Federal contract award

6973GH25F01106

IIJA FUNDS. SITE SPECIFIC INSTALLATION COST FOR EG AND FST REPLACEMENT, ERMS INSTALLATION AND FULL POWER SYSTEM STUDY AT OILTON, TX (QZA) ARSR JCN:23007873

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office6973GH FRANCHISE ACQUISITION SVCS
NAICS238210 — Electrical Contractors and Other Wiring Installation Contractors
PSCN059 — Installation of Equipment: Electrical and Electronic Equipment Components
Parent award / vehicle6973GH22D00007
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$835.0K
Current contract value$835.0K
Potential contract value / ceiling$835.0K
Start dateJul 17, 2025
Current end dateOct 31, 2026
Potential end dateOct 31, 2026
Latest award activityAug 24, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 24, 2026P00008$17.5KCHANGE ORDER TO EXTEND THE TEMP EG RENTAL BY ANOTHER 2-WEEK FROM 6/05/2026 THROUGH 6/19/2026 JCN:23007873
Jun 29, 2026P00007$5.6KCHANGE ORDER TO EXTEND THE TEMP EG RENTAL BY ANOTHER 2-WEEK FROM 6/05/2026 THROUGH 6/19/2026 JCN:23007873
Jun 16, 2026P00006$13.1KCHANGE ORDER FOR BULL WILLIAMS TO DEMOB/REMOB DUE TO THE FAA START UP DELAY SCHEDULED FOR MAY 19TH AND RESCHEDULED FOR JUNE 3RD. AND THE 2-WEEK TEMP POWER RENTAL EXTENSION FROM 5/22/2026 THROUGH 6/05/2026 JCN:23007873
Apr 24, 2026P00005$11.2KTHIS CHANGE ORDER INVOLVES THE REMOVAL OF A WOODEN POLE ESTIMATED TO BE 25 FEET TALL WITH AN UNKNOWN LENGTH UNDERGROUND, AS SPECIFIED IN THE SCOPE OF WORK. IT INCLUDES A CREDIT FOR THE REMOVAL OF THE LRR PANEL "ARSR TCS," WHICH IS A 208/120
Apr 14, 2026P00004$3.3KIIJA FUNDS. CHANGE ORDER FOR THE FUEL TANK STORAGE FEES DUE TO DELAY IN CONSTRUCTION START DATE WAS DELAYED AND ADDITIONAL MEETINGS/COORDINATION TIME AT OILTON, TX (QZA) ARSR JCN:23007873.
Feb 26, 2026P00003$4.6KIIJA FUNDS. CHANGE ORDER FOR THE FUEL TANK STORAGE FEES DUE TO DELAY IN CONSTRUCTION START AT OILTON, TX (QZA) ARSR JCN:23007873.
Nov 7, 2025P00002$-42.5KIIJA FUNDS. DE-OBLIGATE THE LRR FUNDS INITIALLY ALLOCATED TO LINE ITEM 1, AS A NEW LINE ITEM FOR THE LRR HAS BEEN CREATED UNDER LINE ITEM 5. JCN:23007873.
Sep 23, 2025P00001$42.5KIIJA FUNDS. JCN:23007873. REPLACE/REPAIR ELECTRICAL POWER DISTRIBUTION EQUIPMENT IN ACCORDANCE WITH THE OILTON TX QZA ARSR STATEMENT OF WORK DATED FEBRUARY 21, 2024.
Jul 17, 20250$779.8KIIJA FUNDS. SITE SPECIFIC INSTALLATION COST FOR EG AND FST REPLACEMENT, ERMS INSTALLATION AND FULL POWER SYSTEM STUDY AT OILTON, TX (QZA) ARSR JCN:23007873

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2026-10-31 (6 days from calculation)
+35 points
674 historical awards in this buyer and category group
+15 points
9 recorded award transactions
+10 points
Latest award action: 2026-08-24
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.