Federal contract award

693JK425F95016N

THE PURPOSE OF THIS CALL ORDER IS TO FIX DOT HQ BUILDING SEGMENT B ROOF AND REMOVE SMALL SECTION OF GREEN ROOF AND REPAIR/SEAL ROOF MEMBRANE TO STOP WATER LEAKAGE TO CONFERENCE ROOM AND PRIVATE BATHROOM BELOW ON 9TH FLOOR. REPAIR DAMAGED DRYWALL ON

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693JK4 OST
NAICS236220 — Commercial and Institutional Building Construction
PSCC1EB — ARCHITECT AND ENGINEERING- CONSTRUCTION: MAINTENANCE BUILDINGS
Parent award / vehicle693JK422A500003
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$8.8K
Current contract value$8.8K
Potential contract value / ceiling$8.8K
Start dateJun 10, 2025
Current end dateSep 30, 2025
Potential end dateSep 30, 2025
Latest award activityJun 10, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 10, 20250$8.8KTHE PURPOSE OF THIS CALL ORDER IS TO FIX DOT HQ BUILDING SEGMENT B ROOF AND REMOVE SMALL SECTION OF GREEN ROOF AND REPAIR/SEAL ROOF MEMBRANE TO STOP WATER LEAKAGE TO CONFERENCE ROOM AND PRIVATE BATHROOM BELOW ON 9TH FLOOR. REPAIR DAMAGED DRYWALL ON

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.