Federal contract award
70Z04722F43000017
DESIGN/BUILD HURRICANE REBUILD TASK ORDER FOR SAN JUAN PHASE II EAST BASE BID AND OPTION 5: SE X WATERFRONT BOAT RAMP
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Homeland Security |
| Office | FDCC(00047) |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS |
| Parent award / vehicle | 70Z04718DTUTPER00 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $117.0M |
| Current contract value | $117.0M |
| Potential contract value / ceiling | $117.0M |
| Start date | Sep 13, 2022 |
| Current end date | Dec 30, 2027 |
| Potential end date | Dec 30, 2027 |
| Latest award activity | Mar 24, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 21 of 21 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Mar 24, 2026 | P00020 | $217.4K | MODIFICATION IS ISSUED TO ADD LINE ITEM FOR REA 002 WAGE INCREASES EO 14026 FOR 2024.. |
| Nov 5, 2025 | P00019 | $480.4K | MODIFICATION IS ISSUED TO ADD LINE ITEM FOR CMR 011 PERFORMANCE OF WORK. |
| Oct 30, 2025 | P00018 | $0 | NO-COST MODIFICATION TO CORRECT MISSING UOM INTERFACE ERROR. |
| Oct 27, 2025 | A00001 | $0 | ADMIN MOD A00001 TO CORRECT MISSING UOM INTERFACE ERROR. |
| Aug 27, 2025 | P00017 | $39.7K | MODIFICATION P00017: WORK PLAN FOR MANAGEMENT OF CONTAMINATED SOIL AS PER CMR 010 SCOPE OF WORK. |
| Jun 16, 2025 | P00016 | $-129.0K | MODIFICATION P00016: DESCOPE AS PER CMR 009. |
| Dec 6, 2024 | P00015 | $71.6K | MODIFICATION P00015: ADD LINE ITEM IN ACCORDANCE WITH CMR 008, EXPLORATORY GEOLOGICAL BORINGS, REPORTS AND FINDINGS. |
| Sep 17, 2024 | P00014 | $0 | MODIFICATION P00014: CHANGE COR FROM LT AGANON TO LCDR FITZPATRICK. |
| Aug 6, 2024 | P00013 | $0 | MODIFICATION P00013: BILATERAL NO-COST AND NO-TIME IMPACT MODIFICATION IN ACCORDANCE WITH CMR #007 AND PROPOSAL DATED JUNE 25, 2024. |
| Jun 21, 2024 | P00012 | $39.5K | MODIFICATION P00012: BILATERAL MODIFICATION IN ACCORDANCE WITH REA #001 AND EXECUTIVE ORDER 14026. |
| Apr 16, 2024 | P00011 | $654.6K | MODIFICATION P00011: BILATERAL MODIFICATION TO INCORPORATE CMR 005 IMPLEMENT A DATA RECOVERY PLAN AND ALLOWANCE FOR STOP WORK AND LOST PRODUCTION. |
| Apr 5, 2024 | P00010 | $0 | MODIFICATION P00010: BILATERAL MODIFICATION TO INCORPORATE DEVIATION REQUEST #005, "DUCT BANK STEEL REINFORCEMENT & MANHOLE-6". NO COST AND NOT TIME IMPACT. |
| Mar 22, 2024 | P00009 | $0 | MODIFICATION P00009: BILATERAL MODIFICATION TO INCORPORATE DEVIATION REQUEST #004, ELECTRICAL UNDERGROUND PULL BOX COVERS. NO COST AND NOT TIME IMPACT. |
| Feb 1, 2024 | P00008 | $663.5K | MODIFICATION P00008: BILATERAL MODIFICATION TO DESIGN AND INSTALL A 6000 GALLON OILY WATER STORAGE TANK AND CONTAINMENT IN ACCORDANCE WITH CMR 002. |
| Jan 10, 2024 | P00007 | $-161.1K | MODIFICATION P00007: BILATERAL MODIFICATION FOR DESCOPE DESIGN & CONSTRUCTION OF SECOND POTABLE WATER TANK FOUNDATION AND EQUIPMENT. |
| Sep 18, 2023 | P00006 | $0 | MODIFICATION P00006: BILATERAL MODIFICATION FOR DEVIATION REQUEST #002: ADDRESS CURRENT DESIGN OF ELECTRICAL VERTICAL TURBINE FIRE PUMP AND ITS LOCATION. |
| Aug 21, 2023 | P00005 | $134.4K | MODIFICATION P00005: BILATERAL MODIFICATION TO INCREASE LEAD-BASED PAINT ABATEMENT IN ACCORDANCE WITH CMR 003 |
| Aug 7, 2023 | P00004 | $0 | MODIFICATION P00004: BILATERAL MODIFICATION TO INCORPORATE EXECUTIVE ORDER 14026 WAGES. PHASE II |
| Jul 18, 2023 | P00003 | $15.1K | MODIFICATION CMR 004 DEVELOP A DATA RECOVERY PLAN PHASE II |
| Sep 27, 2022 | P00001 | $0 | MODIFICATION TO CHANGE THE GENERAL DECISION NUMBER AND THE DELIVERY DATE. |
| Sep 12, 2022 | 0 | $115.0M | DESIGN/BUILD HURRICANE REBUILD TASK ORDER FOR SAN JUAN PHASE II EAST BASE BID AND OPTION 5: SE X WATERFRONT BOAT RAMP |
Estimated positioning window
Dec 30, 2026 – Jun 30, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2027-12-30 (431 days from calculation)
- +25 points
- 60 historical awards in this buyer and category group
- +15 points
- 21 recorded award transactions
- +10 points
- Latest award action: 2026-03-24
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.