Federal contract award
70B03C24F00001030
BORDER INFRASTRUCTURE CONSTRUCTION
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Homeland Security |
| Office | ADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES |
| Parent award / vehicle | 70B01C23D00000012 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $125.2M |
| Current contract value | $125.2M |
| Potential contract value / ceiling | $125.2M |
| Start date | Sep 30, 2024 |
| Current end date | Sep 30, 2027 |
| Potential end date | Sep 30, 2027 |
| Latest award activity | Jul 14, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 11 of 11 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 14, 2026 | P00010 | $20.8M | ADDED CONSTRUCTION REQUIREMENTS |
| May 1, 2026 | P00009 | $542.5K | ADD WORK REQUIREMENTS, WITH NO ADDITIONAL TIME |
| Mar 12, 2026 | P00008 | $8.4M | EXCAVATION OF ROCK, BLASTING, REMOVAL OF BARRIERS. |
| Jan 17, 2026 | P00007 | $-66.2K | DESCOPE FENCING REQUIREMENTS |
| Sep 30, 2025 | P00006 | $1.3M | ADD: DESIGN AND CONSTRUCT DOUBLE SWING GATE. |
| Sep 1, 2025 | P00005 | $247.7K | ADD: DESIGN AND CONSTRUCT A DOUBLE SWING GATE (MONUMENT GATE) AT THE SECONDARY CATTLE GATE LOCATION. THE SECONDARY CATTLE GATE WILL BE OPERATED MANUALLY. |
| Jun 4, 2025 | P00004 | $146.0K | ADD A PLAT OF THE SANTA TERESA STATION (STN) SEGMENT NO. 1 PROJECT AREA AND DESIGN AND CONSTRUCT AN AUTOMATED BOLLARD VEHICLE SWING GATE AT THE ANTELOPE WELLS POINT OF ENTRY (POE) INSTEAD OF A SLIDING GATE |
| Apr 7, 2025 | P00003 | $176.8K | ADD .18 MILES OF VERTICAL BARRIER DESIGN/CONSTRUCTION BETWEEN THE WESTERN END OF THE PROJECT (31.783743, -108.159131) AND THE EASTERN END OF THE PROJECT (31.783712,-108.155799 ) OF THE DNM PROJECT. |
| Mar 14, 2025 | P00002 | $7.1M | EXERCISE OPTIONAL CONSTRUCTION CLINS |
| Feb 19, 2025 | P00001 | $0 | MOVE INSTALL LOCATION |
| Sep 28, 2024 | 0 | $86.5M | BORDER INFRASTRUCTURE CONSTRUCTION |
Estimated positioning window
Oct 25, 2026 – Mar 30, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2027-09-30 (340 days from calculation)
- +35 points
- 59 historical awards in this buyer and category group
- +15 points
- 11 recorded award transactions
- +10 points
- Latest award action: 2026-07-14
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.