Federal contract award

75N98122F00001

GOVERNMENT ACCOUNTABLITY OFFICE (GAO) TASKS FOR THE IMPLEMENTATION AND SUPPORT TRANSITION OF THE ENTERPRISE CONTENT MANAGEMENT (ECM) PROGRAM. THE CONTRACTOR SHALL IMPLEMENT THE SPO ECM SOLUTION TO ACHIEVE THE OUTCOMES AND BENEFITS OF THE TASKS TO

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Health and Human Services
OfficeNIH NITAA DITA-DVI OF INFO TECH ACQ
NAICS541512 — Computer Systems Design Services
PSCDA01 — Support services for activities involved with application development and support to include analysis, design, development, coding, testing, and release packaging, as well as support of off-the-shelf Business Applications.
Parent award / vehicleHHSN316201200055W
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$11.7M
Current contract value$11.7M
Potential contract value / ceiling$15.7M
Start dateAug 1, 2022
Current end dateJan 31, 2027
Potential end dateJan 31, 2027
Latest award activityJul 15, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 61 of 61 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 15, 2026P00060$881.5KUPDATE CLIN 0002
Jun 22, 2026P00059$-43.8KCLIN 0015 - DESCOPE MILESTONES 8-9 AND CLIN 0002 NCE
Mar 6, 2026P00058$727.1KTHE PURPOSE OF THIS MODIFICATION IS TO ADD THE FOLLOWING CLINS: 1. SUBCLIN 0206 UNDER CLIN 0002 FOR MIGRATION OF NEW DM CONTENT. PERIOD OF PERFORMANCE IS FROM MARCH 1, 2026, TO JULY 31, 2026. 2. CLIN 0027 NEW REQUIREMENTS FOR ECM SHAREPOINT ROL
Feb 9, 2026P00057$436.2KTHE PURPOSE OF THIS MODIFICATION IS TO ADD THE FOLLOWING NEW CLINS: 1) SUBCLIN 0205 UNDER CLIN 0002 FOR MIGRATION OF NEW DM CONTENT FROM DECEMBER 1, 2025 TO FEBRUARY 28, 2026. 2) ADD CLIN 0026 NEW REQUIREMENTS FOR ECM SHAREPOINT FROM DECEMBER 1
Sep 24, 2025P00056$470.1KTHE PURPOSE OF THIS MODIFICATION IS TO: (1) EXTEND CLIN 0002 AT NO COST FROM SEPTEMBER 1, 2025, TO NOVEMBER 30, 2025, TO COMPLETE MILESTONE NO. 10. (2) ADD THE FOLLOWING NEW CLINS: 0204 MIGRATION OF NEW DM CONTENT FROM SEPTEMBER 1, 2025, TO
Aug 5, 2025P00055$10.0KTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE CLIN 0020 IN THE AMOUNT OF $10,000.00 TO COVER ANTICIPATED OTHER DIRECT COSTS (ODCS) AND EXERCISE OPTION PERIOD 3: AUGUST 1, 2025, THROUGH JULY 31, 2026.
Jul 31, 2025P00054$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO MAY 15, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0011 ENHANCED TRAINING WITHIN THE FULLY FUNDED FIRM FIXED PRICE OF $309,369.00.
Jun 17, 2025P00053$536.9KBUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO MAY 15, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0011 ENHANCED TRAINING WITHIN THE FULLY FUNDED FIRM FIXED PRICE OF $309,369.00.
Jun 11, 2025P00052$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO MAY 15, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0011 ENHANCED TRAINING WITHIN THE FULLY FUNDED FIRM FIXED PRICE OF $309,369.00.
Mar 28, 2025P00051$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO MAY 15, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0011 ENHANCED TRAINING WITHIN THE FULLY FUNDED FIRM FIXED PRICE OF $309,369.00.
Mar 26, 2025P00050$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO APRIL 30, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0012 ENHANCED RECORDS MANAGEMENT MILESTONES WITHIN THE FULLY FUNDED FIRM FIXED
Feb 25, 2025P00049$387.7KBUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO MAY 31, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0002 MIGRATION & DECOMMISSION MILESTONES WITHIN THE FULLY FUNDED FIRM FIXED
Feb 4, 2025P00048$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO MARCH 31, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0015 CROSS-FUNCTIONAL SPO IMPLEMENTATION MILESTONES WITHIN THE FULLY FUNDED FI
Feb 3, 2025P00047$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO MARCH 31, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0012 ENHANCED RECORDS MANAGEMENT MILESTONES WITHIN THE FULLY FUNDED FIRM FIXED
Jan 21, 2025P00045$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO JANUARY 31, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0011 ENHANCED TRAINING WITHIN THE FULLY FUNDED FIRM FIXED PRICE OF $309,369.
