Federal contract award
75N99025F00010
C201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Health and Human Services |
| Office | NIH A E CONSTRUCTION |
| NAICS | 541330 — Engineering Services |
| PSC | C219 — Other Architect and Engineering Services |
| Parent award / vehicle | 75N99020D00005 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $219.9K |
| Current contract value | $219.9K |
| Potential contract value / ceiling | $219.9K |
| Start date | Sep 11, 2025 |
| Current end date | Jul 31, 2026 |
| Potential end date | Jul 31, 2026 |
| Latest award activity | Jun 2, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 2, 2026 | P00004 | $0 | C201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS |
| May 27, 2026 | P00003 | $-250.0K | C201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS |
| May 22, 2026 | P00002 | $250.0K | C201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS |
| May 1, 2026 | P00001 | $0 | C201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS |
| Sep 16, 2025 | 0 | $219.9K | C201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS |