Federal contract award
697DCK22F00729
ENROUTE BIL FUNDED PROJECT TASK - ZME UNDERGROUND UTILITY PROJECT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 697DCK REGIONAL ACQUISITIONS SVCS |
| NAICS | 541330 — Engineering Services |
| PSC | C1BA — ARCHITECT AND ENGINEERING- CONSTRUCTION: AIR TRAFFIC CONTROL TOWERS |
| Parent award / vehicle | 697DCK19D00002 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $13.7M |
| Current contract value | $13.7M |
| Potential contract value / ceiling | $13.7M |
| Start date | Mar 22, 2022 |
| Current end date | Sep 30, 2028 |
| Potential end date | Sep 30, 2028 |
| Latest award activity | Aug 19, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 36 of 36 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 9, 2026 | P00035 | $55.8K | ZNY ARTCC, RONKONKOMA, NY UNDERGROUND UTILITIES REPLACEMENT SCOPE REVISIONS PER CP D34-044 |
| Aug 19, 2026 | P00034 | $-17.8K | ATLANTA ARTCC (ZTL) UNDERGROUND UTILITIES REPLACEMENT PROJECT RECONCILIATION PER CP D34-042 |
| Aug 5, 2026 | P00033 | $66.9K | ZJX ARTCC, HILLIARD, FL ULTRASONIC PIPE TESTING FOR UNDERGROUND UTILITIES PER CP D34-043 |
| Jun 25, 2026 | P00032 | $0 | ENROUTE COR REASSIGNMENT FROM LINZY JUNGE TO ERIN EDMONDS DUE TO ORGANIZATIONAL REALIGNMENTS. |
| Apr 28, 2026 | P00031 | $44.4K | ZNY ARTCC, RONKONKOMA, NY UNDERGROUND UTILITIES SEPTIC TANK INSPECTION PER CP D34-041 |
| Mar 23, 2026 | P00030 | $22.4K | ZLC ARTCC, SALT LAKE CITY, UT ULTRASONIC PIPE TESTING FOR UNDERGROUND UTILITIES PER CP D34-039 |
| Feb 19, 2026 | P00029 | $445.6K | ZJX ARTCC, HILLIARD, FL UNDERGROUND UTILITIES REPLACEMENT PER CP D34-038C |
| Feb 4, 2026 | P00028 | $542.0K | ZNY ARTCC, RONKONKOMA, NY UNDERGROUND UTILITIES REPLACEMENT PER CP D34-037B |
| Dec 9, 2025 | P00027 | $48.4K | ZUA UNDERGROUND UTILITIES DESIGN SEPARATION PER CP D34-035B |
| Nov 18, 2025 | P00026 | $43.8K | ZME COOLING TOWER YARD TEMPORARY CONNECTION PER CP D34-034 & ZME CONDENSER CHILLED WATER STAND-ALONE PROJECT PER CP D34-036 |
| Sep 9, 2025 | P00025 | $2.5M | FY26 FACILITY CONDITION ASSESSMENTS (ZHU, ZJX, ZOA, ZSE, ZMP AND ZLC) PER CP D34-033A |
| Jul 30, 2025 | P00024 | $-16.6K | ZME UNDERGROUND UTILITY RELOCATION AND PARKING LOT MODERNIZATION RECONCILIATION DE-OBLIGATION PER CP D34-032 |
| Jun 11, 2025 | P00023 | $44.0K | ZOA UNDERGROUND UTILITIES CONDENSER WATER PIPING REPLACEMENT PER CP D34-031 |
| Apr 23, 2025 | P00022 | $61.4K | 2024 FACILITY CONDITION ASSESSMENT RECONCILIATIONS PER CP D34-028 & ATLANTA (ZTL) ARTCC UNDERGROUND UTILITIES REPLACEMENT DESIGN DESCOPE PER CP D34-030 |
| Feb 10, 2025 | P00021 | $214.0K | MEMPHIS ARTCC (ZME) REPLACEMENT OF CONDENSER, CHILLED WATER SUPPLY AND RETURN PIPING PER CP BE0034-023 & OAKLAND ARTCC (ZOA) UG UTILITY MODERNIZATION CHILLED WATER PIPING AND DESCOPING PORTIONS OF THE WATER LINE AND SANITARY SEWER REPLACEMENT PER |
| Dec 18, 2024 | P00020 | $155.2K | ATLANTA ARTCC (ZTL) UNDERGROUND UTILITIES REPLACEMENT CONNECTING THE HYDRANT LOOP AND THE SPRINKLER SYSTEM TO HENRY COUNTY PER CP BE0034-021A |
| Nov 4, 2024 | P00019 | $30.7K | ZLA ZLC ZOA ZSU UNDERGROUND UTILITIES REPLACEMENT RECONCILIATION APPROVED ALLOWANCE COSTS (CONSULTANTS, TRAVEL) WITH ACTUAL COSTS FOR TASKS COMPLETED PER CP BE0034-024 |
| Sep 18, 2024 | P00018 | $0 | EV CHARGING STATIONS DE-SCOPE FOR ZDC, ZSU, ZTL, ZUA, ZLC, AND ZOA |