Jan 21, 2025P00046$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO JANUARY 31, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0002 MIGRATE & DECOMMISSION DM MILESTONES WITHIN THE FULLY FUNDED FIRM F
Dec 19, 2024P00043$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO JANUARY 15, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0002 MIGRATE & DECOMMISSION DM MILESTONES WITHIN THE FULLY FUNDED FIRM F
Dec 19, 2024P00044$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO JANUARY 15, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0011 ENHANCED TRAINING WITHIN THE FULLY FUNDED FIRM FIXED PRICE OF $309,369.
Oct 30, 2024P00041$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO DECEMBER 31, 2024, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0011 ENHANCED TRAINING MILESTONE 8 WITHIN THE FULLY FUNDED FIRM FIXED PRICE
Oct 30, 2024P00042$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO DECEMBER 31, 2024, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0002 MIGRATE & DECOMMISSION DM MILESTONES WITHIN THE FULLY FUNDED FIRM
Oct 29, 2024P00038$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO NOVEMBER 30, 2024, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0004 UX LAB MILESTONES WITHIN THE FULLY FUNDED FIRM FIXED PRICE OF $226,590
Oct 29, 2024P00039$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO JANUARY 31, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0012 ENHANCED RECORDS MANAGEMENT MILESTONES WITHIN THE FULLY FUNDED FIRM FIX
Oct 29, 2024P00040$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO JANUARY 31, 2025, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0015 CROSS-FUNCTIONAL SPO IMPLEMENTATION MILESTONES WITHIN THE FULLY FUNDED
Sep 24, 2024P00037$81.8KBUCHANAN & EDWARDS MODIFICATION EQUITABLE ADJUSTMENT DUE TO GOVERNMENT DELAY OF WORK CLIN 0003 MARCH 16 2023, - AUGUST 31, 2023, WITH FY23 FUNDS.
Aug 29, 2024P00036$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY AND RECEIPT OF ACCEPTANCE DATE TO OCTOBER 31, 2024, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0001 SPO IMPLEMENTATION MILESTONES WITHIN THE FULL
Aug 28, 2024P00035$0BUCHANAN & EDWARDS CLIN 0006 ECM SERVICES MOD COMPLETION DELIVERY DATE TO 9/30/2024 TO ALLOW GOVT TO REVIEW MILESTONES 5, 7, AND 8 AND TO ALLOW BE TO COMPLETE AND DELIVER. NO ADDITIONAL COSTS.
Aug 8, 2024P00034$-986.9KBUCHANAN & EDWARDS CLIN 0014 INTRANET PARTIAL T4C MILESTONES 5-12
Aug 1, 2024P00033$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO OCTOBER 31, 2024, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0002 MIGRATE & DECOMMISSION DM MILESTONES 8 AND 9 WITHIN THE FULLY FUNDE
Jul 31, 2024P00030$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFICATION TO ANTICIPATED EXERCISE DATE FOR CLIN 0008 API MANAGEMENT TO COMMENCE 12/16/2024, WITH COMPLETION AND DELIVERY BY 8/15/2025, IF EXERCISED AND FUNDED BY THE GOVERNMENT.
Jul 31, 2024P00031$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFICATION TO ANTICIPATED EXERCISE DATE FOR CLIN 0010 ENTERPRISE TAXONOMY TO COMMENCE 12/16/2024, IF EXERCISED AND FUNDED BY THE GOVERNMENT.
Jul 31, 2024P00032$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFICATION TO ANTICIPATED EXERCISE DATE FOR CLIN 0016 ENHANCED ECM REQUIREMENTS & ROADMAP TO COMMENCE 12/16/2024, IF EXERCISED AND FUNDED BY THE GOVERNMENT.
