Federal contract award
6973GH25C00070
*REPLACE THE ENTRY AND EXIT GATES AT THE ATL ATCT *REMOVE THE EXISTING QUARTZ FLOORING SYSTEM THAT IS INSTALLED ON THE EXTERIOR OF THE 2ND FLOOR BREAKROOM PATIO AND ATCT BREEZEWAY, AND REPLACE THE FLOORING SYSTEM WITH A SIMILAR IN-KIND ASSEMBLY
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 6973GH FRANCHISE ACQUISITION SVCS |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2BA — REPAIR OR ALTERATION OF AIR TRAFFIC CONTROL TOWERS |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $236.8K |
| Current contract value | $236.8K |
| Potential contract value / ceiling | $236.8K |
| Start date | Feb 18, 2025 |
| Current end date | Jul 23, 2025 |
| Potential end date | Jul 31, 2025 |
| Latest award activity | Jun 23, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 23, 2025 | P00002 | $5.4K | *REPLACE THE ENTRY AND EXIT GATES AT THE ATL ATCT *REMOVE THE EXISTING QUARTZ FLOORING SYSTEM THAT IS INSTALLED ON THE EXTERIOR OF THE 2ND FLOOR BREAKROOM PATIO AND ATCT BREEZEWAY, AND REPLACE THE FLOORING SYSTEM WITH A SIMILAR IN-KIND ASSEMBLY |
| Mar 12, 2025 | P00001 | $0 | *REPLACE THE ENTRY AND EXIT GATES AT THE ATL ATCT *REMOVE THE EXISTING QUARTZ FLOORING SYSTEM THAT IS INSTALLED ON THE EXTERIOR OF THE 2ND FLOOR BREAKROOM PATIO AND ATCT BREEZEWAY, AND REPLACE THE FLOORING SYSTEM WITH A SIMILAR IN-KIND ASSEMBLY |
| Feb 18, 2025 | 0 | $231.5K | *REPLACE THE ENTRY AND EXIT GATES AT THE ATL ATCT *REMOVE THE EXISTING QUARTZ FLOORING SYSTEM THAT IS INSTALLED ON THE EXTERIOR OF THE 2ND FLOOR BREAKROOM PATIO AND ATCT BREEZEWAY, AND REPLACE THE FLOORING SYSTEM WITH A SIMILAR IN-KIND ASSEMBLY |
Research next steps
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.