Federal contract award
6973GH22F01548
BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AT SILVER CITY, NM (SVC) ARSR JCN:19007420
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 6973GH FRANCHISE ACQUISITION SVCS |
| NAICS | 238210 — Electrical Contractors and Other Wiring Installation Contractors |
| PSC | N059 — Installation of Equipment: Electrical and Electronic Equipment Components |
| Parent award / vehicle | 6973GH22D00008 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $1.1M |
| Current contract value | $1.1M |
| Potential contract value / ceiling | $1.1M |
| Start date | Aug 26, 2022 |
| Current end date | Oct 31, 2026 |
| Potential end date | Oct 31, 2026 |
| Latest award activity | Apr 13, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 13, 2026 | P00005 | $0 | IIJA FUNDS. RFM TO CORRECT THE LINE OF ACOUNTING ON LINE ITEM 10 AT SILVER CITY, NM (SVC) ARSR EG JCN: 19007420 |
| Apr 1, 2026 | P00004 | $55.2K | IIJA FUNDS. CHANGE ORDER TO ALLOCATE FUNDS FOR CSP TO HIRE A SUBCONTRACTOR TO REMOVE AND DISPOSE OF ALL ASBESTOS CONTAINING MATERIAL (ACM) AT THE SILVER CITY, NM, (SVC) ARSR EG/UPS EQUIPMENT ROOM IN ACCORDANCE WITH THE SOW AND ASBESTOS MARKUP DRAWING |
| May 14, 2025 | P00003 | $144.4K | IIJA FUNDS, UPS REPLACEMENT COST FOR (JCN:19004782 LOC:SVC ARSR) SILVER CITY, NM (SVC) ARSR |
| Mar 13, 2025 | P00002 | $564.9K | IIJA FUNDS, SITE SPECIFIC FUNDING TO REMOVE THE EXISTING 125KW EG, AND REPLACE WITH A 125KW EG 208Y/120V, 3PH, ERMS V4 PANEL WITH CONDUIT, POWER AND GROUNDING, REMOVE THE EXISTING 4,000 GALLON FST AND INSTALL A 4,000 GALLON DIESEL FST FOR SILVER CIT |