Federal contract award
6982AF18F000073
CA FLAP 03S11(1) REDS MEADOW ROAD GEOTECHNICAL INVESTIGATIONS&30% DESIGN
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 6982AF CENTRAL FEDERAL LANDS DIVISI |
| NAICS | 541330 — Engineering Services |
| PSC | C1LB — ARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | DTFH6816D00007 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $1.7M |
| Current contract value | $1.7M |
| Potential contract value / ceiling | $1.7M |
| Start date | Apr 13, 2018 |
| Current end date | Sep 30, 2022 |
| Potential end date | Sep 30, 2022 |
| Latest award activity | Dec 9, 2020 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 14, 2022 | P00008 | $0 | CA FLAP 03S11(1) REDS MEADOW ROAD MODIFICATION TO CORRECT FUNDING ERROR IN MOD P00007 |
| Jun 15, 2022 | P00007 | $52.2K | CA FLAP 03S11(1) REDS MEADOW ROAD MODIFICATION FOR WORK THROUGH 100% PLANS AND ESTIMATE DELIVERY |
| Sep 14, 2021 | P00006 | $116.4K | CA FLAP 03S11(1) REDS MEADOW ROAD |
| Dec 9, 2020 | P00005 | $0 | CA FLAP 03S11(1) REDS MEADOW ROAD DTFH6816D00007 6982AF18F000073 MOD P00005 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE TO 9/30/22. |
| Jul 21, 2020 | P00004 | $0 | CA FLAP 03S11(1) REDS MEADOW ROAD DTFH6816D00007 6982AF18F000073 MOD P00004 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE TO 12/31/20, AND TO CHANGE THE COR TO DUSTIN ROBBINS. |
| Sep 3, 2019 | P00003 | $469.5K | CA FLAP 03S11(1) REDS MEADOW ROAD MODIFICATION P00003 ADDS IN 70% SURVEY ITEMS, ADDITIONAL DESIGN AT DEPO, AND OPTION PACKAGING |
| Apr 27, 2019 | P00002 | $59.4K | CA FLAP 03S11(1) REDS MEADOW ROAD FINAL DESIGN |
| Aug 31, 2018 | P00001 | $628.9K | CA FLAP 03S11(1) REDS MEADOW ROAD FINAL DESIGN |
| Apr 13, 2018 | 0 | $389.2K | CA FLAP 03S11(1) REDS MEADOW ROAD GEOTECHNICAL INVESTIGATIONS&30% DESIGN |
| Apr 13, 2018 | P00009 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CLOSEOUT THE TASK ORDER. |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.