Federal contract award

70Z08023CMECP0026

WMEC 270 ANCHOR WINDLASS REPLACE FY23

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Homeland Security
OfficeSFLC PROCUREMENT BRANCH 1(00080)
NAICS333923 — Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
PSCJ998 — Non-nuclear Ship Repair (East) Ship repair (including overhauls and conversions) performed on non-nuclear propelled and nonpropelled ships east of the 108th meridian
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$6.1M
Current contract value$6.1M
Potential contract value / ceiling$14.4M
Start dateSep 19, 2023
Current end dateSep 18, 2028
Potential end dateSep 18, 2028
Latest award activityJul 22, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 22, 2026P00009$1.4MMODIFICATION TO EXERCISE THE FOLLOWING OPTIONS: O-001 - ANCHOR WINDLASS(S): 3 TOTAL SHIP SETS O-002 - MATERIAL (ON BOARD REPAIR PARTS OBRP): 3 KITS OPTION CLIN 0008: 3 SETS OF OPERATING INSTRUCTION PLACARDS AND 3 SETS OF LUBRICATION CHARTS/DIAGRAMS
May 18, 2026P00008$40.2KTHE PURPOSE OF THIS MODIFICATION IS FOR AN EQUITABLE ADJUSTMENT TO THE CONTRACT BASED ON TARIFFS IMPOSED ON SPECIFIC IMPORTED ITEMS NECESSARY FOR CONTRACT PERFORMANCE.
Feb 24, 2026P00007$894.3KMODIFICATION TO EXERCISE THE FOLLOWING OPTIONS: O-001 - ANCHOR WINDLASS(S): 2 "B" CLASS SHIP SETS CLIN 0013 (BASED ON THE SCHEDULE STRUCTURE): 2 SETS OF OPERATING INSTRUCTION PLACARDS AND 2 SETS OF LUBRICATION CHARTS/DIAGRAMS
Feb 9, 2026P00006$11.2KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGE REQUEST: CR-001: CHANGE CAPSTAN BARREL LIDS FROM STEEL TO ALUMINUM
Sep 24, 2025P00005$2.3MEXERCISE THE FOLLOWING OPTIONS: O-001-ANCHOR WINDLASS(S):(5 SHIP SETS) O-002-MATERIAL (ON BOARD REPAIR PARTS OBRP):(5 KITS) CLIN 0008 (BASED ON THE SCHEDULE STRUCTURE):(5 SETS OF OPERATING INSTRUCTION PLACARDS & 5 SETS OF LUBRICATION CHARTS/DIAGRAMS)
Sep 8, 2025P00004$5.2KA. MODIFICATION TO INCORPORATE CLIN 0007 (BASED ON THE SCHEDULE STRUCTURE) FOR FABRICATING 4 SETS OF OPERATING INSTRUCTION PLACARDS AND 4 SETS OF LUBRICATION CHARTS/DIAGRAMS. B. CREATE A NEW OPTION CLIN FOR ADDITIONAL PLACARDS AND CHARTS/DIAGRAMS.
May 15, 2025P00003$37.5KWMEC 270 ANCHOR WINDLASS REPLACE FY23 A. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CLIN 0006 (BASED ON THE SCHEDULE STRUCTURE) FOR THREE (3) SETS OF ANCHOR WINDLASS STORAGE/SHIPPING STANDS.
Sep 26, 2024P00002$444.0KWMEC 270 ANCHOR WINDLASS REPLACE FY23 POP: 19 SEPTEMBER 2023 - 18 SEPTEMBER 2028
May 20, 2024P00001$444.0KWMEC 270 ANCHOR WINDLASS REPLACE FY23 POP: 19 SEPTEMBER 2023 - 18 SEPTEMBER 2024
Sep 19, 20230$598.0KWMEC 270 ANCHOR WINDLASS REPLACE FY23

Estimated positioning window

Sep 18, 2027 – Mar 18, 2028

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2028-09-18 (694 days from calculation)
+25 points
1 historical awards in this buyer and category group
+0 points
10 recorded award transactions
+10 points
Latest award action: 2026-07-22
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.