Federal contract award
80GSFC18C0008
THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS) IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 541713 — Research and Development in Nanotechnology |
| PSC | AR11 — SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST NO FEE |
| Obligations | $184.3M |
| Current contract value | $184.3M |
| Potential contract value / ceiling | $184.3M |
| Start date | Mar 5, 2018 |
| Current end date | Nov 30, 2026 |
| Potential end date | Nov 30, 2026 |
| Latest award activity | Aug 26, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 79 of 79 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 26, 2026 | P00078 | $0 | TANDEM RECONNECTION & CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITES (TRACERS) MISSION USES TWIN SATELLITES TO STUDY THE SUN-EARTH CONNECTION BY INVESTIGATING MAGNETIC RECONNECTION & ITS EFFECTS IN EARTH'S ATMOSPHERE. |
| Jul 20, 2026 | P00077 | $307.2K | TANDEM RECONNECTION & CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITES (TRACERS) MISSION USES TWIN SATELLITES TO STUDY THE SUN-EARTH CONNECTION BY INVESTIGATING MAGNETIC RECONNECTION & ITS EFFECTS IN EARTH'S ATMOSPHERE. |
| Jun 18, 2026 | P00076 | $0 | IAW E.O. 14398, ADDED 52.222-90. TANDEM RECONNECTION & CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITES (TRACERS) MISSION USES TWIN SATELLITES TO STUDY THE SUN-EARTH CONNECTION BY INVESTIGATING MAGNETIC RECONNECTION & ITS EFFECTS IN EARTH'S ATMOSPHERE. |
| May 20, 2026 | P00075 | $311.2K | TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITES (TRACERS) MISSION IS A NASA INITIATIVE USING TWO TWIN SATELLITES TO STUDY THE SUN-EARTH CONNECTION BY INVESTIGATING MAGNETIC RECONNECTION AND ITS EFFECTS IN EARTH'S ATMOSPHERE. |
| Apr 30, 2026 | P00074 | $2.3M | TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITES (TRACERS) MISSION IS A NASA INITIATIVE USING TWO TWIN SATELLITES TO STUDY THE SUN-EARTH CONNECTION BY INVESTIGATING MAGNETIC RECONNECTION AND ITS EFFECTS IN EARTH'S ATMOSPHERE. |
| Mar 18, 2026 | P00073 | $0 | TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITES (TRACERS) MISSION IS A NASA INITIATIVE USING TWO TWIN SATELLITES TO STUDY THE SUN-EARTH CONNECTION BY INVESTIGATING MAGNETIC RECONNECTION AND ITS EFFECTS IN EARTH'S ATMOSPHERE. |
| Jan 30, 2026 | P00072 | $2.7M | TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITES (TRACERS) MISSION IS A NASA INITIATIVE USING TWO TWIN SATELLITES TO STUDY THE SUN-EARTH CONNECTION BY INVESTIGATING MAGNETIC RECONNECTION AND ITS EFFECTS IN EARTH'S ATMOSPHERE. |
| Jan 13, 2026 | P00071 | $0 | TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITES (TRACERS) MISSION IS A NASA INITIATIVE USING TWO TWIN SATELLITES TO STUDY THE SUN-EARTH CONNECTION BY INVESTIGATING MAGNETIC RECONNECTION AND ITS EFFECTS IN EARTH'S ATMOSPHERE. |
| Dec 3, 2025 | P00070 | $2.0M | TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITES (TRACERS) MISSION IS A NASA INITIATIVE USING TWO TWIN SATELLITES TO STUDY THE SUN-EARTH CONNECTION BY INVESTIGATING MAGNETIC RECONNECTION AND ITS EFFECTS IN EARTH'S ATMOSPHERE. |
| Sep 5, 2025 | P00069 | $4.5M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Aug 21, 2025 | P00068 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Aug 19, 2025 | P00067 | $578.2K | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jul 21, 2025 | P00066 | $3.0M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jun 23, 2025 | P00065 | $1.6M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jun 13, 2025 | P00064 | $1.2M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jun 5, 2025 | P00063 | $282.0K | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| May 12, 2025 | P00062 | $77.5K | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| May 5, 2025 | P00061 | $3.6M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Apr 30, 2025 | P00060 | $0 | REMOVAL OF CLAUSES/DRDS IAW [EO 14173 AND 14168] THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Apr 11, 2025 | P00059 | $665.6K | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Mar 21, 2025 | P00057 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Mar 21, 2025 | P00058 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Mar 14, 2025 | P00056 | $447.3K | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Mar 7, 2025 | P00055 | $747.0K | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Feb 6, 2025 | P00054 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jan 15, 2025 | P00053 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jan 8, 2025 | P00052 | $2.4M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Sep 20, 2024 | P00051 | $5.1M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jul 26, 2024 | P00050 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| May 6, 2024 | P00049 | $3.0M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Nov 20, 2023 | P00048 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Sep 26, 2023 | P00047 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Sep 5, 2023 | P00046 | $13.0M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jun 13, 2023 | P00045 | $481.7K | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jun 8, 2023 | P00043 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jun 8, 2023 | P00044 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Dec 1, 2022 | P00042 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Aug 30, 2022 | P00041 | $8.0M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jul 28, 2022 | P00040 | $59.5M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jul 12, 2022 | P00039 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jun 29, 2022 | P00038 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jun 1, 2022 | P00037 | $4.3M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Apr 26, 2022 | P00036 | $3.7M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Mar 31, 2022 | P00035 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Mar 2, 2022 | P00034 | $4.6M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Feb 10, 2022 | P00033 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jan 27, 2022 | P00032 | $2.4M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Dec 16, 2021 | P00031 | $15.7M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Nov 17, 2021 | P00030 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Oct 15, 2021 | P00029 | $0 | EO14042 THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Oct 12, 2021 | P00028 | $3.5M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Sep 30, 2021 | P00027 | $331.1K | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Sep 1, 2021 | P00026 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jun 28, 2021 | P00025 | $1.5M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| May 13, 2021 | P00024 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Apr 7, 2021 | P00023 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Feb 4, 2021 | P00022 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jan 7, 2021 | P00021 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Nov 12, 2020 | P00020 | $824.1K | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Oct 30, 2020 | P00019 | $110.5K | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Oct 8, 2020 | P00018 | $3.7M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Sep 28, 2020 | P00017 | $621.0K | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Sep 15, 2020 | P00016 | $16.5M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Aug 27, 2020 | P00015 | $6.2M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jul 6, 2020 | P00014 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| May 22, 2020 | P00013 | $1.2M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| May 15, 2020 | P00012 | $1.1M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Apr 16, 2020 | P00011 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Mar 10, 2020 | P00010 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Oct 21, 2019 | P00008 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Oct 21, 2019 | P00009 | $1.0M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Aug 7, 2019 | P00007 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jul 18, 2019 | P00005 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jul 18, 2019 | P00006 | $18.4K | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Jun 26, 2019 | P00004 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Feb 14, 2019 | P00003 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Apr 5, 2018 | P00002 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Mar 5, 2018 | 0 | $0 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS) IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
| Mar 5, 2018 | P00001 | $1.2M | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2026-11-30 (29 days from calculation)
- +35 points
- 4 historical awards in this buyer and category group
- +15 points
- 79 recorded award transactions
- +10 points
- Latest award action: 2026-08-26
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.