Federal contract award
6973GH25F01359
IIJA (ZMP) MINNEAPOLIS ARTCC - COMBINED PHASE I & II MOBILE POWER INSTALLATION, ACEPS II TEMPORARY POWER INSTALL, PER VENDOR PROPOSAL 25BX58.00, DATED 8/29/2025.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 6973GH FRANCHISE ACQUISITION SVCS |
| NAICS | 238210 — Electrical Contractors and Other Wiring Installation Contractors |
| PSC | N059 — Installation of Equipment: Electrical and Electronic Equipment Components |
| Parent award / vehicle | 6973GH22D00011 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $5.6M |
| Current contract value | $5.6M |
| Potential contract value / ceiling | $5.6M |
| Start date | Sep 9, 2025 |
| Current end date | Sep 30, 2026 |
| Potential end date | Sep 30, 2026 |
| Latest award activity | Aug 14, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 14, 2026 | P00004 | $70.7K | M.C. DEAN WILL FURNISH THE MANPOWER, TOOLS, MATERIAL, AND EQUIPMENT TO REWORK THE EXISTING DLO CONDUCTOR TERMINATIONS AT VARIOUS POINTS WITHIN THE TEMPORARY POWER SYSTEM FOR THE ACEPS II PHASE 2 TEMP 2 OPERATIONS AT THE ZMP ARTCC. THIS INCLUDES AREAS |
| Aug 3, 2026 | P00003 | $12.7K | CHANGE ORDER FOR MC DEAN TO DESIGN AND INSTALL ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPERVISION, TESTING, AND DOCUMENTATION NECESSARY TO MODIFY THE EXISTING FUEL SUPPLY AND RETURN PIPING ASSOCIATED WITH THE ZMP ARTCC ACEPS TEMP 2 EMERGENCY GENERAT |
| Jun 9, 2026 | P00002 | $160.0K | CHANGE ORDER FOR MC DEAN TO DESIGN AND INSTALL THE MISSING FUEL CONTROL SYSTEM AS PART OF THE ZMP ARTCC TEMPORARY TRAILER INSTALLATION. JCN: 1006714 |
| Sep 24, 2025 | P00001 | $114.6K | IIJA (ZMP) MINNEAPOLIS ARTCC - COMBINED PHASE I & II MOBILE POWER INSTALLATION, ACEPS II TEMPORARY POWER INSTALL, PER VENDOR PROPOSAL 25BX58.00, DATED 8/29/2025. |
| Sep 9, 2025 | 0 | $5.3M | IIJA (ZMP) MINNEAPOLIS ARTCC - COMBINED PHASE I & II MOBILE POWER INSTALLATION, ACEPS II TEMPORARY POWER INSTALL, PER VENDOR PROPOSAL 25BX58.00, DATED 8/29/2025. |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.