Federal contract award

6973GH23F01029

ISSUE FUNDING FOR SITE SURVEY AND DESIGN OF OUTDOOR EG WITH SUBBASE TANK AT FORT SMITH, AR (FSM ATCT) JCN: 1500674

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office6973GH FRANCHISE ACQUISITION SVCS
NAICS238210 — Electrical Contractors and Other Wiring Installation Contractors
PSCN059 — Installation of Equipment: Electrical and Electronic Equipment Components
Parent award / vehicle6973GH22D00008
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$537.3K
Current contract value$537.3K
Potential contract value / ceiling$537.3K
Start dateApr 27, 2023
Current end dateMay 30, 2026
Potential end dateMay 30, 2026
Latest award activityApr 10, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 10, 2026P00004$3.6KCHANGE ORDER TO ALLOCATE FUNDS FOR THE DEMOBILIZATION/MOBILIZATION FOR THE RHELKO START UP DELAY AT FORT SMITH, AR (FSM) ATCT JCN: 1500674
Mar 23, 2026P00003$32.8KCHANGE ORDER DUE TO WEATHER DELAYS AND ASSOCIATED ADDITIONAL COSTS, INCLUDING ADDITIONAL LABOR, LODGING, MATERIALS, AND EQUIPMENTAT FORT SMITH, AR (FSM) ATCT) JCN: 1500674
Dec 18, 2025P00002$179.2KSITE-SPECIFIC REQUIREMENTS, INCLUDING REMOVAL OF THE EXISTING 2,000-GAL AST, ABOVEGROUND FUEL SUPPLY AND RETURN PIPING, LOAD BANK AND PAD, INTERIOR 350KW ENGINE GENERATOR, VEEDER ROOT, AND CONCRETE PAD; AND INSTALLATION OF A NEW 400KW EG SUB-BASE DIE
Dec 20, 2024P00001$288.7KADDITIONAL FUNDING FOR THE 2024 OUTDOOR EG BASELINE FOR FORT SMITH, AR (FSM ATCT) JCN: 1500674
Apr 27, 20230$33.0KISSUE FUNDING FOR SITE SURVEY AND DESIGN OF OUTDOOR EG WITH SUBBASE TANK AT FORT SMITH, AR (FSM ATCT) JCN: 1500674