Federal contract award
70Z0G124FSLIS0002
ARCHITECTURAL/ENGINEERING (A/E) DESIGN SERVICES FOR MAJOR M&R MULTI MISSION BUILDING (MMB) USCG STATION EATONS NECK, NORTHPORT, NY 11768 (SUFFOLK COUNTY), A/E PSN 21537131.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Homeland Security |
| Office | CEU PROVIDENCE(000G1) |
| NAICS | 541330 — Engineering Services |
| PSC | C219 — Other Architect and Engineering Services |
| Parent award / vehicle | 70Z0G123DABCD0001 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $592.9K |
| Current contract value | $592.9K |
| Potential contract value / ceiling | $592.9K |
| Start date | Apr 12, 2024 |
| Current end date | Aug 4, 2027 |
| Potential end date | Aug 4, 2027 |
| Latest award activity | May 11, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 11, 2026 | P00006 | $144.2K | THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO CORRECT THE LINE OF ACCOUNTING FOR CONSTRUCTION PHASE SERVICES BY PROVIDING THE CORRECT LINE OF ACCOUNTING UNDER CLIN 0004. THIS REPLACES CLIN 0002 FOR CONSTRUCTION PHASE SERVICES. |
| Apr 29, 2026 | P00004 | $144.2K | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE THE OPTION FOR CONSTRUCTION PHASE SERVICES UNDER CLIN 0002. THE CONTRACT COMPLETION DATE IS EXTENDED TO 04 AUGUST 2027. |
| Apr 29, 2026 | P00005 | $-144.2K | THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO CORRECT THE LINE OF ACCOUNTING FOR CONSTRUCTION PHASE SERVICES UNDER CLIN 0002. THIS MOD REMOVES THE ORIGINAL LINE OF ACCOUNTING. A SUBSEQUENT MOD WILL ADD THE NEW LINE OF ACCOUNTING. |
| Jun 23, 2025 | P00003 | $0 | PURPOSE OF MOD IS TO EXTEND CONTRACT COMPLETION DATE TO 9/26/2025 AT NO COST TO EITHER PARTY FOR ADDITIONAL TIME FOR USCG TO PERFORM REVIEW OF 100% DESIGN SUBMISSION AND INCLUDE TIME FOR CONTRACTOR TO REVIEW AND RESPOND TO ANY BID RFIS. |
| Apr 11, 2025 | P00002 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE CONTRACT COMPLETION DATE (CCD) TO 05 JUNE 2025 AT NO COST TO EITHER PARTY TO ADDRESS THE INTERRUPTION IN DESIGN PROGRESS FOR THE HVAC OPTIONS. |
| Jan 13, 2025 | P00001 | $76.4K | PURPOSE OF THIS MOD IS TO ADDRESS UNFORESEEN SITE CONDITIONS. CONTRACTOR SHALL PERFORM ADDED WORK IAW ATTACHMENT NO. 1 - SOW FOR MOD P00001. ALSO, REPLACEMENT OF EXTERIOR WINDOWS IS REMOVED FROM BASE SOW. CCD IS EXTENDED TO 03/28/2025. |
| Apr 12, 2024 | 0 | $372.3K | ARCHITECTURAL/ENGINEERING (A/E) DESIGN SERVICES FOR MAJOR M&R MULTI MISSION BUILDING (MMB) USCG STATION EATONS NECK, NORTHPORT, NY 11768 (SUFFOLK COUNTY), A/E PSN 21537131. |
Estimated positioning window
Oct 25, 2026 – Feb 4, 2027
85/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 85/100. Available recorded signals: 80 points.
- Contract end 2027-08-04 (283 days from calculation)
- +35 points
- 38 historical awards in this buyer and category group
- +15 points
- 7 recorded award transactions
- +10 points
- Latest award action: 2026-05-11
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.