Federal contract award

697DCK19F00179

WARRENTON VA DESIGN PROJECT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office697DCK REGIONAL ACQUISITIONS SVCS
NAICS541330 — Engineering Services
PSCC1BA — ARCHITECT AND ENGINEERING- CONSTRUCTION: AIR TRAFFIC CONTROL TOWERS
Parent award / vehicle697DCK19D00002
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$26.0M
Current contract value$26.0M
Potential contract value / ceiling$26.0M
Start dateSep 24, 2019
Current end dateSep 30, 2028
Potential end dateSep 30, 2028
Latest award activityAug 13, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 88 of 88 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 13, 2026P00087$596.7KSNA ATCT HVAC & CONTROLS REPLACEMENT PER CP D24-098
Jul 20, 2026P00086$1.2MWJHTC CAFETERIA RENOVATION DESIGN PROJECT PER CP D24-096A
Jun 3, 2026P00085$349.7KLAGUARDIA AIRPORT (LGA) LLWAS SYSTEM RELOCATION PER CP D24-095
Apr 9, 2026P00084$265.1KKAHULUI ATCT (OGG) HVAC REPLACEMENT DESIGN PER CP D24-094
Mar 23, 2026P00083$262.7KFORT DODGE REGIONAL AIRPORT (FOD) RUNWAY 6 MALSR REPLACEMENT PER CP D24-089, PHASE 2 ONLY
Jan 26, 2026P00082$-47.6KCANCEL OF SEATTLE, WA (SEA) ATCT AND BASE BUILDING PARTIAL ROOF REPLACEMENT PER CP D24-054A
Nov 18, 2025P00081$68.1KORD SOUTH ATCT (ORDB) GEOTHERMAL HEATING & COOLING SYSTEM PER CP D24-091A
Sep 15, 2025P00080$2.8MNORTHERN CALIFORNIA TRACON (NCT) CHILLER REPLACEMENT AND MISCELLANEOUS COMPONENTS DESIGN PER CP D24-087 AND NEW YORK TRACON (N90) MAJOR MODERNIZATION AND REPLACEMENT DESIGN PER CP D24-092
Sep 9, 2025P00079$2.4MPHILADELPHIA (PHL) TRACON BB EXPANSION AND MODIFICATION PER CP D24-090A
Jul 23, 2025P00078$1.1MLEEVILLE, LA (LEV) VORTAC ADDITIONAL DESIGN SERVICES PER CP D24-086 & GUAM (GUM) ATCT CAB REPLACEMENT PHASE II PER CP D24-088
Jun 26, 2025P00077$-18.8KOAK GSHP DE-OBLIGATION
Jun 2, 2025P00075$-171.3KSEATTLE, WA TRACON MAJOR MECHANICAL UPGRADES PER CP D24-039
Jun 2, 2025P00076$-18.9KSEATTLE, WA (SEA) ATCT AND BASE BUILDING MAJOR MECHANICAL DEOBLIGATION
May 21, 2025P00074$175.2KGUAM (GUM) ATCT CAB REPLACEMENT TECHNICAL SUPPORT AND DESIGN SERVICES (PHASE 1) PER CP D24-082
May 1, 2025P00073$0TEB ATCT DEMO ENVIRONMENTAL MANAGEMENT PLAN PER CP D24-085
Mar 24, 2025P00072$-134.3KDE-OBLIGATE EXCESS FUNDS FROM HOUSTON INTERCONTINENTAL AIRPORT (IAH) ALSF
Nov 19, 2024P00071$96.6KFORT DODGE REGIONAL AIRPORT (FOD) RUNWAY 6 MALSR REPLACEMENT PER CP D24-080
