Federal contract award
80GSFC24CA041
JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | AR11 — SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $22.7M |
| Current contract value | $38.2M |
| Potential contract value / ceiling | $38.2M |
| Start date | Aug 30, 2024 |
| Current end date | Jun 1, 2028 |
| Potential end date | Jun 1, 2028 |
| Latest award activity | Jul 23, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 25 of 25 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 23, 2026 | P00024 | $17.2K | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION, OR JEDI, WILL CAPTURE IMAGES OF THE SUN IN EXTREME ULTRAVIOLET LIGHT, A TYPE OF LIGHT INVISIBLE TO OUR EYES BUT REVEALS MANY OF THE UNDERLYING MECHANISMS OF THE SUN'S ACTIVITY. |
| May 26, 2026 | P00022 | $0 | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION, OR JEDI, WILL CAPTURE IMAGES OF THE SUN IN EXTREME ULTRAVIOLET LIGHT, A TYPE OF LIGHT INVISIBLE TO OUR EYES BUT REVEALS MANY OF THE UNDERLYING MECHANISMS OF THE SUN'S ACTIVITY. |
| May 26, 2026 | P00023 | $0 | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION, OR JEDI, WILL CAPTURE IMAGES OF THE SUN IN EXTREME ULTRAVIOLET LIGHT, A TYPE OF LIGHT INVISIBLE TO OUR EYES BUT REVEALS MANY OF THE UNDERLYING MECHANISMS OF THE SUN'S ACTIVITY. |
| Apr 29, 2026 | P00021 | $7.2M | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION, OR JEDI, WILL CAPTURE IMAGES OF THE SUN IN EXTREME ULTRAVIOLET LIGHT, A TYPE OF LIGHT INVISIBLE TO OUR EYES BUT REVEALS MANY OF THE UNDERLYING MECHANISMS OF THE SUN'S ACTIVITY. |
| Feb 25, 2026 | P00020 | $3.4M | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION, OR JEDI, WILL CAPTURE IMAGES OF THE SUN IN EXTREME ULTRAVIOLET LIGHT, A TYPE OF LIGHT INVISIBLE TO OUR EYES BUT REVEALS MANY OF THE UNDERLYING MECHANISMS OF THE SUN'S ACTIVITY. |
| Feb 24, 2026 | P00019 | $0 | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION, OR JEDI, WILL CAPTURE IMAGES OF THE SUN IN EXTREME ULTRAVIOLET LIGHT, A TYPE OF LIGHT INVISIBLE TO OUR EYES BUT REVEALS MANY OF THE UNDERLYING MECHANISMS OF THE SUN'S ACTIVITY. |
| Dec 18, 2025 | P00018 | $0 | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION, OR JEDI, WILL CAPTURE IMAGES OF THE SUN IN EXTREME ULTRAVIOLET LIGHT, A TYPE OF LIGHT INVISIBLE TO OUR EYES BUT REVEALS MANY OF THE UNDERLYING MECHANISMS OF THE SUN'S ACTIVITY. |
| Dec 11, 2025 | P00017 | $1.0M | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION, OR JEDI, WILL CAPTURE IMAGES OF THE SUN IN EXTREME ULTRAVIOLET LIGHT, A TYPE OF LIGHT INVISIBLE TO OUR EYES BUT REVEALS MANY OF THE UNDERLYING MECHANISMS OF THE SUN'S ACTIVITY. |
| Sep 24, 2025 | P00016 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE ALLOTMENT DATE TO 1/2/2026. |
| Sep 15, 2025 | P00015 | $1.6M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FULL AND EQUITABLE ADJUSTMENT IN THE AMOUNT OF $1,575,896.00 FOR THE SWRI PROPOSAL NUMBER 19-97929D DATED JULY 8, 2025. |
| Sep 2, 2025 | P00014 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE SOW WITH UPDATED CDRL INFORMATION. |
| Aug 14, 2025 | P00013 | $655.9K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FULL AND EQUITABLE ADJUSTMENT IN THE AMOUNT OF $655,863.00 FOR THE SWRI PROPOSAL NUMBER 19-97929C DATED MAY 21, 2025 AND UPDATE CLAUSE GSFC 52.211-101 LIST OF ATTACHMENTS (NOV 2022). |
| Jul 2, 2025 | P00012 | $499.7K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING $499,657.00 TO SUPPORT PHASE B EFFORT THROUGH 11/1/2025. |
| Jun 12, 2025 | P00011 | $905 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE CONTRACT FUNDING FROM MOD 9 THAT INCORRECTLY CAPTURED THE ESTIMATED COST AND AVAILABLE FIXED FEE AMOUNTS BY $904.94. |
| Apr 30, 2025 | P00010 | $0 | REMOVAL OF CLAUSES/DRDS IAW (EO 14148, 14057, 14173 AND 14168] - JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) PHASE B EFFORT FOR SCIENCE MISSION DIRECTORATE |
| Apr 3, 2025 | P00009 | $5.1M | EXERCISE OPTION FOR JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) PHASE B EFFORT. |
| Feb 25, 2025 | P00008 | $0 | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING. NCE |
| Feb 19, 2025 | P00007 | $0 | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING. |
| Feb 12, 2025 | P00006 | $446.3K | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING. |
| Jan 23, 2025 | P00005 | $0 | REMOVAL OF CLAUSES/DRDS IAW EO 14035-JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING. |
| Jan 13, 2025 | P00004 | $446.1K | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING. |
| Dec 10, 2024 | P00003 | $446.1K | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING. |
| Nov 25, 2024 | P00002 | $714.7K | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING. |
| Nov 19, 2024 | P00001 | $0 | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING. |
| Aug 29, 2024 | 0 | $1.2M | JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING. |
Estimated positioning window
Jun 1, 2027 – Dec 1, 2027
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2028-06-01 (578 days from calculation)
- +25 points
- 32 historical awards in this buyer and category group
- +15 points
- 25 recorded award transactions
- +10 points
- Latest award action: 2026-07-23
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.