Federal contract award
6973GH22F01676
BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AND LPGBS AT MERCED, CA (MCE) ASR JCN:22001391 / LPGBS BIL JCN 1106231
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 6973GH FRANCHISE ACQUISITION SVCS |
| NAICS | 238210 — Electrical Contractors and Other Wiring Installation Contractors |
| PSC | N059 — Installation of Equipment: Electrical and Electronic Equipment Components |
| Parent award / vehicle | 6973GH22D00009 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $522.2K |
| Current contract value | $522.2K |
| Potential contract value / ceiling | $522.2K |
| Start date | Sep 12, 2022 |
| Current end date | Jun 30, 2026 |
| Potential end date | Jun 30, 2026 |
| Latest award activity | Apr 14, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 14, 2026 | P00004 | $27.7K | IIJA FUNDS, CHANGE ORDER IS TO FUND THE COSTS ASSOCIATED WITH THE UTILITY AND CUTOVER DELAY FROM FEBRUARY 20, 2026 TO MARCH 14, 2026 AT MERCED, CA (MCE) ASR JCN:22001391 |
| Mar 9, 2026 | P00003 | $1.6K | IIJA FUNDS, THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO TO COVER THE EXPENSES RELATED TO CNS SUPPLYING 304 GALLONS OF PROPANE FOR THE STARTUP PROCESS, AS WELL AS MODIFYING THE PANEL BOARD CONFIGURATION IN PANEL BOARD DP7 FROM TWO 20-AMP BREAKERS |
| Feb 26, 2026 | P00002 | $9.0K | IIJA FUNDS, THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO FUND THE PURCHASE AND INSTALLATION OF CB1 CONTROL WIRING. FURNISH AND INSTALL ONE WALL-MOUNTED GRAVITY INTAKE DAMPER WITH EXTERIOR HOOD IN ACCORDANCE WITH THE SCOPE OF WORK DATED 2/10/2026. |
| Dec 10, 2025 | P00001 | $188.9K | IIJA FUNDS, SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 135KW EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 125KW EG 480Y/277V, 3PH IAW THE APPROVED DRAWINGS DATED 2/6/2025 AND THE 2022 125KW EG OUTDOOR BASELINE WITH ERMS INSTALLATION SOW, ER |
| Sep 12, 2022 | 0 | $295.0K | BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AND LPGBS AT MERCED, CA (MCE) ASR JCN:22001391 / LPGBS BIL JCN 1106231 |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.