Federal contract award
693KA822C00001
CAASD MUST PROVIDE ESSENTIAL ENGINEERING, RESEARCH, AND ANALYSIS CAPABILITIES TO SUPPORT THE FAA IN THE PERFORMANCE OF ITS MISSION THROUGH A SYSTEMS APPROACH THAT ADDRESSES ALL DIMENSIONS (E.G. POLITICAL, OPERATIONAL, ECONOMIC, TECHNICAL) REQUIRED TO
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693KA8 SYSTEM OPERATIONS CONTRACTS |
| NAICS | 541330 — Engineering Services |
| PSC | R425 — Engineering and Technical Services |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $774.0M |
| Current contract value | $774.0M |
| Potential contract value / ceiling | $2.2B |
| Start date | Oct 20, 2021 |
| Current end date | Mar 31, 2030 |
| Potential end date | Sep 30, 2030 |
| Latest award activity | Sep 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 157 of 157 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 4, 2026 | P00156 | $6.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 1, 2026 | P00152 | $-10.9K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 1, 2026 | P00153 | $-4.7K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 1, 2026 | P00154 | $-1.6K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 1, 2026 | P00155 | $-116 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 24, 2026 | P00151 | $6.6M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 4, 2026 | P00150 | $-323.2K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jul 28, 2026 | P00149 | $7.5M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jul 15, 2026 | P00143 | $-4.6K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jul 15, 2026 | P00144 | $-3.6K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jul 15, 2026 | P00145 | $-785 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jul 15, 2026 | P00146 | $-616 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jul 15, 2026 | P00147 | $-343 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jul 15, 2026 | P00148 | $-160.5K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jul 2, 2026 | P00142 | $9.9M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jun 15, 2026 | P00141 | $18.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 28, 2026 | P00140 | $5.9M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 27, 2026 | P00138 | $-974 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 27, 2026 | P00139 | $-661 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 22, 2026 | P00137 | $-2.3K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 14, 2026 | P00136 | $1.8M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 13, 2026 | P00135 | $-12.4K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 28, 2026 | P00134 | $17.4M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 24, 2026 | P00133 | $-1.4K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 13, 2026 | P00132 | $922.5K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 10, 2026 | P00131 | $-849 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 27, 2026 | P00129 | $11.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 27, 2026 | P00130 | $3.6M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 12, 2026 | P00128 | $15.7M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 9, 2026 | P00127 | $-360 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Feb 18, 2026 | P00125 | $-3.1K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Feb 18, 2026 | P00126 | $-9.5K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Feb 9, 2026 | P00124 | $6.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jan 30, 2026 | P00123 | $0 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jan 16, 2026 | P00122 | $0 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jan 13, 2026 | P00121 | $4.8M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 23, 2025 | P00120 | $1.4M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 17, 2025 | P00119 | $0 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 11, 2025 | P00118 | $17.3M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Nov 21, 2025 | P00117 | $3.3M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Nov 20, 2025 | P00116 | $167.8K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Oct 17, 2025 | P00115 | $365.0K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 29, 2025 | P00114 | $13.0K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 24, 2025 | P00113 | $2.4M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 18, 2025 | P00112 | $14.7M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 12, 2025 | P00110 | $-262.5K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 12, 2025 | P00111 | $-60.0K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 4, 2025 | P00109 | $13.3M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 11, 2025 | P00108 | $-982 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 7, 2025 | P00107 | $16.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 4, 2025 | P00105 | $-3.7K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 4, 2025 | P00106 | $-21.6K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jul 28, 2025 | P00104 | $5.2M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jun 25, 2025 | P00103 | $4.5M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jun 11, 2025 | P00102 | $-763 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jun 6, 2025 | P00100 | $-8.0K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jun 6, 2025 | P00101 | $-4.6K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jun 3, 2025 | P00099 | $5.8M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 28, 2025 | P00098 | $12.9M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 18, 2025 | P00097 | $16.5M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 11, 2025 | P00095 | $-5.3K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 11, 2025 | P00096 | $-234 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 27, 2025 | P00093 | $3.3M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 27, 2025 | P00094 | $1.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 14, 2025 | P00092 | $1.6M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Feb 25, 2025 | P00091 | $7.7M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Feb 11, 2025 | P00090 | $2.6M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Feb 5, 2025 | P00089 | $-9.9K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jan 24, 2025 | P00088 | $22.5M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 27, 2024 | P00087 | $0 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 23, 2024 | P00086 | $2.5M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 18, 2024 | P00083 | $4.5M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 18, 2024 | P00084 | $-10.7K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 18, 2024 | P00085 | $-33.8K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 3, 2024 | P00082 | $2.4M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Nov 20, 2024 | P00081 | $-168 | ANNUAL $250 OR LESS DE-OBLIGATION PER THE AMS |
