Federal contract award
6973GH23F01726
BIL FUNDING FOR SITE SURVEY, DESIGN AND INSTALLATION REPLACEMENT FOR RALEIGH, NC (RDUC) ATCT JCN:1400778
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 6973GH FRANCHISE ACQUISITION SVCS |
| NAICS | 238210 — Electrical Contractors and Other Wiring Installation Contractors |
| PSC | N059 — Installation of Equipment: Electrical and Electronic Equipment Components |
| Parent award / vehicle | 6973GH22D00016 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $794.6K |
| Current contract value | $794.6K |
| Potential contract value / ceiling | $794.6K |
| Start date | Aug 23, 2023 |
| Current end date | Aug 7, 2026 |
| Potential end date | Aug 7, 2026 |
| Latest award activity | Jul 24, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 24, 2026 | P00004 | $150.6K | IIJA FUNDS: CHANGE ORDER FOR THE INITIAL CUTOVER TO TEMP EG WAS DELAYED BY 1 MONTH BY FAA SITE PERSONNEL WHICH ADD 2 WEEKS OF LABOR TO OVERALL SCHEDULE AT RALEIGH, NC (RDUC) ATCT JCN:1400778 |
| May 27, 2026 | P00003 | $11.5K | IIJA FUNDS: CHANGE ORDER FOR THE REMOB-DEMOB DUE TO THE CUTOVER DELAY, AND A CREDIT BACK FOR THE VINYLE FLOORING AT RALEIGH, NC (RDUC) ATCT JCN:1400778 |
| Jan 8, 2026 | P00002 | $311.3K | IIJA FUNDS: SITE SPECIFIC PRICING TO FUND THE ANOMALIES BETWEEN THE 2023 125KW OUTDOOR EG BASELINE INSTALLATION COST AND THE RDUC ATCT SITE-SPECIFIC INSTALLATION COST. THE WAGE DETERMINATION HAS BEEN UPDATED FROM NC20230040 04.21.2023 TO NC20250011 0 |
| Jun 3, 2025 | P00001 | $1.4K | IIJA FUNDS: CHANGE ORDER TO ALLOCATE ADDITIONAL DESIGN FUNDING TO INCLUDE REPLACING THE VINYL FLOOR AND EXISTING LIGHTING FIXTURE IN THE EG ROOM, AS WELL AS INCORPORATING AN ADVANCED METERING SYSTEM INTO THE DESIGN PACKAGE FOR RALEIGH, NC (RDUC) ATCT |
| Aug 23, 2023 | 0 | $319.6K | BIL FUNDING FOR SITE SURVEY, DESIGN AND INSTALLATION REPLACEMENT FOR RALEIGH, NC (RDUC) ATCT JCN:1400778 |