Federal contract award

75H70323P00060

THIS REPLACES 75H70323P00058 FROM THE RFP GIVEN TO THE CONTRACTOR 18AUG23. THIS IS THE AWARDED FAR FFP 75H70323P00060 FOR DESIGN SERVICES FOR THE MAIN AND CANYON WATER STORAGE REPAIRS IIPAY NATION OF SANTA YSABEL. THE ATTACHMENT A CONTAINS THE SOW, C

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Health and Human Services
OfficeCALIFORNIA INDIAN HEALTH SERVICE
NAICS541330 — Engineering Services
PSCC1NE — ARCHITECT AND ENGINEERING- CONSTRUCTION: WATER SUPPLY FACILITIES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$315.4K
Current contract value$315.4K
Potential contract value / ceiling$315.4K
Start dateSep 7, 2023
Current end dateAug 27, 2026
Potential end dateAug 27, 2026
Latest award activityAug 27, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 27, 2026P00008$-21DE-OBLIGATE UNUSED FUNDS IN LINE ITEM 3
Jul 9, 2025P00007$0P00006 EXTENDS THE POP TO 08/09/2025 DUE TO UNFORESEEN DELAY WITH TRIBAL DIRECTION. POP MODIFICATION EXTENDS TO SERVICES IN LIAPY NATION. CONTRACTOR IS NEARING COMPLETION OF THE FINAL DELIVERABLE BUT REQUIRES ADDITIONAL TIME TO ENSURE ALL WORK IS COM
Mar 28, 2025P00006$0P00006 EXTENDS THE POP TO 06/29/2025 DUE TO UNFORESEEN DELAY WITH TRIBAL DIRECTION. POP MODIFICATION EXTEND TO BOTH AE SERVICES IN LIAPY NATION AND AE SERVICES IN MANZANITA. THIS IS A NO COST MODIFICATION. ALL OTHER TERMS AND CONDITIONS REMAIN UN
Oct 18, 2024P00005$0P00005 EXTENDS THE PERIOD OF PERFORMANCE TO 03/31/2025 DUE TO UNFORESEEN GOVERNMENT DELAY IN COMPLETING NEPA. POP MODIFICATION EXTEND TO BOTH AE SERVICES IN LIAPY NATION AND AE SERVICES IN MANZANITA. THIS IS A NO COST MODIFICATION. ALL OTHER TERMS AN
Jun 17, 2024P00004$70.2KP00004 INCORPORATE CHANGES IN ATTACHMENT A FROM THE ORIGINAL AWARD FOR THE NEW AMOUNT OF MODIFICATION, ALL SPEC/DESIGN ARE IN ORIGINAL AWARD DOCUMENTS; ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Apr 9, 2024P00003$20.1KP00003 INCORPORATE CHANGES IN ATTACHMENT A FROM THE ORIGINAL AWARD FOR THE NEW AMOUNT OF MODIFICATION, NO CHANGES IN THE POP, ALL SPEC/DESIGN ARE IN ORIGINAL AWARD DOCUMENTS; THE COR WAS CHANGED FROM JONATHAN RASH TO LUKE SCHULTE; ALL OTHER TERMS AND
Mar 8, 2024P00002$0P00002 EXTENDS THE POP UNTIL 30SEP24, NO COST EXTENSION DUE TO ADD'L ITEMS REQUIRED; ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. SEE EMAIL IN FILE FOR EXPLANATIONS OF REQUEST AND APPROVALS.
Feb 15, 2024P00001$81.8KP00001 INCREASES THE AMOUNT OF FUNDS TO CONTRACT 75H70323P00060 BY $81,778.40 FOR ADDITIONAL WORK. WORK INCLUDES THEE FLOOD ELEVATION STUDY AT MANZANITA. SEE ATTACHED PROPOSAL FOR DETAILS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Sep 8, 20230$143.4KTHIS REPLACES 75H70323P00058 FROM THE RFP GIVEN TO THE CONTRACTOR 18AUG23. THIS IS THE AWARDED FAR FFP 75H70323P00060 FOR DESIGN SERVICES FOR THE MAIN AND CANYON WATER STORAGE REPAIRS IIPAY NATION OF SANTA YSABEL. THE ATTACHMENT A CONTAINS THE SOW, C