Federal contract award

80GSFC20C0102

THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS336414 — Guided Missile and Space Vehicle Manufacturing
PSC1675 — Space Vehicle Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$24.1M
Current contract value$24.1M
Potential contract value / ceiling$24.1M
Start dateJul 6, 2020
Current end dateNov 5, 2026
Potential end dateNov 5, 2026
Latest award activityMay 13, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 37 of 37 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 13, 2026P00036$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jul 24, 2025P00035$263.9KTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jun 18, 2025P00034$400.0KTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Apr 8, 2025P00032$400.0KTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Apr 8, 2025P00033$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Mar 12, 2025P00031$500.0KTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Aug 1, 2024P00030$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jul 26, 2024P00029$1.4MTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
May 17, 2024P00028$670.0KTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Mar 20, 2024P00027$243.5KTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Mar 1, 2024P00026$83.3KTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jan 16, 2024P00025$600.0KTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jan 8, 2024P00024$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Nov 21, 2023P00023$750.0KTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Aug 30, 2023P00022$1.6MTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jun 27, 2023P00021$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jun 16, 2023P00020$1.6MTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jun 1, 2023P00019$279.9KTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
May 25, 2023P00018$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Mar 15, 2023P00017$1.0MTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Dec 19, 2022P00016$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Nov 18, 2022P00015$2.0MTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Oct 3, 2022P00014$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Sep 21, 2022P00013$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jun 14, 2022P00012$1.6MTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
May 13, 2022P00011$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Feb 14, 2022P00010$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jan 12, 2022P00009$2.6MTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Oct 13, 2021P00008$0EO14042 THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT
Sep 29, 2021P00007$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jun 10, 2021P00006$3.6MTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Feb 23, 2021P00005$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jan 13, 2021P00004$1.0MTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Nov 6, 2020P00003$2.5MTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Sep 29, 2020P00002$500.0KTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jul 9, 2020P00001$0THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.
Jul 6, 20200$500.0KTHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2026-11-05 (4 days from calculation)
+35 points
8 historical awards in this buyer and category group
+15 points
37 recorded award transactions
+10 points
Latest award action: 2026-05-13
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.