Federal contract award
80GRC023F0117
SA-HAILSTORM DESIGN, FABRICATION, AND INSTALL SUPPORT - PSL 4 WILL BE USED TO TEST A JET ENGINE IN Q3 AND Q4 OF CY 2024. IN PREPARATION FOR THIS TEST, NEW HARDWARE MUST BE DESIGNED AND BUILT AND A COUPLE TEST-SPECIFIC SYSTEMS NEED TO BE MODIFIED.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GLENN RESEARCH CENTER |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | R408 — Program Management/Support Services |
| Parent award / vehicle | 80GRC020D0003 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $2.2M |
| Current contract value | $2.2M |
| Potential contract value / ceiling | $2.2M |
| Start date | Sep 18, 2023 |
| Current end date | Mar 31, 2027 |
| Potential end date | Mar 31, 2027 |
| Latest award activity | Jun 25, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 25, 2026 | P00007 | $-2.2K | SA-HAILSTORM DESIGN, FABRICATION, AND INSTALL SUPPORT - PSL 4 WILL BE USED TO TEST A JET ENGINE IN Q3 AND Q4 OF CY 2024. IN PREPARATION FOR THIS TEST, NEW HARDWARE MUST BE DESIGNED AND BUILT AND A COUPLE TEST-SPECIFIC SYSTEMS NEED TO BE MODIFIED. |
| Dec 1, 2025 | P00006 | $0 | SA-HAILSTORM DESIGN, FABRICATION, AND INSTALL SUPPORT - PSL 4 WILL BE USED TO TEST A JET ENGINE IN Q3 AND Q4 OF CY 2024. IN PREPARATION FOR THIS TEST, NEW HARDWARE MUST BE DESIGNED AND BUILT AND A COUPLE TEST-SPECIFIC SYSTEMS NEED TO BE MODIFIED. |
| May 20, 2025 | P00005 | $300.0K | SA-HAILSTORM DESIGN, FABRICATION, AND INSTALL SUPPORT - PSL 4 WILL BE USED TO TEST A JET ENGINE IN Q3 AND Q4 OF CY 2024. IN PREPARATION FOR THIS TEST, NEW HARDWARE MUST BE DESIGNED AND BUILT AND A COUPLE TEST-SPECIFIC SYSTEMS NEED TO BE MODIFIED. |
| Mar 26, 2025 | P00004 | $0 | SA-HAILSTORM DESIGN, FABRICATION, AND INSTALL SUPPORT - PSL 4 WILL BE USED TO TEST A JET ENGINE IN Q3 AND Q4 OF CY 2024. IN PREPARATION FOR THIS TEST, NEW HARDWARE MUST BE DESIGNED AND BUILT AND A COUPLE TEST-SPECIFIC SYSTEMS NEED TO BE MODIFIED. |
| Mar 18, 2025 | P00003 | $606.6K | SA-HAILSTORM DESIGN, FABRICATION, AND INSTALL SUPPORT - PSL 4 WILL BE USED TO TEST A JET ENGINE IN Q3 AND Q4 OF CY 2024. IN PREPARATION FOR THIS TEST, NEW HARDWARE MUST BE DESIGNED AND BUILT AND A COUPLE TEST-SPECIFIC SYSTEMS NEED TO BE MODIFIED. |
| Sep 12, 2024 | P00002 | $450.1K | SA-HAILSTORM DESIGN, FABRICATION, AND INSTALL SUPPORT - PSL 4 WILL BE USED TO TEST A JET ENGINE IN Q3 AND Q4 OF CY 2024. IN PREPARATION FOR THIS TEST, NEW HARDWARE MUST BE DESIGNED AND BUILT AND A COUPLE TEST-SPECIFIC SYSTEMS NEED TO BE MODIFIED. |
| Oct 31, 2023 | P00001 | $722.9K | SA-HAILSTORM DESIGN, FABRICATION, AND INSTALL SUPPORT - PSL 4 WILL BE USED TO TEST A JET ENGINE IN Q3 AND Q4 OF CY 2024. IN PREPARATION FOR THIS TEST, NEW HARDWARE MUST BE DESIGNED AND BUILT AND A COUPLE TEST-SPECIFIC SYSTEMS NEED TO BE MODIFIED. |
| Sep 22, 2023 | 0 | $102.0K | SA-HAILSTORM DESIGN, FABRICATION, AND INSTALL SUPPORT - PSL 4 WILL BE USED TO TEST A JET ENGINE IN Q3 AND Q4 OF CY 2024. IN PREPARATION FOR THIS TEST, NEW HARDWARE MUST BE DESIGNED AND BUILT AND A COUPLE TEST-SPECIFIC SYSTEMS NEED TO BE MODIFIED. |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2027-03-31 (150 days from calculation)
- +35 points
- 68 historical awards in this buyer and category group
- +15 points
- 8 recorded award transactions
- +10 points
- Latest award action: 2026-06-25
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.