IGF::OT::IGF - ("OTHER FUNCTIONS") C103754 - DESIGN SERVICES FOR BUILDING 40 NORTH TOWER PROJECT, VRC LABORATORY EXPANSION BLDG; NIH, BETHESDA, MD - STEPHANIE HIXSON THE WORK DESCRIBED IN THIS TASK ORDER INCLUDE THE FOLLOWING: BASE: SCHEMATIC DESIGN TO 35% $1,963,040.00 OPTION 1: 65% DESIGN DEVELOPMENT DOCUMENTS. $1,161,010.41 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF FEBRUARY 1, 2020. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 2: 100%, FINAL CONSTRUCTION DOCUMENTS. $1,164,040.42 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF DECEMBER 1, 2020. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 3: POST DESIGN CONSTRUCTION ADMINISTRATION. $986,876.76 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF JUNE 1, 2021. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 4: CONSTRUCTION INSPECTION SERVICES $265,310.86 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF JUNE 1, 2021. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 5: DEVELOP PLAN FOR MOVEMENT OF USERS IN EXISTING BUILDING 40 TO RELOCATED TO 40A. PROVIDE DESIGN OF RENOVATIONS FOR THIS FACILITY ASSUMING EXISTING INFRASTRUCTURE WILL NOT REQUIRE FULL DESIGN BUT MINOR LAB RENOVATIONS TO OCCUR TO 25% OF SPACE. THESE DESIGN ACTIVITIES ARE ENVISIONED TO OCCUR DURING THE CONSTRUCTION OF THE 40A TOWER. $354,684.12 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF JUNE 1, 2021. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: TASK: 03/22/2019 - 05/22/2022 ORDER: 03/22/2019 - 10/30/2022 PRICE: BASE: $1,963,040.00 OPTION 1: $1,161,010.41 ACCEPTED, EXERCISE BY 2/1/2020 OPTION 2: $1,164,040.42 ACCEPTED, EXERCISE BY 12/1/2020 OPTION 3: $986,876.76 ACCEPTED, EXERCISE BY 6/1/2021 OPTION 4: $265,310.86 ACCEPTED, EXERCISE BY 6/1/2021 OPTION 5: $354,684.12 ACCEPTED, EXERCISE BY 6/1/2021 DELIVER TO: NIH CAMPUS, BLDG. 40 PRODUCT SERVICE CODE: C219 PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- GENERAL: OTHER CAN # 8037135, ORF TAS::75 9/3 0838::TAS 08023820195DB0 DUNS # 07876328 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Health and Human Services |
| Office | NIH A E CONSTRUCTION |
| NAICS | 541330 — Engineering Services |
| PSC | C1JZ — ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS |
| Parent award / vehicle | HHSN292201400001I |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $15.8M |
| Current contract value | $15.8M |
| Potential contract value / ceiling | $16.2M |
| Start date | Mar 21, 2019 |
| Current end date | Nov 30, 2026 |
| Potential end date | Nov 30, 2026 |
| Latest award activity | Jul 1, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 34 of 34 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 1, 2026 | P00033 | $1.1M | C103754: THE REASON FOR THIS MOD IS TO PROVIDE A CONSTRUCTION ADMINISTRATION SERVICES EXTENSION. WITHOUT IT, THE PROJECT CAN'T BE COMPLETED TO SUPPORT THE MISSION. |
| Jan 9, 2026 | P00032 | $5.7K | C103754: POST DESIGN CA. THE REASON FOR THIS MOD IS FOR THE REDESIGN OF PILE UNDER BIO-RETENTION POND TO CONFIRM THE STRUCTURAL SUPPORT BENEATH THE BIO-RETENTION WITHOUT THIS CHANGE, THE PROJECT WILL NOT BE COMPLETE AND USABLE TO SUPPORT THE MISSION. |
