Federal contract award

6982AF18F000073

CA FLAP 03S11(1) REDS MEADOW ROAD GEOTECHNICAL INVESTIGATIONS&30% DESIGN

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office6982AF CENTRAL FEDERAL LANDS DIVISI
NAICS541330 — Engineering Services
PSCC1LB — ARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleDTFH6816D00007
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$1.7M
Current contract value$1.7M
Potential contract value / ceiling$1.7M
Start dateApr 13, 2018
Current end dateSep 30, 2022
Potential end dateSep 30, 2022
Latest award activityDec 9, 2020
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 14, 2022P00008$0CA FLAP 03S11(1) REDS MEADOW ROAD MODIFICATION TO CORRECT FUNDING ERROR IN MOD P00007
Jun 15, 2022P00007$52.2KCA FLAP 03S11(1) REDS MEADOW ROAD MODIFICATION FOR WORK THROUGH 100% PLANS AND ESTIMATE DELIVERY
Sep 14, 2021P00006$116.4KCA FLAP 03S11(1) REDS MEADOW ROAD
Dec 9, 2020P00005$0CA FLAP 03S11(1) REDS MEADOW ROAD DTFH6816D00007 6982AF18F000073 MOD P00005 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE TO 9/30/22.
Jul 21, 2020P00004$0CA FLAP 03S11(1) REDS MEADOW ROAD DTFH6816D00007 6982AF18F000073 MOD P00004 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE TO 12/31/20, AND TO CHANGE THE COR TO DUSTIN ROBBINS.
Sep 3, 2019P00003$469.5KCA FLAP 03S11(1) REDS MEADOW ROAD MODIFICATION P00003 ADDS IN 70% SURVEY ITEMS, ADDITIONAL DESIGN AT DEPO, AND OPTION PACKAGING
Apr 27, 2019P00002$59.4KCA FLAP 03S11(1) REDS MEADOW ROAD FINAL DESIGN
Aug 31, 2018P00001$628.9KCA FLAP 03S11(1) REDS MEADOW ROAD FINAL DESIGN
Apr 13, 20180$389.2KCA FLAP 03S11(1) REDS MEADOW ROAD GEOTECHNICAL INVESTIGATIONS&30% DESIGN
Apr 13, 2018P00009$0THE PURPOSE OF THIS MODIFICATION IS TO CLOSEOUT THE TASK ORDER.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.