current end dateMay 28, 2029
Potential end dateMay 28, 2029
Latest award activityJul 28, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 49 of 49 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 8, 2026P00048$165.2KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($165,187.00) FOR THE CONTRACTOR TO LOAD OUTFITTING MATERIAL ON NSMV IV IN ACCORDANCE WITH MODIFICATION 0100 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TO
Jul 28, 2026P00047$851.4KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($851,361.00) FOR THE CONTRACTOR TO PURCHASE ADDITIONAL PHASE I OUTFITTING FOR NSMV V IN ACCORDANCE WITH MODIFICATION 0099 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION IN
Jul 13, 2026P00046$293.1KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($293,144.00) FOR THE CONTRACTOR TO PURCHASE ADDITIONAL OUTFITTING FOR NSMVS IV & V, AND ONBOARD SPARES FOR NSMV V IN ACCORDANCE WITH MODIFICATION 0098 OF THE NSMV CONTRACT
Jun 12, 2026P00045$173.1KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($173,104.00) FOR THE CONTRACTOR TO PURCHASE HEAVY WEATHER MOORING LINES FOR NSMV IV IN ACCORDANCE WITH MODIFICATION 0097 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INC
Mar 20, 2026P00044$1.2MTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($1,177,162.00) FOR THE CONTRACTOR TO PURCHASE OUTFITTING AND ONBOARD SPARES FOR NSMV IV AND SHORE-BASED SPARES FOR THE NSMV FLEET IN ACCORDANCE WITH MODIFICATION 0094 OF THE N
Feb 3, 2026P00043$517.1KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($517,079.00) FOR THE CONTRACTOR TO INSTALL J-10 EQUIPMENT FOR NSMV IV IN ACCORDANCE WITH MODIFICATION 0093 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AMOUN
Jan 27, 2026P00042$47.5KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($47,536.16.00) FOR THE CONTRACTOR TO PURCHASE SPARE ONTS FOR NSMV IN ACCORDANCE WITH MODIFICATION 0092 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AMOUNT OF
Jan 16, 2026P00041$243.1KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($243,110.00) FOR THE CONTRACTOR TO PURCHASE PHASE 3 J-10 EQUIPMENT FOR NSMV IV IN ACCORDANCE WITH MODIFICATION 0089 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TO
Dec 12, 2025P00040$3.5MTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($3,460,238.98) FOR THE CONTRACTOR TO PURCHASE THE IT NETWORK FOR NSMV IV IN ACCORDANCE WITH MODIFICATION 0088 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AM
Nov 26, 2025P00039$1.5MTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($1,450,417.00) FOR THE CONTRACTOR TO PURCHASE LIFESAVING EQUIPMENT FOR NSMV IV IN ACCORDANCE WITH MODIFICATION 0087 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE
Sep 10, 2025P00038$195.6KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($195,552.00) FOR THE CONTRACTOR TO LOAD AND STOW SPARE PARTS AND SPECIAL TOOLS FOR NSMV III IN ACCORDANCE WITH MODIFICATION 0085 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INC
Aug 25, 2025P00037$478.3KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($478,284.00) FOR THE CONTRACTOR TO PURCHASE THE J-10 HOSPITAL EQUIPMENT FOR NSMV IV IN ACCORDANCE WITH MODIFICATION 0084 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES T
Jul 21, 2025P00036$137.8KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($137,804.00) FOR THE CONTRACTOR TO OVERSEE AND COORDINATE THE LOADOUT OF THE GENERAL AGENT SUPPLIED ITEMS FOR NSMV III IN ACCORDANCE WITH MODIFICATION 0083 OF THE NSMV CONTRACT. THIS
Jun 25, 2025P00035$119.0KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($118,996.00) FOR THE CONTRACTOR TO PURCHASE THE REMAINING PHASE 3 J-10 EQUIPMENT FOR NSMV III IN ACCORDANCE WITH MODIFICATION 0082 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATI
Jun 6, 2025P00034$504.1KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($504,056.00) FOR THE CONTRACTOR TO INSTALL THE TRAINING AND OPERATION SPACE EQUIPMENT AND MATERIAL FOR NSMV III IN ACCORDANCE WITH MODIFICATION 0081 OF THE NSMV CONTRACT. THIS TASK OR
May 27, 2025P00033$139.4KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($139,360.00) TO DIRECT THE CONTRACTOR TO PURCHASE HEAVY WEATHER MOORING LINES FOR NSMV III IN ACCORDANCE WITH MODIFICATION 0079 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCR
