Federal contract award

6973GH22F01650

BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AT AUSTIN, TX (VNK) ALS JCN:22001359

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office6973GH FRANCHISE ACQUISITION SVCS
NAICS238210 — Electrical Contractors and Other Wiring Installation Contractors
PSCN059 — Installation of Equipment: Electrical and Electronic Equipment Components
Parent award / vehicle6973GH22D00007
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$494.4K
Current contract value$494.4K
Potential contract value / ceiling$494.4K
Start dateSep 8, 2022
Current end dateJan 30, 2026
Potential end dateJan 30, 2026
Latest award activitySep 15, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 15, 2025P00003$396IIJA FUNDS. CHANGE ORDER TO ADDRESS THE ISSUE ON DRAWING PAGE E015, COORDINATES F5, WHERE THE DESIGN PACKAGE INDICATES THAT THREE OUTLETS/RECEPTACLES WERE TO BE FACTORY-INSTALLED AND WIRED TO A FACTORY-INSTALLED TERMINAL BLOCK; HOWEVER, THE TERMINAL
Aug 20, 2025P00002$9.3KIIJA FUNDS. CHANGE ORDER DUE TO THE EXISTING CONCRETE PAD IS SIGNIFICANTLY DEEPER THAN ANTICIPATED, REQUIRING LARGER EQUIPMENT AND AN ADDITIONAL DAY OF LABOR FOR DEMOLITION AT AUSTIN, TX (VNK) ALS JCN:22001359
Jul 3, 2025P00001$199.6KIIJA FUNDS. SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 175KW INDOOR EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 200KW OUTDOOR WITH SUBBASE EG 277/480V, 3PH IAW THE APPROVED DRAWINGS DATED 1/10/2025 AND THE 2022 125KW EG OUTDOOR BASELINE, ER
Sep 8, 20220$285.1KBIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AT AUSTIN, TX (VNK) ALS JCN:22001359

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.