Oct 28, 2024P00070$24.8KLEEVILLE, LA (LEV) VORTAC ADDITIONAL REVIEW AND COORDINATION SERVICES FOR GEOTECHNICAL INVESTIGATION PER CP D24-078 & CHICAGO O'HARE (ORD) HVAC SYSTEM DESIGN OVER-RUNS PER CP D24-076
Aug 20, 2024P00069$658.5KHATTIESBURG-LAUREL REGIONAL AIRPORT (PIB) PHASE 2 DESIGN SERVICES AND PHASE 3 CONSTRUCTION ADMINISTRATION SUPPORT PER CP D24-077
Jul 29, 2024P00068$0WILLIAM J HUGHES TECHNICAL CENTER - FENS DATA CENTER REVISED SCOPE PER CP D24-073
Jul 23, 2024P00067$37.3KGILLESPIE (SEE) ATCT MODERNIZE ELECTRICAL & MECHANICAL SYSTEMS PER CP D24-068
Jun 11, 2024P00066$299.2KTETERBORO ATCT (TEB), NEW JERSEY DEMOLITION DESIGN PER CP D24-074
May 20, 2024P00065$79.5KEWR TOWER SIMULATION SYSTEM (TSS) RELOCATION, NEWARK, NJ PER CP D24-075
Apr 24, 2024P00063$0WILLIAM J HUGHES TECHNICAL CENTER - FENS DATA CENTER REVISED SCOPE PER CP D24-073
Apr 24, 2024P00064$0CHARLOTTE ATCT & TRACON (CLT) DEMO PHASE IV PER CP D24-072, NO COST CP
Apr 18, 2024P00062$238.4KHONOLULU CONTROL FACILITY AND ATCT FIA MODERNIZATION & OFDPS REPLACEMENT (HNL/HCF) FUNDING
Mar 25, 2024P00061$0PHL TRACON EXPANSION DEOB CP D24-069 FUNDING PREVIOUSLY DEOB IN MODP00060
Feb 20, 2024P00060$-427.6KFUNDING ACTION TO DEOB EXCESS FUNDS FROM PHL TO TO 23 N90
Feb 7, 2024P00059$105.5KPIB RUNWAY 18 MALSR REPLACEMENT TO INCLUDE SITE VISIT, TOPOGRAPHIC SURVEY, SITE VISIT REPORT AND TOPOGRAPHIC REPORT, CONDUCT MEETINGS/CALL TO ADDRESS COMMENTS, AND PREPARE/SUBMIT A FOLLOW-ON CHANGE PROPOSAL FOR PHASE 2 SERVICES FOR FULL DESIGN SERVIC
Nov 6, 2023P00058$205.0KNEWARK (EWR) ATCT TOWER SIM SYSTEM (TSS) RELOCATION PER CP D24-066
Nov 1, 2023P00057$459.7KHOUMA-TERREBONNE AIRPORT (HUM) RUNWAY 18 MALSR REPLACEMENT PHASE 2 DESIGN CONSTRUCTION SUPPORT SERVICES PER CP D24-063, LOUIS ARMSTRONG INTERNATIONAL AIRPORT (MSY) HOX MALSR REPAIR PHASE 2 DESIGN CONSTRUCTION SUPPORT SERVICES PER CP D24-064 AND GRAND
Oct 23, 2023P00056$607.0KGRAND ISLE, LA (LEV) LEEVILLE VOR FACILITY REPLACEMENT, PHASE 2 DESIGN PER CP D24-059
Sep 8, 2023P00055$519.8KHOUMA-TERREBONNE AIRPORT (HUM) RUNWAY 18 MALSR DESIGN SERVICES PER CP D24-060 & LOUIS ARMSTRONG INTERNATIONAL AIRPORT (MSY) HOX MALSR REPAIR DESIGN SERVICES PER CP D24-061
Aug 23, 2023P00054$6.8KHONOLULU, HI (HCF) ROOF REPLACEMENT SCOPE CHANGES PER CP D24-062
Aug 7, 2023P00053$279.4KGREAT FALLS, MT (GTF) ATCT AND BASE BUILDING CHILLER REPLACEMENT DESIGN SERVICES PER CP D24-057
