Federal contract award

75H70124C00030

RENOVATION AND EXPANSION OF THE MESCALERO INDIAN HOSPITAL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Health and Human Services
OfficeDIV OF ENGINEERING SVCS - SEATTLE
NAICS236220 — Commercial and Institutional Building Construction
PSCZ1DA — MAINTENANCE OF HOSPITALS AND INFIRMARIES
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$16.7M
Current contract value$16.7M
Potential contract value / ceiling$16.7M
Start dateSep 6, 2024
Current end dateNov 5, 2026
Potential end dateNov 5, 2026
Latest award activityJul 21, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 21, 2026P00007$396.7KP00007: (+EO14938) + SCOPE CHANGES (01 JUN 2026) (ASI#10 & 13; RFI #61, 77 & 81)
Jul 21, 2026P00008$173.2KP00008: SCOPE CHANGES TO ADDRESS DESIGN ERRORS AND OMISSIONS (DATED OCT 2025) (ASI#7)
Jun 3, 2026P00006$399.8KREPLACEMENT OF ELECTRICAL SERVICE AND REROUTE OF FIBER OPTIC LINE
Jan 29, 2026P00005$195.2KADDITIONAL COST TO EXPEDITE THE STRUCTURAL STEEL PACKAGE
Dec 19, 2025P00004$139.8KADDITIONAL COST TO EXPEDITE THE STRUCTURAL STEEL PACKAGE
Sep 15, 2025P00003$91.1KRENOVATION AND EXPANSION OF THE MESCALERO INDIAN HOSPITAL. THIS MODIFICATION IS TO ADDRESS CIVIL AND STRUCTURAL ERRORS AND OMISSIONS IN THE DESIGN OF THE STRUCTURAL FOUNDATION AND CIVIL SITE WORK.
Aug 13, 2025P00002$1.4MRENOVATION AND EXPANSION OF THE MESCALERO INDIAN HOSPITAL. THIS MODIFICATION IS TO ADDRESS CIVIL AND STRUCTURAL ERRORS AND OMISSIONS IN THE DESIGN OF THE STRUCTURAL FOUNDATION AND CIVIL SITE WORK.
Jul 11, 2025P00001$50.7KRENOVATION AND EXPANSION OF THE MESCALERO INDIAN HOSPITAL. THIS MODIFICATION IS TO REMOVE THE UNDERGROUND STORAGE TANK, TEST THE SOILS AND REMOVE ALL CONTAMINATED SOIL AND BACKFILL
Sep 6, 20240$13.9MRENOVATION AND EXPANSION OF THE MESCALERO INDIAN HOSPITAL

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2026-11-05 (11 days from calculation)
+35 points
4 historical awards in this buyer and category group
+15 points
9 recorded award transactions
+10 points
Latest award action: 2026-07-21
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.