Federal contract award

70B03C24F00001030

BORDER INFRASTRUCTURE CONSTRUCTION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Homeland Security
OfficeADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION
NAICS236220 — Commercial and Institutional Building Construction
PSCY1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Parent award / vehicle70B01C23D00000012
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$125.2M
Current contract value$125.2M
Potential contract value / ceiling$125.2M
Start dateSep 30, 2024
Current end dateSep 30, 2027
Potential end dateSep 30, 2027
Latest award activityJul 14, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 11 of 11 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 14, 2026P00010$20.8MADDED CONSTRUCTION REQUIREMENTS
May 1, 2026P00009$542.5KADD WORK REQUIREMENTS, WITH NO ADDITIONAL TIME
Mar 12, 2026P00008$8.4MEXCAVATION OF ROCK, BLASTING, REMOVAL OF BARRIERS.
Jan 17, 2026P00007$-66.2KDESCOPE FENCING REQUIREMENTS
Sep 30, 2025P00006$1.3MADD: DESIGN AND CONSTRUCT DOUBLE SWING GATE.
Sep 1, 2025P00005$247.7KADD: DESIGN AND CONSTRUCT A DOUBLE SWING GATE (MONUMENT GATE) AT THE SECONDARY CATTLE GATE LOCATION. THE SECONDARY CATTLE GATE WILL BE OPERATED MANUALLY.
Jun 4, 2025P00004$146.0KADD A PLAT OF THE SANTA TERESA STATION (STN) SEGMENT NO. 1 PROJECT AREA AND DESIGN AND CONSTRUCT AN AUTOMATED BOLLARD VEHICLE SWING GATE AT THE ANTELOPE WELLS POINT OF ENTRY (POE) INSTEAD OF A SLIDING GATE
Apr 7, 2025P00003$176.8KADD .18 MILES OF VERTICAL BARRIER DESIGN/CONSTRUCTION BETWEEN THE WESTERN END OF THE PROJECT (31.783743, -108.159131) AND THE EASTERN END OF THE PROJECT (31.783712,-108.155799 ) OF THE DNM PROJECT.
Mar 14, 2025P00002$7.1MEXERCISE OPTIONAL CONSTRUCTION CLINS
Feb 19, 2025P00001$0MOVE INSTALL LOCATION
Sep 28, 20240$86.5MBORDER INFRASTRUCTURE CONSTRUCTION

Estimated positioning window

Oct 25, 2026 – Mar 30, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2027-09-30 (340 days from calculation)
+35 points
59 historical awards in this buyer and category group
+15 points
11 recorded award transactions
+10 points
Latest award action: 2026-07-14
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.