Federal contract award

80GSFC18C0014

UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE 3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS 7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS541330 — Engineering Services
PSC6610 — Flight Instruments
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$143.6M
Current contract value$144.4M
Potential contract value / ceiling$144.4M
Start dateNov 22, 2017
Current end dateDec 2, 2027
Potential end dateDec 2, 2027
Latest award activityJun 30, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 37 of 37 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 30, 2026P00036$4.4MTHIS MOD ADDS FUNDING TO SUPPORT PERFORMANCE OF PHASE E/F WORK.
Jun 17, 2026P00035$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CLAUSE 52.222-90. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Sep 17, 2025P00034$8.1MTHE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE UNPRICED CHANGE ORDER THAT WAS EXECUTED IN P00030 TO INCORPORATE PHASE E&F SCOPE INTO THE CONTRACT - UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Aug 20, 2025P00033$2.4MTHE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE UNPRICED CHANGE ORDER THAT WAS EXECUTED IN P00030 TO INCORPORATE PHASE E&F SCOPE INTO THE CONTRACT - UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Jul 29, 2025P00032$0THE PURPOSE OF THIS MODIFICATION IS TO ANNOTATE THE REALLOCATION OF CONTRACT VALUE AND CANCEL RFP - INCORPORATION OF ATTACHMENT A-4 INTO SECTION J LIST OF ATTACHMENTS - UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Jun 9, 2025P00031$2.4MINCORPORATION OF ATTACHMENT A-4 INTO SECTION J LIST OF ATTACHMENTS - UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
May 7, 2025P00030$0INCORPORATION OF ATTACHMENT A-4 INTO SECTION J LIST OF ATTACHMENTS - UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Apr 30, 2025P00029$0REMOVAL OF CLAUSES IAW PCD 25-01 AND PCD 25-02 - UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Apr 28, 2025P00028$697.4KUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Feb 26, 2025P00027$2.0MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Jan 23, 2025P00026$2.0MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Dec 20, 2023P00025$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Dec 1, 2023P00024$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Apr 17, 2023P00023$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Sep 20, 2022P00022$10.0KUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Jul 20, 2022P00021$6.2MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Oct 14, 2021P00020$0EO14042 UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Oct 4, 2021P00019$1.1MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Sep 2, 2021P00018$69.9MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Jul 29, 2021P00017$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Jun 29, 2021P00016$10.4MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Jun 2, 2021P00015$2.7MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Feb 24, 2021P00014$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Nov 6, 2020P00013$-780.0KUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Aug 1, 2020P00012$852.6KUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Mar 9, 2020P00011$14.3MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A/B CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET.
Feb 24, 2020P00010$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Dec 4, 2019P00009$11.0MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Nov 6, 2019P00008$2.8MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Sep 25, 2019P00007$1.9MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Aug 19, 2019P00006$28.3KUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY..THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO:.1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE.2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE.3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS.4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM.5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS.6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS.7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Jul 8, 2019P00005$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE 3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS 7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Jun 4, 2019P00004$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE 3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS 7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Feb 19, 2019P00003$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE 3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS 7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Mar 22, 2018P00002$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE 3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS 7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Nov 27, 2017P00001$1.0MUNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE 3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS 7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
Nov 22, 20170$0UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE 3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS 7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.

Estimated positioning window

Dec 2, 2026 – Jun 2, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-12-02 (396 days from calculation)
+25 points
2 historical awards in this buyer and category group
+10 points
37 recorded award transactions
+10 points
Latest award action: 2026-06-30
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.