Federal contract award

6973GH23F01772

BIL FUNDING, FOR SITE SURVEY, DESIGN, AND INSTALLATION FOR REPLACEMENT PROJECT FOR WATERLOO, IA (ALOA) ASR JCN: 23007863

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office6973GH FRANCHISE ACQUISITION SVCS
NAICS238210 — Electrical Contractors and Other Wiring Installation Contractors
PSCN059 — Installation of Equipment: Electrical and Electronic Equipment Components
Parent award / vehicle6973GH22D00014
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$735.3K
Current contract value$735.3K
Potential contract value / ceiling$735.3K
Start dateAug 30, 2023
Current end dateMay 30, 2026
Potential end dateMay 30, 2026
Latest award activityMay 13, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 13, 2026P00004$9.6KCHANGE ORDER FOR QUAD J TO WIDEN THE GRAVEL ROAD BY THE SAME WIDTH THAT WILL BE REDUCED DUE TO THE NEW OUTDOOR EG INSTALLATION WITH SUBBASE. ADDITIONALLY, QUAD J IS TO PURCHASE AND INSTALL A NEW 48V BREAKER COIL IN THE GFM MDP BREAKER.
Apr 22, 2026P00003$14.4KWATERLOO, IA (ALOA) ASR UPS JCN: 21000998 THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ALLOCATE FUNDING TO THE TASK ORDER TO ENABLE QUAD J TO INSTALL MITSUBISHI HVAC UNITS DUE TO THEM NOT BEING ABLE TO FIND THE DAIKIN MINI-SPLIT HVAC UNITS PE
Mar 23, 2026P00002$1.2KWATERLOO, IA (ALOA) ASR UPS JCN: 21000998 THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ALLOCATE FUNDING TO THE TASK ORDER TO ENABLE QUAD J TO REMOVE AND REINSTALL THE BATTERIES SO THE RACK CAN BE TILTED TO FIT INSIDE THE ROOM.
Mar 4, 2026P00001$372.8KIIJA FUNDING, SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 100KW EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 137KW EG 120/208V, 3PH IAW THE APPROVED DRAWINGS DATED 2/4/2026 AND THE 2023 125KW EG INDOOR BASELINE WITH ERMS INSTALLATION SOW, FULL
Aug 30, 20230$337.2KBIL FUNDING, FOR SITE SURVEY, DESIGN, AND INSTALLATION FOR REPLACEMENT PROJECT FOR WATERLOO, IA (ALOA) ASR JCN: 23007863

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.