Federal contract award

70B01C25F00000194

BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Homeland Security
OfficeADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION
NAICS236220 — Commercial and Institutional Building Construction
PSCY1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Parent award / vehicle70B01C23D00000011
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$193.7M
Current contract value$193.7M
Potential contract value / ceiling$193.7M
Start dateMar 14, 2025
Current end dateNov 28, 2028
Potential end dateNov 28, 2028
Latest award activityMay 26, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 26, 2026P00008$15.1MADDED CONSTRUCTION WORK
Mar 31, 2026P00007$9.5MADD TIERED PRICING
Feb 26, 2026P00006$0ADMINISTRATIVE MOD
Sep 18, 2025P00005$908.0KADD THE INSTALLATION OF A 36 INCH REINFORCED CONCRETE DRAINAGE PIPE AT THE EASTERN PORTION OF THE RGV 2 SEGMENT B-PROGRESSO PORT OF ENTRY.
Sep 2, 2025P00004$19.6MEXERCISE OPTIONAL LINE ITEMS ADDING 1.4 MILES OF VERTICAL BORDER BARRIER IN THE RIO GRANDE VALLEY, TX.
Jul 3, 2025P00003$53.6MDESIGN AND CONSTRUCTION OF NEW BARRIER WITHIN IN THE RIO GRANDE VALLEY, TX. THIS MOD EXERCISE OPTIONAL LINE ITEMS FOR DRAINAGE AND EROSION (COMPETED AT TIME OF AWARD).
May 13, 2025P00002$1.6MGRANITE RIO GRANDE VALLEY 2, 4, AND 10 BARRIER GAPS DESIGN BUILD CONSTRUCTION PROJECT MOD EXERCISING OPTIONAL LINE ITEMS 1007 THRU 1009 AND 1067 THROUGH 1069 ON THE PRICING SCHEDULE
Apr 30, 2025P00001$23.1MEXERCISES OPTIONAL LINE-ITEMS AWARDING THE DESIGN & CONSTRUCTION OF RIO GRANDE VALLEY-2 SEGMENT C-1 FOR NEW VERTICAL BARRIER, GAPS AND DRAINAGE AND EROSION CONTROL.
Mar 14, 20250$70.3MBORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION

Estimated positioning window

Nov 28, 2027 – May 28, 2028

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2028-11-28 (765 days from calculation)
+15 points
59 historical awards in this buyer and category group
+15 points
9 recorded award transactions
+10 points
Latest award action: 2026-05-26
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.