Federal contract award
75H70323P00060
THIS REPLACES 75H70323P00058 FROM THE RFP GIVEN TO THE CONTRACTOR 18AUG23. THIS IS THE AWARDED FAR FFP 75H70323P00060 FOR DESIGN SERVICES FOR THE MAIN AND CANYON WATER STORAGE REPAIRS IIPAY NATION OF SANTA YSABEL. THE ATTACHMENT A CONTAINS THE SOW, C
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Health and Human Services |
| Office | CALIFORNIA INDIAN HEALTH SERVICE |
| NAICS | 541330 — Engineering Services |
| PSC | C1NE — ARCHITECT AND ENGINEERING- CONSTRUCTION: WATER SUPPLY FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $315.4K |
| Current contract value | $315.4K |
| Potential contract value / ceiling | $315.4K |
| Start date | Sep 7, 2023 |
| Current end date | Aug 27, 2026 |
| Potential end date | Aug 27, 2026 |
| Latest award activity | Aug 27, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 27, 2026 | P00008 | $-21 | DE-OBLIGATE UNUSED FUNDS IN LINE ITEM 3 |
| Jul 9, 2025 | P00007 | $0 | P00006 EXTENDS THE POP TO 08/09/2025 DUE TO UNFORESEEN DELAY WITH TRIBAL DIRECTION. POP MODIFICATION EXTENDS TO SERVICES IN LIAPY NATION. CONTRACTOR IS NEARING COMPLETION OF THE FINAL DELIVERABLE BUT REQUIRES ADDITIONAL TIME TO ENSURE ALL WORK IS COM |
| Mar 28, 2025 | P00006 | $0 | P00006 EXTENDS THE POP TO 06/29/2025 DUE TO UNFORESEEN DELAY WITH TRIBAL DIRECTION. POP MODIFICATION EXTEND TO BOTH AE SERVICES IN LIAPY NATION AND AE SERVICES IN MANZANITA. THIS IS A NO COST MODIFICATION. ALL OTHER TERMS AND CONDITIONS REMAIN UN |
| Oct 18, 2024 | P00005 | $0 | P00005 EXTENDS THE PERIOD OF PERFORMANCE TO 03/31/2025 DUE TO UNFORESEEN GOVERNMENT DELAY IN COMPLETING NEPA. POP MODIFICATION EXTEND TO BOTH AE SERVICES IN LIAPY NATION AND AE SERVICES IN MANZANITA. THIS IS A NO COST MODIFICATION. ALL OTHER TERMS AN |
| Jun 17, 2024 | P00004 | $70.2K | P00004 INCORPORATE CHANGES IN ATTACHMENT A FROM THE ORIGINAL AWARD FOR THE NEW AMOUNT OF MODIFICATION, ALL SPEC/DESIGN ARE IN ORIGINAL AWARD DOCUMENTS; ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. |
| Apr 9, 2024 | P00003 | $20.1K | P00003 INCORPORATE CHANGES IN ATTACHMENT A FROM THE ORIGINAL AWARD FOR THE NEW AMOUNT OF MODIFICATION, NO CHANGES IN THE POP, ALL SPEC/DESIGN ARE IN ORIGINAL AWARD DOCUMENTS; THE COR WAS CHANGED FROM JONATHAN RASH TO LUKE SCHULTE; ALL OTHER TERMS AND |
| Mar 8, 2024 | P00002 | $0 | P00002 EXTENDS THE POP UNTIL 30SEP24, NO COST EXTENSION DUE TO ADD'L ITEMS REQUIRED; ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. SEE EMAIL IN FILE FOR EXPLANATIONS OF REQUEST AND APPROVALS. |
| Feb 15, 2024 | P00001 | $81.8K | P00001 INCREASES THE AMOUNT OF FUNDS TO CONTRACT 75H70323P00060 BY $81,778.40 FOR ADDITIONAL WORK. WORK INCLUDES THEE FLOOD ELEVATION STUDY AT MANZANITA. SEE ATTACHED PROPOSAL FOR DETAILS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. |
| Sep 8, 2023 | 0 | $143.4K | THIS REPLACES 75H70323P00058 FROM THE RFP GIVEN TO THE CONTRACTOR 18AUG23. THIS IS THE AWARDED FAR FFP 75H70323P00060 FOR DESIGN SERVICES FOR THE MAIN AND CANYON WATER STORAGE REPAIRS IIPAY NATION OF SANTA YSABEL. THE ATTACHMENT A CONTAINS THE SOW, C |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.