Jul 26, 2024P00029$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO OCTOBER 31, 2024, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0015 CROSS-FUNCTIONAL SPO IMPLEMENTATION MILESTONES WITHIN THE FULLY FUNDED
Jul 25, 2024P00027$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO OCTOBER 31, 2024 WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0004 UX LAB MILESTONES WITHIN THE FULLY FUNDED FIRM FIXED PRICE OF $226,590.0
Jul 25, 2024P00028$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO OCTOBER 31, 2024, WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0012 ENHANCED RECORDS MANAGEMENT MILESTONES WITHIN THE FULLY FUNDED FIRM FIX
Jun 27, 2024P00025$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO AUGUST 31, 2024 WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0006 ECM SERVICES, WITHIN THE FULLY FUNDED FIRM FIXED PRICE OF $478,231.00. NO
Jun 27, 2024P00026$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY COMPLETION/DELIVERY DATE TO AUGUST 31, 2024 WITH NO CHANGE IN ALREADY FULLY FUNDED PRICE OR SCOPE FOR CLIN 0001 SPO SOLUTION IMPLEMENTATION MILESTONE WITHIN THE FULLY FUNDED FIRM FIXED
May 30, 2024P00024$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES PROVIDE A NO CHANGE IN PRICE OR SCOPE COMPLETION/ DELIVERY DATE EXTENSION OF CLIN 0001 SPO SOLUTION IMPLEMENTATION MILESTONE 12 TO JUNE 30, 2024, WITHIN THE FULLY FUNDED FIRM FIXED PRICE OF $2
May 29, 2024P00021$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES PROVIDE A NO CHANGE IN PRICE OR SCOPE COMPLETION/DELIVERY DATE EXTENSION OF CLIN 0004 UX LABS MILESTONES TO JULY 31, 2024, WITHIN THE FULLY FUNDED FIRM FIXED PRICE OF $226,590.00. NO OTHER WOR
May 29, 2024P00022$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES PROVIDE A NO CHANGE IN PRICE OR SCOPE COMPLETION/ DELIVERY DATE EXTENSION OF CLIN 0012 ENHANCED RECORDS MANAGEMENT MILESTONES TO JULY 31, 2024, WITHIN THE FULLY FUNDED FIRM FIXED PRICE OF $391
May 29, 2024P00023$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES PROVIDE A NO CHANGE IN PRICE OR SCOPE COMPLETION/ DELIVERY DATE EXTENSION OF CLIN 0002 MIGRATE & DECOMMISSION DM MILESTONES 8 AND 9 TO JULY 31, 2024, WITHIN THE FULLY FUNDED FIRM FIXED PRI
Apr 12, 2024P00019$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES PROVIDE A NO-COST EXTENSION TO THE DELIVERY DATE OF CLIN 0006 ECM SERVICES TO JUNE 30, 2024 FROM APRIL 13, 2024 IN THE GOVERNMENT'S BEST INTEREST.
Apr 12, 2024P00020$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES PROVIDE A NO-COST EXTENSION TO THE DELIVERY DATE OF CLIN 0011 ENHANCED TRAINING OCTOBER 31, 2024 FROM APRIL 16, 2024 IN THE BEST INTERESTS OF THE GOVERNMENT.
Feb 28, 2024P00018$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES PROVIDE A CHANGE TO THE SCHEDULE OF CLIN 0008 POP TO AUGUST 1, 2024 THROUGH TO MARCH 31, 2025.
Feb 26, 2024P00017$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES PROVIDE A NO COST EXTENSION TO THE SCHEDULE OF CLIN 0011 ENHANCE TRAINING TO APRIL 16, 2024 FROM FEBRUARY 29, 2024.
Feb 14, 2024P00016$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES PROVIDE A NO COST EXTENSION TO THE SCHEDULE OF CLIN 0001 SPO SOLUTION IMPLEMENTATION AND CLIN 0002 MIGRATE AND DECOMMISSION DM TO MAY 31, 2024 FROM FEBRUARY 29, 2024.
Jan 16, 2024P00015$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES PROVIDE A NO COST EXTENSION TO THE SCHEDULE OF CLIN 0002 MIGRATE AND DECOMMISSION DM TO FEBRUARY 29, 2024.
Dec 28, 2023P00014$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES PROVIDE A NO COST EXTENSION TO THE SCHEDULE OF CLIN 0002 MIGRATE AND DECOMMISSION DM.TO JANUARY 31, 2024.
Dec 21, 2023P00013$691.9KBUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES EXERCISE AND FULLY FUND CLIN 1002 WITH DEOBLIGATED FUNDS FROM CLIN 1001.
Dec 20, 2023P00012$-691.9KBUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFY THE LINE OF ACCOUNTING ON CLIN 1001 BY DEOBLIGATING FUNDS AND REOBLIGATE ON P00013.
Dec 11, 2023P00010$691.9KBUCHANAN & EDWARDS MODIFICATION EQUITABLE ADJUSTMENT DUE TO GOVERNMENT DELAY OF WORK CLINS 0001 AND 0002 MARCH 16 2023 - AUGUST 31, 2023 WITH FY22 FUNDS.
