Federal contract award

693JJ622C000035

THE SCOPE OF THE RESEARCH PART OF THIS PROJECT WILL INCLUDE THE APPLICATION OF AI/ML, SIMULATION AND SAFETY STATISTICAL MODELING IN RAILROAD TRANSPORTATION. THE EDUCATIONAL SCOPE WILL INCLUDE THE ENHANCEMENT OF THE CURRICULUM AND INTRODUCTION OF RAIL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693JJ6 FEDERAL RAILROAD ADMIN
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSCAS11 — TRANSPORTATION R&D SERVICES; SURFACE TRANSPORTATION, PUBLIC TRANSIT, AND RAIL; BASIC RESEARCH
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST NO FEE
Obligations$500.0K
Current contract value$500.0K
Potential contract value / ceiling$500.0K
Start dateSep 13, 2022
Current end dateSep 15, 2027
Potential end dateSep 15, 2027
Latest award activityAug 24, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 24, 2026P00006$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE TO SEPTEMBER 15, 2027 AND INCORPORATE THE REVISED DELIVERABLE AND PAYMENT SCHEDULE.
Jan 23, 2026P00005$0THE PURPOSE OF THIS MODIFICATION IS TO ADD THE REVISED TAR CLAUSE (TAR CLASS DEVIATION (CD) 2025-02) FOR INVOICING PAYMENT TO ALL NEW AND EXISTING CONTRACTS/ORDERS VIA BILATERAL MODIFICATION: "THE CONTRACTOR CERTIFIES THAT, BY SUBMITTING THIS
Aug 14, 2025P00004$123.8KTHE PURPOSE OF THIS MODIFICATION IS TO FUND CLIN 00004 (PHASE 4) OF THIS CONTRACT.
Sep 16, 2024P00003$123.8KPREPARING MINORITY SCHOLARS FOR RAILROAD-HIGHWAY SAFETY WORKFORCE (RH-SAW) MODIFICATION TO FUND PHASE 3 OF THIS CONTRACT.
Sep 9, 2023P00002$123.8KTHE PURPOSE OF THIS MODIFICATION IS TO FUND PHASE 2 OF THIS CONTRACT.
Aug 1, 2023P00001$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE REQUIRED FAR CLAUSE 52.204-27, PROHIBITION ON A BYTEDANCE COVERED APPLICATION.
Sep 13, 20220$128.5KTHE SCOPE OF THE RESEARCH PART OF THIS PROJECT WILL INCLUDE THE APPLICATION OF AI/ML, SIMULATION AND SAFETY STATISTICAL MODELING IN RAILROAD TRANSPORTATION. THE EDUCATIONAL SCOPE WILL INCLUDE THE ENHANCEMENT OF THE CURRICULUM AND INTRODUCTION OF RAIL

Estimated positioning window

Nov 1, 2026 – Mar 15, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2027-09-15 (318 days from calculation)
+35 points
127 historical awards in this buyer and category group
+15 points
7 recorded award transactions
+10 points
Latest award action: 2026-08-24
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.