Federal contract award

70Z04722F43000002

REBUILD BASE DETACHMENT AND AIR STATION BORINQUEN, AGUADILLA, PUERTO RICO

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Homeland Security
OfficeFDCC(00047)
NAICS236220 — Commercial and Institutional Building Construction
PSCY1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Parent award / vehicle70Z04718DCADNOV00
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$83.8M
Current contract value$83.8M
Potential contract value / ceiling$83.8M
Start dateJan 12, 2022
Current end dateJun 25, 2027
Potential end dateJun 25, 2027
Latest award activityJul 30, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 31 of 31 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 9, 2026P00025$200.8KTHIS MODIFICATION IS ISSUED TO INCORPORATE CMR 021 CONSTRUCT ADA-COMPLIANT CURB RAMPS.
Jul 30, 2026P00024$0THIS MODIFICATION IS ISSUED TO CORRECT SERVICE END DATES FOR CLINS 2, 4, 6, 8, 10, 12, 14, 15, AND 16, AND DUE DATES FOR CLINS 19, 25,26,27 AND 30.
Jul 28, 2026P00023$51.8KTHIS MODIFICATION IS ISSUED TO INCORPORATE CMR 019 CGX WALL AND GATE CONSTRUCTION.
May 20, 2026P00022$5.6MTHIS MODIFICATION IS ISSUED TO INCORPORATE CMR 015 CONSTRUCTION OF ELECTRICAL POINT OF CONNECTION.
Apr 23, 2026P00021$19.6KTHIS MODIFICATION IS ISSUED TO INCORPORATE CMR 020 CONSTRUCT SIDEWALK ON NE AND WING RD.
Mar 24, 2026P00020$0THIS MODIFICATION IS ISSUED TO UPDATE THE SERVICE DATES OF CLINS 2, 4, 6, 8, 10, 12, 14, 15, 16, AND 17, TO 11 JUN 2026.
Mar 3, 2026P00019$16.5KTHIS MODIFICATION IS ISSUED TO INCORPORATE REA 002 - ADDITIONAL DUSK MITIGATION.
Feb 13, 2026P00018$0THIS MODIFICATION IS ISSUED TO INCORPORATE CMR 018: DESCOPE: DEMOLITION OF EXISTING WATER DISTRIBUTION SYSTEM.
Jan 14, 2026P00017$252.6KTHIS MODIFICATION IS ISSUED TO INCORPORATE CMR 014: POTABLE WATER SYSTEM ISOLATION VALVE INSTALL.
Nov 5, 2025P00016$1.9MTHIS MODIFICATION IS ISSUED TO INCORPORATE CMR 005: CONSTRUCTION OF LUMA ELECTRICAL POINT OF CONNECTION.
Sep 26, 2025P00015$0THIS MODIFICATION IS ISSUED TO INCORPORATE CMR 017: NO COST MODIFICATIONS: AIRSTA, CGX AND HOUSING.
Sep 15, 2025P00014$90.0KTHIS MODIFICATION IS ISSUED TO INCORPORATE CMR 016: NTP PRELIMINARY DESIGN OF CMR005
Apr 22, 2025P00013$76.2KTHIS MODIFICATION IS ISSUED TO INCORPORATE CMR 013: DIFFERING SITE CONDITIONS UNFORESEEN UTILITIES
Feb 4, 2025P00012$5.5MTHIS MODIFICATION IS ISSUED TO INCORPORATE THE REMAINING FUNDING FOR CMR 007: INCREASE ROCK EXCAVATION ALLOWANCE
Dec 17, 2024A00005$0THIS MODIFICATION IS ISSUED TO CORRECT DELIVERY DATES TO FEBRUARY 10, 2026, ON SEVERAL LINE ITEMS IN ACCORDANCE WITH P00011.
Sep 30, 2024P00011$891.0KTHIS MODIFICATION IS ISSUED TO INCORPORATE CMR 007.
Sep 26, 2024P00010$-328.0KTHIS MODIFICATION IS ISSUED TO INCORPORATE CMR 012.
Aug 15, 2024A00004$0THIS MODIFICATION IS ISSUED TO INCORPORATE CMR 004 AND CMR 010.
Apr 18, 2024P00009$484.3KTHIS MODIFICATION IS ISSUED TO INCORPORATE CMR 004 AND CMR 010.
Mar 19, 2024P00008$-158.9KTHIS MODIFICATION IS ISSUED TO INCORPORATE CMR 008, CMR 009, AND CMR 011.
Feb 20, 2024P00007$2.5MTHIS MODIFICATION IS ISSUED AS MUTUALLY AGREED UPON SETTLEMENT FOR COMPENSATION BETWEEN THE GOVERNMENT AND THE CONTRACTOR WITH THEIR SUBMISSION OF THE REA 001.
Nov 6, 2023P00006$0P00006 MOD IS ISSUED TO PROCEED WITH CONSTRUCTION OF THE WATER TREATMENT BUILDING AND STORAGE TANKS USING THE PREVIOUSLY APPROVED DESIGN.
Sep 27, 2023P00005$70.4KP00005 MOD FOR RE-DESIGN OF WATER TREATMENT FACILITIES
Aug 31, 2023P00004$174.5KP00003 MOD FOR UDP
Apr 20, 2023P00003$23.2KP00003 MOD FOR UDP
Feb 14, 2023A00003$0ADMINISTRATIVE MOD TO CHANGE THE COR
Sep 30, 2022P00002$0REBUILD BASE DETACHMENT & AIR STATION BORINQUEN, AGUADILLA, PUERTO RICO, PHASE 1 UTILITIES - DEVIATIONS 5 & 8
Jun 2, 2022A00002$0REBUILD BASE DETACHMENT & AIR STATION BORINQUEN, AGUADILLA, PUERTO RICO, PHASE 1 UTILITIES - DEVIATIONS 1, 3 & 4
Apr 19, 2022P00001$0REBUILD BASE DETACHMENT & AIR STATION BORINQUEN, AGUADILLA, PUERTO RICO, PHASE 1 UTILITIES - DEVIATIONS 1, 3 & 4
Feb 17, 2022A00001$0REBUILD BASE DETACHMENT & AIR STATION BORINQUEN, AGUADILLA, PUERTO RICO, PHASE 1 UTILITIES
Jan 12, 20220$66.5MREBUILD BASE DETACHMENT AND AIR STATION BORINQUEN, AGUADILLA, PUERTO RICO