| Aug 27, 2025 | P00031 | $4.9K | C103754 - POST DESIGN CONSTRUCTION ADMIN. THE REASON FOR THIS MOD IS TO ADD SIGNAGE CONSULTANT SERVICES TO REVIEW & UPDATE THE DOCUMENTATION AFFECTED BY DRS 7.4 & 47. WITHOUT THIS CHANGE, THE PROJECT WON'T BE COMPLETE AND USABLE TO SUPPO |
| Jun 11, 2025 | P00030 | $29.9K | BUILDING 40A VRC EXPANSION - POST DESIGN CONSTRUCTION ADMINISTRATION. THE REASON FOR THIS MODIFICATION IS FOR ARCHITECTURAL AND ENGINEERING SERVICES TO COMPLETE DESIGN CHANGES TO THE ELECTRICAL ROOM. |
| Dec 20, 2024 | P00029 | $4.1M | BUILDING 40A NIAID VRC EXPANSION - POST DESIGN CONSTRUCTION ADMINISTRATION |
| Dec 13, 2024 | P00028 | $0 | BUILDING 40A NIAID VRC EXPANSION - POST DESIGN CONSTRUCTION ADMINISTRATION |
| Dec 5, 2024 | P00027 | $11.4K | BUILDING 40A NIAID VRC EXPANSION - POST DESIGN CONSTRUCTION ADMINISTRATION |
| Sep 13, 2024 | P00026 | $851.6K | BUILDING 40A NIAID VRC EXPANSION - POST DESIGN CONSTRUCTION ADMINISTRATION |
| Sep 9, 2024 | P00025 | $712.2K | BUILDING 40A NIAID VRC EXPANSION - POST DESIGN CONSTRUCTION ADMINISTRATION |
| Feb 23, 2024 | P00024 | $23.6K | BUILDING 40A NIAID VRC EXPANSION - POST DESIGN CONSTRUCTION ADMINISTRATION |
| Feb 13, 2024 | P00023 | $3.4K | BUILDING 40A NIAID VRC EXPANSION - POST DESIGN CONSTRUCTION ADMINISTRATION |
| Dec 4, 2023 | P00022 | $12.6K | BUILDING 40A NIAID VRC EXPANSION - POST DESIGN CONSTRUCTION ADMINISTRATION |
| Oct 26, 2023 | P00021 | $30.3K | BUILDING 40A NIAID VRC EXPANSION - POST DESIGN CONSTRUCTION ADMINISTRATION |
| Aug 22, 2023 | P00020 | $2.2M | BUILDING 40A NIAID VRC EXPANSION - POST DESIGN CONSTRUCTION ADMINISTRATION |
| May 24, 2023 | P00019 | $37.1K | BUILDING 40A NIAID VRC EXPANSION - POST DESIGN CONSTRUCTION ADMINISTRATION |
| May 16, 2023 | P00018 | $0 | C103754- BUILDING 40A NIAID VRC EXPANSION- POST DESIGN CONSTRUCTION ADMINISTRATION |
| Sep 29, 2022 | P00017 | $67.7K | C103754 - PLANNING AND SCHEMATIC DESIGN, BLDG 40A - MAYA KAI KAI - 3/22/2019 - 01/03/2025 |
| Jun 28, 2022 | P00016 | $27.5K | C103754 - PLANNING AND SCHEMATIC DESIGN, BLDG 40A - MAYA KAI KAI - 3/22/2019 - 01/03/2025 |
| May 31, 2022 | P00015 | $29.1K | C103754 - PLANNING AND SCHEMATIC DESIGN, BLDG 40A - MAYA KAI KAI - 3/22/2019 - 01/03/2025 |
| Apr 18, 2022 | P00014 | $5.6K | C103754 - PLANNING AND SCHEMATIC DESIGN, BLDG 40A - MAYA KAI KAI - 3/22/2019 - 01/03/2025 |
| Feb 15, 2022 | P00013 | $125.1K | C103754 - PLANNING AND SCHEMATIC DESIGN, BLDG 40A - MAYA KAI KAI - 3/22/2019 - 01/03/2025 |
| Feb 8, 2022 | P00012 | $16.3K | C103754 - PLANNING AND SCHEMATIC DESIGN, BLDG 40A - MAYA KAI KAI - 3/22/2019-10/30/2022 |
| Jul 19, 2021 | P00011 | $903.7K | C103754 - MODIFICATION P00011: REA |
| Nov 12, 2020 | P00009 | $1.2M | C103754 - MODIFICATION P00009: 100% FINAL CONSTRUCTION DOCUMENTS - GRETCHEN COWMAN - PERIOD OF PERFORMANCE: 11/5/20 - 4/13/21 |
| Sep 24, 2020 | P00008 | $54.0K | C103754 - CHANGE ORDER #4: OFFICE MODIFICATIONS AND PROGRESSIVE COLLAPSE STRUCTURAL MODIFICATIONS - GRETCHEN COWMAN - PERIOD OF PERFORMANCE: 3/22/19 - 10/30/22 |
| Sep 18, 2020 | P00007 | $73.0K | C103754 - CHANGE ORDER #3: LEED HABITAT SURVEY, DUAL UNITS IN DESIGN DOCUMENTS - GRETCHEN COWMAN - PERIOD OF PERFORMANCE: 3/22/19 - 10/30/22 |
| Sep 2, 2020 | P00006 | $0 | C103754 - DESIGN SERVICES FOR BUILDING 40 NORTH TOWER PROJECT, VRC LABORATORY EXPANSION BLDG; NIH, BETHESDA, MD - GRETCHEN COWMAN |