| Sep 12, 2024 | P00017 | $3.0M | FY25 FACILITY CONDITION ASSESSMENTS (ZMA, ZME, ZAB, ZKC, ZAN, ZLA, FMH AND MD) PER CP BE0034-022 |
| Aug 7, 2024 | P00016 | $10.8K | OAKLAND, CA (ZOA) ARTCC NON-LABOR RECONCILIATION PER CP BE0034-019 |
| Jul 9, 2024 | P00015 | $67.2K | ZLC ARTCC, SALT LAKE CITY, UT ADDITIONAL UTILITY SURVEY FOR SANITARY SEWER PIPE REPLACEMENT AND DESIGN OF TEMPORARY AIR-COOLED CHILLERS AND SUPPORTING INFRASTRUCTURE TO THE ONGOING ZLC ARTCC UNDERGROUND UTILITY DESIGN PER CP BE0034-017 |
| Jun 11, 2024 | P00014 | $837.4K | ZTL & ZFW FACILITY CONDITION ASSESSMENTS (FCAS) PER CP BE0034-016 & ATLANTA ARTCC (ZTL) FIRE SUPPRESSION WATER SOURCES STUDY PER CP BE0034-018A |
| Mar 12, 2024 | P00013 | $15.0K | ZTL UNDERGROUND UTILITY TRAVEL AND CONSULTATION ODCS |
| Feb 1, 2024 | P00012 | $29.7K | SAN JUAN (ZSU) CCF REMOVAL AND REPLACEMENT OF THE ABOVE GROUND DOMESTIC WATER DAY TANK, ASSOCIATED PIPING AND EQUALIZATION PIPING FOR THE WATER MAKE-UP AND FIRE WATER TANKS PER CP BE0034-013 |
| Jan 24, 2024 | P00011 | $60.9K | WASHINGTON ARTCC (ZDC) UNDERGROUND UTILITY DESIGN SCOPE CHANGE TO REDESIGN UNDERGROUND UTILITY ALIGNMENT AND CONNECTION POINTS, AND TO DE-SCOPE THE INCLUSION OF CONSTRUCTION ADMINISTRATION SUPPORT PER CP BE0034-012 |
| Jan 17, 2024 | P00010 | $7.5K | ZSU UNDERGROUND UTILITY TRAVEL ODCS (CP BE0034-006) |
| Oct 23, 2023 | P00009 | $3.0M | FY 2024 FACILITY CONDITION ASSESSMENTS (ZDC, DCC, ZSU, ZID, ZOB, ZNY, ZAU, ZBW) PER CP BE0034-010B |
| Sep 21, 2023 | P00008 | $325.3K | ZOA ARTCC, FREMONT, CA REPLACE U/G UTILITIES AND INSTALLATION OF 8 NEW ELECTRIC VEHICLE CHARGING STATIONS DESIGN PER CP BE0034-011 |
| Sep 8, 2023 | P00007 | $647.8K | ZLA ARTCC, PALMDALE, CA REPLACE U/G MECHANICAL UTILITIES AND REFURBISH PARKING LOT PROJECT DESIGN PER CP BE0034-008A ZLC ARTCC, SALT LAKE CITY, UT REPLACE U/G UTILITIES AND INSTALLATION OF 12 NEW ELECTRIC VEHICLE CHARGING STATIONS DESIGN PER CP BE |
| Jun 5, 2023 | P00006 | $24.0K | ENROUTE BIL FUNDED PROJECT TASK - ZSU COMBINED CONTROL FACILITY (CCF), SAN JUAN, PUERTO RICO ADDITIONAL DESIGN SERVICES FOR MILL AND OVERLAY OF THE FMP YARD PARKING LOT PER CP BE0034-006 AND ZME ARTCC, MEMPHIS, TN ADDITIONAL ELECTRICAL DESIGN FOR REP |
| Feb 22, 2023 | P00005 | $237.5K | ENROUTE BIL FUNDED PROJECT TASK - ATLANTA (ZTL) ARTCC UNDERGROUND UTILITIES PER CP BE0034-004B |
| Dec 13, 2022 | P00004 | $228.8K | ENROUTE BIL FUNDED PROJECT TASK - GUAM (ZUA) CCF UNDERGROUND UTILITY AND REFURBISH PARKING LOT PER CP BE0034-005 |
| Sep 7, 2022 | P00003 | $40.4K | ENROUTE BIL FUNDED PROJECT TASK -ZME SOIL INVESTIGATION PER CP BE0034-003 |
| Aug 4, 2022 | P00002 | $387.4K | ENROUTE BIL FUNDED PROJECT TASK - ZSU UNDERGROUND UTILITY PROJECT PER CP BE0034-002A |
| Apr 27, 2022 | P00001 | $233.7K | ENROUTE BIL FUNDED PROJECT TASK - ZDC UNDERGROUND UTILITY PROJECT PER CP BE0034-001 |
| Mar 22, 2022 | 0 | $345.6K | ENROUTE BIL FUNDED PROJECT TASK - ZME UNDERGROUND UTILITY PROJECT |
Estimated positioning window
Sep 30, 2027 – Mar 30, 2028
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2028-09-30 (706 days from calculation)
- +25 points
- 27 historical awards in this buyer and category group
- +15 points
- 36 recorded award transactions
- +10 points
- Latest award action: 2026-08-19
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.