Federal contract award

75N99022F00003

C103157: SURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Health and Human Services
OfficeNIH A E CONSTRUCTION
NAICS236220 — Commercial and Institutional Building Construction
PSCY1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Parent award / vehicle75N99019D00016
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$761.6M
Current contract value$761.6M
Potential contract value / ceiling$761.6M
Start dateMar 22, 2022
Current end dateJan 25, 2029
Potential end dateJan 25, 2029
Latest award activityAug 31, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 40 of 40 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 31, 2026P00039$254.7KC106418 THIS MODIFICATION PROVIDES ADDITIONAL TECHNICAL SUPPORT SERVICES FOR CX AND INCREASED DIESEL FUEL ALLOWANCE.
Aug 4, 2026P00038$1.3MC103157 THIS MOD INCORPORATES MULTIPLE CHANGE ORDERS FOR REINSTATE MEN'S RESTROOMS, ADDED CEILING SERVICE PANELS, HIGH PURITY WATER, ELEVATOR SUMP PUMP UPSIZING, MRI NON-FERROUS MATERIALS COORDINATION, AND IT RACK RECEPTACLE CHANGES.
Jun 30, 2026P00037$3.7MC106418 THIS MOD INCORPORATES MULTIPLE CHANGE ORDERS FOR EXISTING RETURN PUMP PIPING REPAIR, RFI0297R2 RESPONSE, NEW LOCKSET CORES, ADD OUTLETS, INVESTIGATE FEEDERS, CABLE PURCHASE ALLOWANCE, AND O&M SUPPORT SERVICES.
May 11, 2026P00036$0C106418 THIS MOD INCORPORATES A 57 CALENDAR DAY NO COST TIME EXTENSION TO PHASES 0 AND 1 TO THE ESSEG PROJECT DUE TO UNFORESEEN CONDITIONS AND OUTAGE DELAYS. PHASE 0 AND 1 COMPLETION IS EXTENDED TO 30 APRIL 2026.
Apr 7, 2026P00035$1.7MC103157 THIS MOD INCORPORATES MULTIPLE CHANGES INCLUDING NON-ELECTRICAL VALIDATION ITEMS, HIGH PURITY WATER, SECURITY CAMERAS, STEAM VALVE REPLACEMENT, AND STERILIZER EQUIPMENT UPGRADES. WITHOUT THESE CHANGES THE BUILDING WILL BE UNOCCUPIABLE.
Feb 3, 2026P00034$56.6KC106418 THIS MOD INCORPORATES ELECTRICAL SYSTEM CHANGES DUE TO MULTIPLE RFI RESPONSES. WITHOUT THESE CHANGES THE BACKUP ELECTRICAL SYSTEM WOULD BE INCOMPLETE AND NON-COMPATIBLE WITH EXISTING SYSTEMS.
Jan 15, 2026P00033$0C106418 THIS MOD INCORPORATES A 79 CALENDAR DAY NO COST TIME EXTENSION TO PHASES 0 AND 1 TO THE ESSEG PROJECT DUE TO UNFORESEEN CONDITIONS AND OUTAGE DELAYS. PHASE 0 AND 1 COMPLETION IS EXTENDED TO 4 MARCH 2026.
Sep 30, 2025P00030$1.6MC103157 THIS MOD IS UNILATERAL ACTION TO INCORPORATE CONSTRUCTION OF REVISED DESIGN MODIFICATIONS FOR LAB MODS, FLOOR FINISHES, AND REPURPOSE SPACES. WITHOUT THESE MODS THE SPACE WOULD BE INCOMPLETE RENDERING THE BUILDING UNOCCUPIABLE.
Sep 30, 2025P00031$12.9MC103157 THIS MOD INCORPORATES RF, MAGNETIC, AND EMI SHIELDING FOR MRI SPACES. WITHOUT THESE MODS THE SPACE WOULD BE INCOMPLETE RENDERING THE BUILDING UNOCCUPIABLE.
Sep 30, 2025P00032$12.2MC103157 THIS MOD INCORPORATES CUSTOMER REQUESTED DESIGN CHANGES TO CLINICAL AND HOSPITAL SPACES. WITHOUT THESE MODS THE SPACE WOULD BE INCOMPLETE RENDERING THE BUILDING UNOCCUPIABLE.
Sep 26, 2025P00028$1.2MC106418 THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DESIGN BULLETINS AND RFI RESPONSES INTO CONSTRUCTION ACTIVITIES. WITHOUT THIS MODIFICATION THE GENERATORS WILL BE INCOMPLETE AND NON-USEABLE.
Sep 26, 2025P00029$0C103157 THE PURPOSE OF THIS MODIFICATION IS PROVIDE CHANGES IN CONTRACT LINE ACCOUNTING DATA.
