Federal contract award

693KA725P00022

THE SFO AIR TRAFFIC CONTROL TOWER (ATCT) CAB REQUIRES ADDITIONAL EQUIPMENT AND REORGANIZATION OF LEGACY EQUIPMENT IN ORDER TO ACCOMMODATE TFDM DISPLAY HARDWARE INSTALLATION. THE NECESSARY EQUIPMENT MUST BE DESIGNED, PROCURED AND INSTALLED BY THE ORIG

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693JF9 HEADQUARTERS
NAICS541512 — Computer Systems Design Services
PSCZ1BA — MAINTENANCE OF AIR TRAFFIC CONTROL TOWERS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$53.4K
Current contract value$53.4K
Potential contract value / ceiling$60.0K
Start dateAug 18, 2025
Current end dateFeb 28, 2027
Potential end dateFeb 28, 2027
Latest award activityAug 20, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 20, 2026P00004$22.2KTHE PURPOSE OF THIS MODIFICATION IS FOR THE PURCHASE AND SHIPMENT OF A WORKSURFACE KEYBOARD WITH ARMS AND SLIDEOUT IN SUPPORT OF TFDM PROGRAM REQUIREMENTS INCREMENTALLY FUND IN THE AMOUNT OF $2,853.81 PER PR WA-26-06214 TOTAL CONTRACT FUNDING IS IN
May 28, 2026P00003$2.9KTHE PURPOSE OF THIS MODIFICATION IS FOR THE PURCHASE AND SHIPMENT OF A WORKSURFACE KEYBOARD WITH ARMS AND SLIDEOUT IN SUPPORT OF TFDM PROGRAM REQUIREMENTS INCREMENTALLY FUND IN THE AMOUNT OF $2,853.81 PER PR WA-26-06214 TOTAL CONTRACT FUNDING IS IN
Jan 22, 2026P00002$894THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR OAK MOUNTS INCREMENTALLY FUND IN THE AMOUNT OF $894.05 PER PR WA-26-01321 TOTAL CONTRACT FUNDING IS INCREASED BY $894.05 FROM $27,453.76 TO $28,347.05 ALL OTHER TERMS AND CONDITIONS REMAIN UNC
Nov 19, 2025P00001$0ADD TEN (10) ADDITIONAL SWITCHES REQUESTED BY THE AIR TRAFFIC CONTROLLERS. THESE SWITCHES ARE REQUIRED TO SUPPORT OPERATIONAL NEEDS.
Aug 18, 20250$27.5KTHE SFO AIR TRAFFIC CONTROL TOWER (ATCT) CAB REQUIRES ADDITIONAL EQUIPMENT AND REORGANIZATION OF LEGACY EQUIPMENT IN ORDER TO ACCOMMODATE TFDM DISPLAY HARDWARE INSTALLATION. THE NECESSARY EQUIPMENT MUST BE DESIGNED, PROCURED AND INSTALLED BY THE ORIG

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2027-02-28 (126 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
5 recorded award transactions
+10 points
Latest award action: 2026-08-20
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.