Federal contract award

75N98026P00900

NIMH: SUPPLY: BIOLOGICAL LABORATORY SUPPLIES: N/A FOR THE REPAIR AND REPLACEMENT OF THE BATTERIES, CAPACITORS, AND FANS OF THE LABS UNIVERSAL POWER SUPPLY (UPS) POWER UNIT UTILIZED BY TWO (2) MRI SCANNERS

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Health and Human Services
OfficeNATIONAL INSTITUTES OF HEALTH OLAO
NAICS811310 — Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
PSC6640 — Laboratory Equipment and Supplies
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$36.3K
Current contract value$36.3K
Potential contract value / ceiling$36.3K
Start dateJun 29, 2026
Current end dateSep 28, 2026
Potential end dateSep 28, 2026
Latest award activityJul 6, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 6, 2026P00001$0NIMH: SUPPLY: BIOLOGICAL LABORATORY SUPPLIES: N/A FOR THE REPAIR AND REPLACEMENT OF THE BATTERIES, CAPACITORS, AND FANS OF THE LABS UNIVERSAL POWER SUPPLY (UPS) POWER UNIT UTILIZED BY TWO (2) MRI SCANNERS
Jun 30, 20260$36.3KNIMH: SUPPLY: BIOLOGICAL LABORATORY SUPPLIES: N/A FOR THE REPAIR AND REPLACEMENT OF THE BATTERIES, CAPACITORS, AND FANS OF THE LABS UNIVERSAL POWER SUPPLY (UPS) POWER UNIT UTILIZED BY TWO (2) MRI SCANNERS

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
MAY, BRITTANY NContactbrittany.may@nih.gov
+1 000 000 0000
SourceJun 5, 2026

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.