| Oct 30, 2024 | P00080 | $16.3M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 24, 2024 | P00078 | $4.1M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 24, 2024 | P00079 | $0 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 18, 2024 | P00077 | $11.2M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 11, 2024 | P00076 | $1.3M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 28, 2024 | P00075 | $18.1M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 13, 2024 | P00070 | $-22.5K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 13, 2024 | P00071 | $-28.6K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 13, 2024 | P00072 | $-13.6K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 13, 2024 | P00073 | $-14.7K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 13, 2024 | P00074 | $-225.0K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 9, 2024 | P00069 | $10.5M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jul 25, 2024 | P00068 | $2.7M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jul 9, 2024 | P00067 | $6.2M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jun 20, 2024 | P00066 | $8.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jun 5, 2024 | P00065 | $4.6M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jun 3, 2024 | P00064 | $-145.2K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 30, 2024 | P00063 | $-3.2K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 29, 2024 | P00062 | $-6.6K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 17, 2024 | P00061 | $8.9M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 29, 2024 | P00060 | $18.6M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 17, 2024 | P00057 | $0 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 17, 2024 | P00058 | $191.4K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 17, 2024 | P00059 | $6.7M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 27, 2024 | P00056 | $5.4M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 8, 2024 | P00055 | $3.9M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 1, 2024 | P00054 | $4.2M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Feb 12, 2024 | P00053 | $16.4M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jan 25, 2024 | P00052 | $400.0K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jan 17, 2024 | P00051 | $3.6M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 23, 2023 | P00050 | $6.9M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 7, 2023 | P00049 | $3.8M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Nov 8, 2023 | P00048 | $6.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Nov 2, 2023 | P00047 | $0 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Oct 19, 2023 | P00046 | $14.2M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Oct 11, 2023 | P00045 | $1.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 21, 2023 | P00044 | $0 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 19, 2023 | P00043 | $9.2M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 6, 2023 | P00042 | $10.2M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 29, 2023 | P00041 | $0 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 18, 2023 | P00040 | $-92.0K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 14, 2023 | P00039 | $17.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jul 26, 2023 | P00038 | $7.6M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jun 21, 2023 | P00037 | $7.7M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jun 8, 2023 | P00036 | $2.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 25, 2023 | P00035 | $5.6M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 5, 2023 | P00033 | $6.2M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 5, 2023 | P00034 | $-66.1K | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 27, 2023 | P00032 | $2.5M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 10, 2023 | P00031 | $27.6M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 28, 2023 | P00030 | $7.5M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 1, 2023 | P00029 | $7.6M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Feb 17, 2023 | P00028 | $14.6M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jan 30, 2023 | P00027 | $14.8M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 20, 2022 | P00026 | $6.6M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 8, 2022 | P00025 | $0 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Nov 29, 2022 | P00024 | $9.3M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Nov 1, 2022 | P00023 | $15.1M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 26, 2022 | P00022 | $0 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Sep 14, 2022 | P00021 | $23.5M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 26, 2022 | P00020 | $13.8M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 9, 2022 | P00017 | $6.7M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 9, 2022 | P00018 | $4.8M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Aug 9, 2022 | P00019 | $-4.8M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jul 19, 2022 | P00016 | $9.4M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jun 8, 2022 | P00015 | $6.4M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jun 7, 2022 | P00014 | $5.1M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 6, 2022 | P00012 | $15.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 6, 2022 | P00013 | $0 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| May 3, 2022 | P00011 | $1.2M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Apr 28, 2022 | P00010 | $9.4M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 30, 2022 | P00009 | $3.7M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 4, 2022 | P00007 | $10.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Mar 4, 2022 | P00008 | $4.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Feb 2, 2022 | P00005 | $5.9M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Feb 2, 2022 | P00006 | $10.0M | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Jan 27, 2022 | P00004 | $0 | THIS MODIFICATION DEFINITIZES THE LETTER CONTRACT ISSUED ON SEPTEMBER 23, 2021, FROM SIR 693KA8-21-R-00004. PLEASE SEE ATTACHED TERMS AND CONDITIONS |
| Dec 9, 2021 | P00003 | $9.9M | CAASD MUST PROVIDE ESSENTIAL ENGINEERING, RESEARCH, AND ANALYSIS CAPABILITIES TO SUPPORT THE FAA IN THE PERFORMANCE OF ITS MISSION THROUGH A SYSTEMS APPROACH THAT ADDRESSES ALL DIMENSIONS (E.G. POLITICAL, OPERATIONAL, ECONOMIC, TECHNICAL) REQUIRED TO |
| Nov 3, 2021 | P00002 | $10.0M | CAASD MUST PROVIDE ESSENTIAL ENGINEERING, RESEARCH, AND ANALYSIS CAPABILITIES TO SUPPORT THE FAA IN THE PERFORMANCE OF ITS MISSION THROUGH A SYSTEMS APPROACH THAT ADDRESSES ALL DIMENSIONS (E.G. POLITICAL, OPERATIONAL, ECONOMIC, TECHNICAL) REQUIRED TO |
| Oct 25, 2021 | P00001 | $0 | CAASD MUST PROVIDE ESSENTIAL ENGINEERING, RESEARCH, AND ANALYSIS CAPABILITIES TO SUPPORT THE FAA IN THE PERFORMANCE OF ITS MISSION THROUGH A SYSTEMS APPROACH THAT ADDRESSES ALL DIMENSIONS (E.G. POLITICAL, OPERATIONAL, ECONOMIC, TECHNICAL) REQUIRED TO |
| Oct 20, 2021 | 0 | $0 | CAASD MUST PROVIDE ESSENTIAL ENGINEERING, RESEARCH, AND ANALYSIS CAPABILITIES TO SUPPORT THE FAA IN THE PERFORMANCE OF ITS MISSION THROUGH A SYSTEMS APPROACH THAT ADDRESSES ALL DIMENSIONS (E.G. POLITICAL, OPERATIONAL, ECONOMIC, TECHNICAL) REQUIRED TO |
Estimated positioning window
Sep 30, 2029 – Mar 30, 2030
50/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 50/100. Available recorded signals: 45 points.
- Contract end 2030-09-30 (1436 days from calculation)
- +5 points
- 63 historical awards in this buyer and category group
- +15 points
- 157 recorded award transactions
- +10 points
- Latest award action: 2026-09-04
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.