Aug 3, 2023P00052$171.0KHONOLULU CONTROL FACILITY (HCF) CHILLER REPLACEMENT DESIGN PER CP D24-056
Aug 1, 2023P00050$26.0KKAHULUI ATCT (OGG) FIA MODERNIZATION ADDITIONAL DESIGN PER CP D24-055
Aug 1, 2023P00051$-135.0KWJHTC COCKPIT SIMULATION DEOBLIGATION OF CP D24-035A
Apr 27, 2023P00049$47.6KSEATTLE, WA (SEA) ATCT AND BASE BUILDING PARTIAL ROOF REPLACEMENT PER CP D24-054A
Apr 12, 2023P00048$723.6KORD ATCT (CHICAGO, IL) - MAJOR MECHANICAL UPGRADES TECHNICAL SUPPORT & DESIGN SERVICES PER CP D24-045B & CHARLOTTE (CLT) ATCT & TRACON HAZMAT & DEMO DESIGN PER CP D24-052
Apr 4, 2023P00047$128.4KSOUTHERN CALIFORNIA (SCT) TRACON MODERNIZATION COST RECONCILIATION PER CP D24-053
Mar 27, 2023P00046$47.5KHONOLULU, HI (HCF) ROOF REPLACEMENT PER CP D24-042
Mar 2, 2023P00045$51.6KN90 TRACON (WESTBURY,NY) - WELLNESS CENTER DESIGN PER CP D24-046
Feb 16, 2023P00044$195.4KGILLESPIE (SEE) ATCT MODERNIZATION SURVEY REPORT & 10% DESIGN, INCLUDING A ROM ESTIMATE PER CP D24-044 AND LEEVILLE (LEV) VOR FACILITY REPLACEMENT PHASE I PER CP D24-047
Feb 9, 2023P00043$158.0KPHL EXPANSION DESIGN INCREMENTAL FUNDING
Feb 8, 2023P00042$187.1KHOUMA-TERREBONNE AIRPORT (HUM) RUNWAY 18 MALSR REPLACEMENT PER CP D24-049 & LOUIS ARMSTRONG INTERNATIONAL AIRPORT (MSY) HOX MALSR REPLACEMENT PER CP D24-050
Feb 1, 2023P00041$514.5KHONOLULU CONTROL FACILITY (HCF) OFDPS REPLACEMENT DESIGN PER CP D24-048
Jan 19, 2023P00040$-875.0KDEOBLIGATE BIL-FUNDED CP D24-043A AND MOVE TO APPROPRIATE BIL-FUNDED TASK
Dec 8, 2022P00039$880.1KSAN ANTONIO (SAT) ATCT & BASE BUILDING FIA MODERNIZATION PER CP D24-043A
Dec 7, 2022P00038$554.8KWJHTC - FENS DATA CENTER 100% DESIGN PER CP D24-041
Nov 3, 2022P00037$416.4KCP D24-038 SEATTLE, WA (SEA) ATCT AND BASE BUILDING MAJOR MECHANICAL UPGRADE DESIGN
Nov 2, 2022P00036$548.1KCP D24-037 N90 EV CHARGING DESIGN & CP D24-039 SEA TRACON MODERNIZATION DESIGN
Sep 22, 2022P00035$67.7KHONOLULU (HCF) FIA MODERNIZATION OFDPS REPLACEMENT PER CP D24-040
Sep 15, 2022P00034$380.4KGILLESPIE (SEE) ATCT MODERNIZE ELECTRICAL & MECHANICAL SYSTEMS PER CP D24-034A
Aug 31, 2022P00033$263.9KCLT PHASE 3 DEMO CP D24-032
Aug 23, 2022P00032$142.7KWJHTC FENS DATA CENTER PER CP D24-031
Aug 22, 2022P00030$38.0KCP D24-033 - LGB FIA MODERNIZATION - ADDED SCOPE
Aug 22, 2022P00031$211.1KWJHTC COCKPIT SIMULATION FACILITY (CSF) PER CP D24-035A
