Federal contract award

80GSFC18C0083

THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS336414 — Guided Missile and Space Vehicle Manufacturing
PSC1675 — Space Vehicle Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS AWARD FEE
Obligations$307.8M
Current contract value$307.9M
Potential contract value / ceiling$307.9M
Start dateMay 24, 2018
Current end dateDec 31, 2026
Potential end dateDec 31, 2026
Latest award activityMay 21, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 117 of 117 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 21, 2026P00116$-101.9KTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
May 7, 2026P00115$0DESCOPE OF THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 28, 2026P00114$0DESCOPE OF THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Dec 16, 2025P00113$-1.6MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 5, 2025P00112$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 14, 2025P00111$0REMOVAL OF CLAUSES/DRDS IAW PCD 25-01, CLASS DEVIATION FROM FAR REGARDING E.O. 14173 AND E.O. 14168
Mar 26, 2025P00109$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Mar 26, 2025P00110$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Mar 6, 2025P00108$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 26, 2025P00107$100.0KTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 12, 2025P00105$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 12, 2025P00106$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 10, 2025P00103$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 10, 2025P00104$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jan 27, 2025P00102$1.3MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Dec 5, 2024P00101$580.0KTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Dec 4, 2024P00099$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Dec 4, 2024P00100$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Sep 10, 2024P00098$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 22, 2024P00097$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
May 6, 2024P00096$5.5MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 19, 2024P00095$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 11, 2024P00094$2.2MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Mar 29, 2024P00093$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Mar 26, 2024P00092$2.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Mar 22, 2024P00091$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Mar 6, 2024P00090$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 29, 2024P00089$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 7, 2024P00088$2.5MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jan 8, 2024P00087$3.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Dec 5, 2023P00086$2.6MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Nov 29, 2023P00085$500.0KTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Sep 29, 2023P00084$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Sep 14, 2023P00083$4.4MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 9, 2023P00082$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 3, 2023P00081$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 2, 2023P00080$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jun 26, 2023P00079$9.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jun 20, 2023P00078$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
May 30, 2023P00077$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
May 3, 2023P00076$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 13, 2023P00074$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 13, 2023P00075$8.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 10, 2023P00073$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 4, 2023P00072$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 3, 2023P00071$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 16, 2023P00070$6.2MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 8, 2023P00067$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 8, 2023P00068$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 8, 2023P00069$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jan 26, 2023P00066$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Dec 13, 2022P00065$5.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Sep 26, 2022P00064$8.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Sep 14, 2022P00063$2.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 3, 2022P00061$10.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 3, 2022P00062$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 2, 2022P00060$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jul 12, 2022P00059$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jun 7, 2022P00058$6.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 25, 2022P00057$9.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 12, 2022P00056$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Mar 24, 2022P00055$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Mar 10, 2022P00054$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 15, 2022P00053$13.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 14, 2022P00052$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Nov 8, 2021P00051$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Oct 12, 2021P00050$0EO14042 THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Sep 30, 2021P00048$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Sep 30, 2021P00049$23.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Sep 22, 2021P00047$5.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Sep 8, 2021P00046$10.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 12, 2021P00045$10.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 10, 2021P00044$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 9, 2021P00043$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jul 27, 2021P00042$1.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jun 23, 2021P00041$6.5MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
May 27, 2021P00040$6.5MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 29, 2021P00039$6.5MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 6, 2021P00038$6.5MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Mar 18, 2021P00037$2.7MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 12, 2021P00036$0COVID-19 ADVANCE AGREEMENT UPDATE MOD THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 10, 2021P00035$5.5MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jan 27, 2021P00034$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jan 5, 2021P00033$5.5MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Nov 24, 2020P00032$6.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Oct 28, 2020P00031$0COVID-19 INCORPORATE ADVANCE AGREEMENT MOD THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Sep 1, 2020P00030$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 13, 2020P00029$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jul 22, 2020P00028$0COVID-19 INCORPORATE ADVANCE AGREEMENT MOD THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jul 20, 2020P00026$15.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jul 20, 2020P00027$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jul 9, 2020P00025$5.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jul 8, 2020P00024$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jun 16, 2020P00023$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
May 29, 2020P00022$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
May 15, 2020P00021$9.1MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 14, 2020P00019$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 14, 2020P00020$1.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Apr 13, 2020P00018$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 5, 2020P00017$28.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jan 23, 2020P00016$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Dec 10, 2019P00015$6.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Oct 1, 2019P00014$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Sep 16, 2019P00013$10.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 27, 2019P00012$4.5MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jul 23, 2019P00011$5.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Jul 19, 2019P00010$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Mar 29, 2019P00008$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Mar 29, 2019P00009$15.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Mar 8, 2019P00006$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Mar 8, 2019P00007$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 21, 2019P00005$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Feb 7, 2019P00004$5.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC); AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Sep 10, 2018P00003$5.2MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC); AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
Aug 15, 2018P00002$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC); AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
May 25, 2018P00001$5.0MTHE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC); AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
May 24, 20180$0THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2026-12-31 (67 days from calculation)
+35 points
8 historical awards in this buyer and category group
+15 points
117 recorded award transactions
+10 points
Latest award action: 2026-05-21
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.