Dec 11, 2023P00011$0BUCHANAN & EDWARDS BY MUTUAL AGREEMENT OF THE PARTIES MODIFICATION TO COMPLETION/DELIVERY DATE FOR CLIN 0008 API MANAGEMENT TO COMMENCE 3/1/2024 WITH 8 MONTHS TO COMPLETE AND DELIVER IAW FAR 52.212-4 CONTRACT TERMS AND CONDITIONS COMMERCIAL PRODU
Nov 30, 2023P00009$0BUCHANAN & EDWARDS EXTENSION OF DELIVERY DATES OF CLINS DUE TO REQUIREMENT FOR ADDITIONAL TIME FOR COMPLETION AND/OR DELIVERY IAW FAR 52.212-4 CONTRACT TERMS AND CONDITIONS COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (F) EXCUSABLE DELAYS. BUCHANA
Nov 1, 2023P00008$0BUCHANAN & EDWARDS MODIFICATION TO SECTION 8 KEY PERSONNEL TABLE 1
Oct 31, 2023P00007$0BUCHANAN & EDWARDS EXTENSION OF DELIVERY DATES OF CLINS DUE TO REQUIREMENT FOR ADDITIONAL TIME FOR COMPLETION AND/OR DELIVERY IAW FAR 52.212-4 CONTRACT TERMS AND CONDITIONS COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (F) EXCUSABLE DELAYS CLIN 00
Aug 31, 2023P00006$0BUCHANAN & EDWARDS EXTENSION OF DELIVERY DATES OF NON-SEVERABLE CLINS DUE TO GOVERNMENT DELAYS TO ALLOW FOR COMPLETION AND DELIVERY IAW FAR 52.212-4 52.212-4 CONTRACT TERMS AND CONDITIONS COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (F) EXCUSABLE
Aug 10, 2023P00005$478.2KBUCHANAN & EDWARDS EXERCISE OPTION CLIN 0006 ECM SERVICES (NON-SEVERABLE) AND ACCELERATE PERIOD OF PERFORMANCE START DATE TO AUGUST 2023 FROM DECEMBER 2023 DUE TO IMPACTS OF DELAY CAUSED BY GOVERNMENT
Aug 1, 2023P00004$0BUCHANAN & EDWARDS NO-COST EXTENSION OF NON-SEVERABLE CLINS DUE TO DELAYS AS A RESULT OF THE GOVERNMENT A. CLIN 0001 ECM SPO IMPLEMENTATION TO 9/15/2023. B. CLIN 0005 MOBILE WORKER TO 8/31/2023. C. CLIN 0007 SHAREPOINT DEVSECOPS TO 8/31/2023.
Jun 26, 2023P00003$2.5MBUCHANAN & EDWARDS EXERCISE OPTIONS A. CLIN # 0004 UX EXPERIENCE START 8/1/2023 10 MONTHS $226,590.00 B. CLIN 0012 ENHANCED RECORDS MANAGEMENT START 8/1/2023 10 MONTHS $391,386.00 C. CLIN 0014 INTRANET START 9/1/2023 12 MONTHS $1,589,629.00 D.
Feb 2, 2023P00002$736.4KBUCHANAN & EDWARDS EXERCISE OPTIONS CLIN 0003 ENGAGEMENT MANAGEMENT SYSTEM (EMS) INTEGRATION AND CLIN 0011 ENHANCED TRAINING BUCHANAN EDWARDS - GAO ECM IMPLEMENTATION GOVERNMENT ACCOUNTABILITY OFFICE (GAO) TASKS FOR THE IMPLEMENTATION AND SUPP
Sep 30, 2022P00001$0GOVERNMENT ACCOUNTABLITY OFFICE (GAO) TASKS FOR THE IMPLEMENTATION AND SUPPORT TRANSITION OF THE ENTERPRISE CONTENT MANAGEMENT (ECM) PROGRAM. THE CONTRACTOR SHALL IMPLEMENT THE SPO ECM SOLUTION TO ACHIEVE THE OUTCOMES AND BENEFITS OF THE TASKS TO
Jul 28, 20220$4.8MGOVERNMENT ACCOUNTABLITY OFFICE (GAO) TASKS FOR THE IMPLEMENTATION AND SUPPORT TRANSITION OF THE ENTERPRISE CONTENT MANAGEMENT (ECM) PROGRAM. THE CONTRACTOR SHALL IMPLEMENT THE SPO ECM SOLUTION TO ACHIEVE THE OUTCOMES AND BENEFITS OF THE TASKS TO

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
85/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 85/100. Available recorded signals: 80 points.

Contract end 2027-01-31 (98 days from calculation)
+35 points
65 historical awards in this buyer and category group
+15 points
61 recorded award transactions
+10 points
Latest award action: 2026-07-15
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.