Aug 4, 2022P00029$0CP D24-036 - POTOMAC (PCT) PARKING LOT EXPANSION CONSTRUCTION SUPPORT
Jun 7, 2022P00028$175.6KCP D24-027 HCF FIA, CP D4-028 OGG FIA, CP D24-029 WARRENTON RECONCILIATION, CP D24-030 CLT DEMO
May 16, 2022P00027$20.0KINCREMENTAL FUNDING FOR CP PREP
Mar 22, 2022P00026$76.9KOGG PV SYSTEM PER CP D24-021 & HCF ROOF SUB SUPPORT SERVICES PER CP D24-026
Feb 14, 2022P00025$191.2KCP D24-023 CLT DEMO DESIGN & CP D24-024 SCT MODERNIZATION CHANGE
Feb 8, 2022P00024$200.0KSCT & LGB FUNDING
Feb 7, 2022P00023$34.6KHCF ROOF SUBCONSULTANT PER CP D24-025
Jan 26, 2022P00022$0N90 PA SYSTEM PER CP D24-022
Jan 10, 2022P00021$0PHL TRACON EXPANSION CP D24-020
Dec 8, 2021P00020$558.2KBOS ATCT MODERNIZATION PER CP D24-018A
Dec 6, 2021P00019$227.5KHCF ROOF REPLACEMENT PER CP D24-019
Nov 4, 2021P00018$630.2KOGG ADDITIONAL DESIGN WORK PER CP D24-011A, OAK GSHP PER CP D24-016, IAH ALSF-2 PER CP D24-017
Nov 3, 2021P00017$1.0MEWR-PHL PROJECT
Sep 8, 2021P00016$798.1KHONOLULU ATCT (HNL) & CONTROL FACILITY (HCF) FIA MODERNIZATION
Aug 18, 2021P00015$79.9KSOUTHERN CALIFORNIA TRACON (SCT) MODERNIZATION
Aug 5, 2021P00014$0PCT PARKING LOT PER CP D24-013
Aug 4, 2021P00013$73.1KFUNDING FOR HNL/HCF ATCT SURVEY & FIA SUPPORT PER CP D24-012
Jul 28, 2021P00012$0HNL/HCF ATCT SURVEY & FIA SUPPORT PER CP D24-012
Jul 14, 2021P00011$0PHL TRACON EXPANSION PER CP D24-010
Jul 7, 2021P00010$73.8KOGG ON-SITE SURVEY CP D24-009
May 25, 2021P00009$500.0KEWR TO PHL AIR SPACE REDESIGN
May 4, 2021P00008$42.0KLGB SITE SURVEY
Apr 15, 2021P00007$71.3KSCT FIA MODERNIZATION TOPOGRAPHIC SURVEY, PIPE TESTING
Mar 17, 2021P00006$0TERMINAL FACILITIES MODERNIZATION & REPLACEMENT DESIGN
Feb 1, 2021P00005$1.6MTERMINAL FACILITIES MODERNIZATION & REPLACEMENT DESIGN
Dec 10, 2020P00004$394.2KTERMINAL FACILITIES MODERNIZATION & REPLACEMENT DESIGN
Oct 28, 2020P00003$682.8KTERMINAL FACILITIES MODERNIZATION&REPLACEMENT DESIGN
Jul 30, 2020P00002$-2.2MWARRENTON VA DESIGN PROJECT
May 19, 2020P00001$0WARRENTON VA DESIGN PROJECT
Sep 24, 20190$4.0MWARRENTON VA DESIGN PROJECT

Estimated positioning window

Sep 30, 2027 – Mar 30, 2028

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2028-09-30 (706 days from calculation)
+25 points
27 historical awards in this buyer and category group
+15 points
88 recorded award transactions
+10 points
Latest award action: 2026-08-13
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.