Federal contract award

75N99025F00010

C201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Health and Human Services
OfficeNIH A E CONSTRUCTION
NAICS541330 — Engineering Services
PSCC219 — Other Architect and Engineering Services
Parent award / vehicle75N99020D00005
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$219.9K
Current contract value$219.9K
Potential contract value / ceiling$219.9K
Start dateSep 11, 2025
Current end dateJul 31, 2026
Potential end dateJul 31, 2026
Latest award activityJun 2, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 2, 2026P00004$0C201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS
May 27, 2026P00003$-250.0KC201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS
May 22, 2026P00002$250.0KC201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS
May 1, 2026P00001$0C201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS
Sep 16, 20250$219.9KC201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.