Federal contract award
6973GH25F00355
BIL FUNDS, CONDUCT INSTALLATION OF OUTDOOR EG WITH SUBBASE TANK AND ERMS PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT LONGVIEW, TX (GGGF) VOR JCN: 1500707
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 6973GH FRANCHISE ACQUISITION SVCS |
| NAICS | 238210 — Electrical Contractors and Other Wiring Installation Contractors |
| PSC | N059 — Installation of Equipment: Electrical and Electronic Equipment Components |
| Parent award / vehicle | 6973GH22D00015 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $293.1K |
| Current contract value | $293.1K |
| Potential contract value / ceiling | $293.1K |
| Start date | Jan 13, 2025 |
| Current end date | Oct 30, 2025 |
| Potential end date | Oct 30, 2025 |
| Latest award activity | Jun 17, 2025 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 17, 2025 | P00001 | $-90.2K | IIJA FUNDS. SITE SPECIFIC INSTALLATION INCLUDES THE REMOVAL OF THE EXISTING 30KW INDOOR EG, AND A 500-GALLON AST, UNDERGROUND FUEL LINES, CONCERT SUPPORT PAD, (10) BOLLARDS. INSTALLATION OF A NEW OUTDOOR 30 KW EG 120/208 VOLT, 3 PHASE, 4 WIRE, (9) BO |
| Jan 13, 2025 | 0 | $383.4K | BIL FUNDS, CONDUCT INSTALLATION OF OUTDOOR EG WITH SUBBASE TANK AND ERMS PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT LONGVIEW, TX (GGGF) VOR JCN: 1500707 |