Federal contract award

75N99024C00036

C116280 DESIGN BUILD FOR REPLACEMENT OF CHILLER PLANT VALVES CS: BRAD ARENSDORF CO: ZACH PRICE COR: JOHN FRATANGELO

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Health and Human Services
OfficeNIH A E CONSTRUCTION
NAICS236210 — Industrial Building Construction
PSCY1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleNot reported
Set-aside8(A) SOLE SOURCE
Pricing typeFIRM FIXED PRICE
Obligations$9.6M
Current contract value$9.6M
Potential contract value / ceiling$9.6M
Start dateJun 1, 2024
Current end dateFeb 28, 2027
Potential end dateFeb 28, 2027
Latest award activityJul 16, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 16, 2026P00008$0EO 14398 CONTRACT UPDATES FOR CHILLER VALVE REPLACEMENT CONTRACT
Jul 9, 2026P00007$0C116280 DESIGN BUILD FOR REPLACEMENT OF CHILLER PLANT VALVES CO: CHRIS POSTEK COR: CASEY HUGHES
Jul 7, 2026P00006$1.2MC116280 DESIGN BUILD FOR REPLACEMENT OF CHILLER PLANT VALVES CO: CHRIS POSTEK COR: CASEY HUGHES
Sep 26, 2025P00005$4.6MC116280 DESIGN BUILD FOR REPLACEMENT OF CHILLER PLANT VALVES CO: CHRIS POSTEK COR: CASEY HUGHES
Jul 25, 2025P00004$8.8KC116280 DESIGN BUILD FOR REPLACEMENT OF CHILLER PLANT VALVES CO: CHRIS POSTEK COR: CASEY HUGHES
May 13, 2025P00003$0C116280 DESIGN BUILD FOR REPLACEMENT OF CHILLER PLANT VALVES THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE POP FROM 5/31/25 TO 12/31/25 AT NO COST TO THE GOVERNMENT. CS: BRAD ARENSDORF CO: ZACH PRICE COR: CASEY HUGHES
Aug 15, 2024P00002$185.4KC116280 DESIGN BUILD FOR REPLACEMENT OF CHILLER PLANT VALVES CS: BRAD ARENSDORF CO: ZACH PRICE COR: JOHN FRATANGELO
Aug 7, 2024P00001$0C116280 DESIGN BUILD FOR REPLACEMENT OF CHILLER PLANT VALVES CS: BRAD ARENSDORF CO: ZACH PRICE COR: JOHN FRATANGELO
Jul 11, 20240$3.6MC116280 DESIGN BUILD FOR REPLACEMENT OF CHILLER PLANT VALVES CS: BRAD ARENSDORF CO: ZACH PRICE COR: JOHN FRATANGELO

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-02-28 (119 days from calculation)
+35 points
7 historical awards in this buyer and category group
+15 points
9 recorded award transactions
+10 points
Latest award action: 2026-07-16
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.