May 15, 2025P00032$1.4MTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($1,416,063.29) TO DIRECT THE CONTRACTOR TO UPGRADE THE NETWORK STORAGE FOR NSMV III IN ACCORDANCE WITH MODIFICATION 0078 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES
May 12, 2025P00031$50.4KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($50,418.30) TO DIRECT THE CONTRACTOR TO PURCHASE A WITNESS PC, PERFORM ADDITIONAL NETWORK CONFIGURATION, AND PERFORM 90 DAYS OF POST-DELIVERY REMOTE SUPPORT FOR NSMV II IN ACCORDA
Jan 28, 2025P00030$924.5KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($924,464.70) FOR THE CONTRACTOR TO: (1) OVERSEE AND COORDINATE THE OFFLOAD OF OFE FOR NSMV II, (2) CHANGE THE NETWORK MULTI-FACT AUTHENTICATION (MFA) EMPLOYED ABOARD NSMV II, (3) PERF
Nov 19, 2024P00029$128.3KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($128,257.00) FOR THE CONTRACTOR TO OVERSEE AND COORDINATE THE OFFLOAD OF OFE FOR NSMV II IN ACCORDANCE WITH MODIFICATION 0064 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREA
Aug 19, 2024P00028$80.1KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($80,104.40) FOR THE PURCHASE OF ADDITIONAL NETWORK SWITCHES FOR NSMV II IN ACCORDANCE WITH MODIFICATION 0058 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AMO
Jul 26, 2024P00027$476.1KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($476,057.00) FOR THE INSTALLATION OF NSMV II TRAINING AND OPERATIONS SPACE EQUIPMENT AND MATERIAL IN ACCORDANCE WITH MODIFICATION 0055 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATI
Jun 5, 2024P00026$1.4MTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($1,405,052.00) TO PURCHASE NSMV III LIFESAVING EQUIPMENT IN ACCORDANCE WITH MODIFICATION 0054 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AMOUNT OF THE TA
Apr 23, 2024P00025$1.6MTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($1,567,266.00) TO PURCHASE THE CORE NETWORK INFRASTRUCTURE FOR NSMV III IN ACCORDANCE WITH MODIFICATION 0053 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL A
Mar 22, 2024P00024$84.3KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($84,350.00) TO CONFIGURE A MULTI-FACTOR AUTHENTICATION (MFA) SOLUTION FOR NSMV II IN ACCORDANCE WITH MODIFICATION 0052 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES T
Mar 1, 2024P00023$519.6KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($519,624.00) FOR THE PURCHASE OF NSMV III HOSPITAL EQUIPMENT IN ACCORDANCE WITH MODIFICATION 0051 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AMOUNT OF THE
Feb 23, 2024P00022$79.9KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($79,881.10) FOR THE PURCHASE OF NSMV II REMAINING PHASE III EQUIPMENT IN ACCORDANCE WITH MODIFICATION 0050 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AMOUN
Jan 29, 2024P00021$-406.5KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO CANCEL LINE ITEMS 29 & 30 TO DE-OBLIGATE FUNDING ($406,472.10). THUS, THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AMOUNT OF THE TASK ORDER FROM $13,400,096.17 BY $406,472.10 TO $12,993,624.07
Sep 27, 2023P00020$406.5KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($80,000.00) FOR THE PROCUREMENT OF PROTECTIVE COVERS FOR THE NSMV I'S OPTICAL NETWORK TERMINALS PURSUANT TO MOD 0049 OF THE NSMV CONTRACT; THIS MODIFICATION ALSO PROVIDES FUNDING
Aug 30, 2023P00019$66.3KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($66,282.00) FOR THE SHIPMENT OF NSMV I SHORESIDE SPARES TO INCLUDE PROPELLER, ANCHORS, ANCHOR CHAINS, AND LIFESAVING GEAR FROM PHILLY SHIPYARD TO DLA DISTRIBUTION IN SUSQUEHANNA, PA A
Jul 5, 2023P00018$137.9KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($137,935.00) FOR THE PROCUREMENT OF HEAVY WEATHER MOORING LINES FOR NSMV II IN ACCORDANCE WITH MODIFICATION 0047 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL
Jun 14, 2023P00017$44.5KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($44,543.00) FOR THE CONFIGURATION OF A MULTI-FACTOR AUTHENTICATION SOLUTION FOR NSMV I IN ACCORDANCE WITH MODIFICATION 0046 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASE
May 23, 2023P00016$10.8KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($10,810.00) FOR THE PURCHASE MONITOR WALL MOUNTS FOR NSMV I & II IN ACCORDANCE WITH MODIFICATION 0045 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AMOUNT
May 19, 2023P00015$1.3MTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($1,343,058.00) FOR THE PURCHASE OF ADDITIONAL LIFESAVING AND FIREFIGHTING EQUIPMENT FOR NSMV II IN ACCORDANCE WITH MODIFICATION 0044 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION
