Federal contract award
6973GH25F00278
BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE LITTLE ROCK, AR (LITC) ATCT (AR2) PER THE RFQ-25-02 BID PACKAGE. JCN: 18065822 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACI
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 6973GH FRANCHISE ACQUISITION SVCS |
| NAICS | 238210 — Electrical Contractors and Other Wiring Installation Contractors |
| PSC | N059 — Installation of Equipment: Electrical and Electronic Equipment Components |
| Parent award / vehicle | 6973GH22D00007 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $88.7K |
| Current contract value | $88.7K |
| Potential contract value / ceiling | $88.7K |
| Start date | Jan 13, 2025 |
| Current end date | Jun 9, 2025 |
| Potential end date | Jun 9, 2025 |
| Latest award activity | Mar 27, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Mar 27, 2025 | P00002 | $0 | BIL FUNDS. THE PURPOSE OF THIS TASK ORDER IS TO UPDATE THE JCN FROM 18065822 TO THE CORRECT JCN, 19004262. |
| Jan 23, 2025 | P00001 | $0 | BIL FUNDS. CHANGING LINE ITEM 2 FROM A FULL POWER SYSTEM STUDY TO A PARTIAL POWER SYSTEM STUDY. JCN: 18065822 |
| Jan 13, 2025 | 0 | $88.7K | BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE LITTLE ROCK, AR (LITC) ATCT (AR2) PER THE RFQ-25-02 BID PACKAGE. JCN: 18065822 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACI |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.