Federal contract award

693JJ623F00032N

CONDUCT FIELD TESTING WITH A NORTH AMERICAN RAILROAD TO VALIDATE THE FROZEN BALLAST/RNT LOSS RELATIONSHIP DETERMINED FROM PREVIOUS FRA-FUNDED STUDIES.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693JJ6 FEDERAL RAILROAD ADMIN
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSCAS11 — TRANSPORTATION R&D SERVICES; SURFACE TRANSPORTATION, PUBLIC TRANSIT, AND RAIL; BASIC RESEARCH
Parent award / vehicle693JJ621D000001
Set-asideNot reported
Pricing typeTIME AND MATERIALS
Obligations$500.0K
Current contract value$500.0K
Potential contract value / ceiling$500.0K
Start dateAug 8, 2023
Current end dateAug 13, 2026
Potential end dateAug 13, 2026
Latest award activityJul 30, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 30, 2025P00005$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 08/13/2025 TO 08/13/2026.
Sep 10, 2024P00004$0THE PURPOSE OF THIS MODIFICATION IS TO MAKE THE FOLLOWING CHANGES IAW WITH 52.216-7 ALLOWABLE COST AND PAYMENT: 1) CHANGE THE CONTRACT TYPE FROM TIME & MATERIALS (T&M) CONTRACT TO COST PLUS FIXED FEE (CPFF) CONTRACT. 2) THE REMAINING COST
Jul 15, 2024P00003$250.0KCONDUCT FIELD TESTING WITH A NORTH AMERICAN RAILROAD TO VALIDATE THE FROZEN BALLAST/RNT LOSS RELATIONSHIP DETERMINED FROM PREVIOUS FRA-FUNDED STUDIES. MODIFICATION TO: 1) EXERCISE OPTION 1 2) ADD LABOR CATEGORY 3) CHANGE CONTRACTING OFFICER
Mar 20, 2024P00002$0MODIFICATION TO ADD LABOR CATEGORIES.
Aug 9, 2023P00001$0TO INCORPORATE ENSCO, INC. PROPOSAL "INVESTIGATION OF THE EFFECTS OF FROZEN BALLAST ON RNT LOSS AND RNT REMEDIATION" DATED JULY 13, 2023.
Aug 8, 20230$250.0KCONDUCT FIELD TESTING WITH A NORTH AMERICAN RAILROAD TO VALIDATE THE FROZEN BALLAST/RNT LOSS RELATIONSHIP DETERMINED FROM PREVIOUS FRA-FUNDED STUDIES.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.