May 12, 2023P00014$212.5KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($212,520.00) FOR THE PURCHASE OF A SPARE SHIPSET OF ANCHOR CHAIN IN ACCORDANCE WITH MODIFICATION 0043 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AMOUNT OF
May 10, 2023P00013$649.2KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($649,242.50) FOR THE INSTALLATION OF ADDITIONAL LIFESAVING AND FIREFIGHTING EQUIPMENT FOR ALL FIVE NSMVS IN ACCORDANCE WITH MODIFICATION 0042 OF THE NSMV CONTRACT. THIS TASK ORDER MOD
May 3, 2023P00012$508.5KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($508,495.00) FOR THE PURCHASE OF NSMV II J-10 HOSPITAL EQUIPMENT IN ACCORDANCE WITH MODIFICATION 0041 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AMOUNT OF
Apr 27, 2023P00011$536.1KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($536,144.00) FOR THE INSTALLATION OF NSMV I TRAINING AND OPERATIONS SPACE EQUIPMENT AND MATERIAL IN ACCORDANCE WITH MODIFICATION 0039 OF THE NSMV CONTRACT. THIS TASK ORDER MOD
Mar 9, 2023P00008$122.2KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($122,188.60) FOR THE PURCHASE OF LICENSES FOR ADDITIONAL WIRELESS ACCESS POINTS FOR THE NSMV I IN ACCORDANCE WITH MODIFICATION 0034 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION
Mar 9, 2023P00009$1.2MTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($1,153,835.00) FOR THE PURCHASE OF NSMV IV PHASE I AND NSMV III PHASE III TRAINING EQUIPMENT IN ACCORDANCE WITH MODIFICATION 0036 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION IN
Mar 9, 2023P00010$140.0KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($139,966.00) FOR THE PURCHASE OF HEAVY WEATHER MOORING LINES FOR NSMV I IN ACCORDANCE WITH MODIFICATION 0037 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AMO
Jan 9, 2023P00007$1.3MTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($1,284,951.00) FOR THE PURCHASE OF LIFESAVING EQUIPMENT FOR THE NSMV I IN ACCORDANCE WITH MODIFICATION 0032 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AMOU
Jan 6, 2023P00006$440.8KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING ($440,820.53) FOR THE PURCHASE OF NSMV I NETWORKING LICENSING PACKAGES IN ACCORDANCE WITH MODIFICATION 0031 OF THE NSMV CONTRACT. THIS TASK ORDER MODIFICATION INCREASES THE TOTAL AMOUN
Sep 28, 2022P00005$492.1KTHE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDS ($492,085.00) FOR THE PURCHASE AND DELIVERY OF THE NSMV I HOSPITAL OPERATIONS SPACE EQUIPMENT AND MATERIAL; THUS, THIS MODIFICATION INCREASES THE TOTAL AMOUNT OF THIS TASK ORDER FROM $5,
Jul 20, 2022P00004$1.1M(A) THE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING FOR THE PURCHASE OF NSMV II AND III TRAINING AND OPERATIONS SPACE EQUIPMENT AND MATERIAL; THUS, THIS DELIVERY ORDER MODIFICATION PROVIDES FUNDING FOR THE EXECUTION OF THE REQUIREME
Jun 1, 2022P00003$2.8M(A) THE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE FUNDING FOR THE PURCHASE, CONFIGURATION, INSTALLATION AND TESTING OF THE IT NETWORK SOLUTION FOR THE NSMV I AND NSMV II'S PHASE 2 TRAINING AND OPERATIONS SPACE EQUIPMENT AND MATERIAL.
Nov 29, 2021P00002$907.0K(A) THE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO PROVIDE THE FUND ($906,974.53) FOR THE PROCUREMENT OF NSMV II PHASE 1 OUTFITTING ITEMS IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE CONTRACT. (B) THIS TASK ORDER MODIFICATION INCREASES THE
Sep 21, 2021P00001$0(A) THE PURPOSE OF THIS NO-COST TASK ORDER MODIFICATION IS TO CHANGE THE LINE OF ACCOUNTING OF THE CHANGE ORDER FROM [70X1712NSV.2021.1NSMMVPMO3.0000160000.25000.61000600.0000000000.0000000000.0000000000.0000000000] TO [70X1712NSV.2021.1NSMMVPMO3.000
Mar 17, 20210$1.0M(A)THIS TASK ORDER PROVIDES THE INITIAL FUND FOR THE PURCHASE AND INSTALLATION OF THE ATTACHMENT J-10 TRAINING AND OPERATIONS SPACE EQUIPMENT AND MATERIAL THIS INITIAL FUND (1,004,592.91) IS THE FIRM-FIXED PRICE FOR THE PHASE I OF THE PURCHASE AND I

Estimated positioning window

May 28, 2028 – Nov 28, 2028

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2029-05-28 (939 days from calculation)
+15 points
4 historical awards in this buyer and category group
+15 points
49 recorded award transactions
+10 points
Latest award action: 2026-07-28
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.