Jul 22, 2025P00027$1.5MTHE REASON FOR THIS MODIFICATION IS TO INCLUDE VARIOUS CONSTRUCTION CHANGES DUE TO UNFORESEEN CONDITIONS, CUSTOMER REQUESTED CHANGES, AND DESIGN DEFICIENCIES. A NO COST TIME EXTENSION IS INCLUDED FOR WEATHER AND ADMIN.
May 22, 2025P00026$178.4KTHE CONTRACT ACTION IS ESSENTIAL TO ENSURE CONSTRUCTION ACTIVITIES CONTINUE TO PROGRESS AND REMAIN COMPLIANT WITH ALL SAFETY, REGULATORY, AND FUNCTIONAL SPECIFICATIONS TO ENSURE THE FACILITY COMPLIES WITH THE HIGHEST INDUSTRY STANDARDS.
May 8, 2025P00025$7.7MTHE CONTRACT ACTION IS ESSENTIAL TO ENSURE CONSTRUCTION ACTIVITIES CONTINUE TO PROGRESS AND REMAIN COMPLIANT WITH ALL SAFETY, REGULATORY, AND FUNCTIONAL SPECIFICATIONS TO ENSURE THE FACILITY COMPLIES WITH THE HIGHEST INDUSTRY STANDARDS.
Mar 31, 2025P00024$311.1KTHIS CONTRACT ACTION IS ESSENTIAL TO ENSURE CONSTRUCTION ACTIVITIES CONTINUE TO PROGRESS AND REMAIN COMPLIANT WITH ALL SAFETY, REGULATORY, AND FUNCTIONAL SPECIFICATIONS TO ENSURE THE FACILITY COMPLIES WITH THE HIGHEST INDUSTRY STANDARDS.
Jan 7, 2025P00023$263.0KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Nov 1, 2024P00022$304.1KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Sep 27, 2024P00021$292.4KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Sep 26, 2024P00020$2.8MSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Aug 28, 2024P00019$279.8KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Aug 26, 2024P00018$55.4KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Aug 7, 2024P00017$84.6KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Jul 23, 2024P00016$196.1KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Jun 7, 2024P00015$187.7KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Jun 3, 2024P00014$482.2KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
May 28, 2024P00013$101.8KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Mar 28, 2024P00012$119.5KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Feb 13, 2024P00011$27.9KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Jan 17, 2024P00010$0SURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Dec 5, 2023P00009$202.4KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Oct 26, 2023P00008$28.9KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Sep 19, 2023P00007$1.6MSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Jun 12, 2023P00006$0SURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Apr 5, 2023P00005$25.4KSURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
Dec 22, 2022P00004$2.0MC103157: SURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION
Nov 10, 2022P00003$5.2MC103157: SURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION
Sep 29, 2022P00002$74.7MC103157: SURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION
Apr 13, 2022P00001$53.9MC103157: SURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION
Mar 22, 20220$574.1MC103157: SURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION

Estimated positioning window

Jan 25, 2028 – Jul 25, 2028

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2029-01-25 (823 days from calculation)
+15 points
541 historical awards in this buyer and category group
+15 points
40 recorded award transactions
+10 points
Latest award action: 2026-08-31
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.