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
85/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 85/100. Available recorded signals: 80 points.

Contract end 2027-06-25 (243 days from calculation)
+35 points
60 historical awards in this buyer and category group
+15 points
31 recorded award transactions
+10 points
Latest award action: 2026-07-30
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
LaSean M. GrayContactlasean.gray@uscg.mil
7578523408
SourceOct 14, 2021
Pamela J. ArgilanContactPamela.J.Argilan@uscg.mil
7578523449
SourceOct 14, 2021
LaSean M. GrayContactlasean.gray@uscg.mil
7578523408
SourceOct 13, 2021
Pamela J. ArgilanContactPamela.J.Argilan@uscg.mil
7578523449
SourceOct 13, 2021
LaSean M. GrayContactlasean.gray@uscg.mil
7578523408
SourceOct 8, 2021
Pamela J. ArgilanContactPamela.J.Argilan@uscg.mil
7578523449
SourceOct 8, 2021
LaSean M. GrayContactlasean.gray@uscg.mil
7578523408
SourceOct 5, 2021
Pamela J. ArgilanContactPamela.J.Argilan@uscg.mil
7578523449
SourceOct 5, 2021
LaSean M. GrayContactlasean.gray@uscg.mil
7578523408
SourceSep 29, 2021
Pamela J. ArgilanContactPamela.J.Argilan@uscg.mil
7578523449
SourceSep 29, 2021
LaSean M. GrayContactlasean.gray@uscg.mil
7578523408
SourceSep 24, 2021
Pamela J. ArgilanContactPamela.J.Argilan@uscg.mil
7578523449
SourceSep 24, 2021
LaSean M. GrayContactlasean.gray@uscg.mil
7578523408
SourceSep 17, 2021
Pamela J. ArgilanContactPamela.J.Argilan@uscg.mil
7578523449
SourceSep 17, 2021
LaSean M. GrayContactlasean.gray@uscg.mil
7578523408
SourceSep 2, 2021
Pamela J. ArgilanContactPamela.J.Argilan@uscg.mil
7578523449
SourceSep 2, 2021
LaSean M. GrayContactlasean.gray@uscg.mil
7578523408
SourceAug 17, 2021
Pamela J. ArgilanContactPamela.J.Argilan@uscg.mil
7578523449
SourceAug 17, 2021
LaSean M. GrayContactlasean.gray@uscg.mil
7578523408
SourceAug 11, 2021
Pamela J. ArgilanContactPamela.J.Argilan@uscg.mil
7578523449
SourceAug 11, 2021
LaSean M. GrayContactlasean.gray@uscg.mil
7578523408
SourceAug 11, 2021
Pamela J. ArgilanContactPamela.J.Argilan@uscg.mil
7578523449
SourceAug 11, 2021
LaSean M. GrayContactlasean.gray@uscg.mil
7578523408
SourceAug 11, 2021
Pamela J. ArgilanContactPamela.J.Argilan@uscg.mil
7578523449
SourceAug 11, 2021
LaSean M. GrayContactlasean.gray@uscg.mil
7578523408
SourceAug 2, 2021
Pamela J. ArgilanContactPamela.J.Argilan@uscg.mil
7578523449
SourceAug 2, 2021

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.