| Jul 10, 2020 | P00005 | $17.7K | C103754 - DESIGN SERVICES FOR BUILDING 40 NORTH TOWER PROJECT, VRC LABORATORY EXPANSION BLDG; NIH, BETHESDA, MD - GRETCHEN COWMAN |
| May 14, 2020 | P00004 | $0 | C103754 - DESIGN SERVICES FOR BUILDING 40 NORTH TOWER PROJECT, VRC LABORATORY EXPANSION BLDG; NIH, BETHESDA, MD - GRETCHEN COWMAN |
| May 8, 2020 | P00003 | $119.5K | C103754 - DESIGN SERVICES FOR BUILDING 40 NORTH TOWER PROJECT, VRC LABORATORY EXPANSION BLDG; NIH, BETHESDA, MD - GRETCHEN COWMAN |
| Feb 10, 2020 | P00002 | $1.2M | C103754 - DESIGN SERVICES FOR BUILDING 40 NORTH TOWER PROJECT, VRC LABORATORY EXPANSION BLDG; NIH, BETHESDA, MD - GRETCHEN COWMAN |
| Sep 24, 2019 | P00001 | $-8.2K | C103754 - DESIGN SERVICES FOR BUILDING 40 NORTH TOWER PROJECT, VRC LABORATORY EXPANSION BLDG; NIH, BETHESDA, MD - STEPHANIE HIXSON |
| Mar 22, 2019 | P00010 | $986.9K | C103754 - MODIFICATION P00009: 100% FINAL CONSTRUCTION DOCUMENTS - GRETCHEN COWMAN - PERIOD OF PERFORMANCE: 11/5/20 - 4/13/21 |
| Mar 21, 2019 | 0 | $2.0M | IGF::OT::IGF - ("OTHER FUNCTIONS") C103754 - DESIGN SERVICES FOR BUILDING 40 NORTH TOWER PROJECT, VRC LABORATORY EXPANSION BLDG; NIH, BETHESDA, MD - STEPHANIE HIXSON THE WORK DESCRIBED IN THIS TASK ORDER INCLUDE THE FOLLOWING: BASE: SCHEMATIC DESIGN TO 35% $1,963,040.00 OPTION 1: 65% DESIGN DEVELOPMENT DOCUMENTS. $1,161,010.41 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF FEBRUARY 1, 2020. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 2: 100%, FINAL CONSTRUCTION DOCUMENTS. $1,164,040.42 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF DECEMBER 1, 2020. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 3: POST DESIGN CONSTRUCTION ADMINISTRATION. $986,876.76 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF JUNE 1, 2021. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 4: CONSTRUCTION INSPECTION SERVICES $265,310.86 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF JUNE 1, 2021. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 5: DEVELOP PLAN FOR MOVEMENT OF USERS IN EXISTING BUILDING 40 TO RELOCATED TO 40A. PROVIDE DESIGN OF RENOVATIONS FOR THIS FACILITY ASSUMING EXISTING INFRASTRUCTURE WILL NOT REQUIRE FULL DESIGN BUT MINOR LAB RENOVATIONS TO OCCUR TO 25% OF SPACE. THESE DESIGN ACTIVITIES ARE ENVISIONED TO OCCUR DURING THE CONSTRUCTION OF THE 40A TOWER. $354,684.12 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF JUNE 1, 2021. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: TASK: 03/22/2019 - 05/22/2022 ORDER: 03/22/2019 - 10/30/2022 PRICE: BASE: $1,963,040.00 OPTION 1: $1,161,010.41 ACCEPTED, EXERCISE BY 2/1/2020 OPTION 2: $1,164,040.42 ACCEPTED, EXERCISE BY 12/1/2020 OPTION 3: $986,876.76 ACCEPTED, EXERCISE BY 6/1/2021 OPTION 4: $265,310.86 ACCEPTED, EXERCISE BY 6/1/2021 OPTION 5: $354,684.12 ACCEPTED, EXERCISE BY 6/1/2021 DELIVER TO: NIH CAMPUS, BLDG. 40 PRODUCT SERVICE CODE: C219 PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- GENERAL: OTHER CAN # 8037135, ORF TAS::75 9/3 0838::TAS 08023820195DB0 DUNS # 07876328 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2026-11-30 (36 days from calculation)
- +35 points
- 12 historical awards in this buyer and category group
- +15 points
- 34 recorded award transactions
- +10 points
- Latest award action: 2026-07-01
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.