Federal contract award

80GSFC25CA034

STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSCAJ13 — GENERAL SCIENCE & TECHNOLOGY R&D SVCS; GENERAL SCIENCE & TECHNOLOGY; EXPERIMENTAL DEVELOPMENT
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeCOST PLUS AWARD FEE
Obligations$121.8M
Current contract value$1.1B
Potential contract value / ceiling$1.1B
Start dateApr 9, 2025
Current end dateApr 8, 2030
Potential end dateApr 8, 2030
Latest award activityAug 18, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 30 of 30 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 18, 2026P00028$9.4MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Aug 18, 2026P00029$-25.2KSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Jul 16, 2026P00027$-5.2KSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Jul 15, 2026P00026$8.0MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Jun 16, 2026P00025$7.1MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Jun 8, 2026P00024$0STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Jun 2, 2026P00023$0STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
May 19, 2026P00022$8.7MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Apr 16, 2026P00020$0STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Apr 16, 2026P00021$6.5MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Apr 9, 2026P00019$-47.7KSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Mar 11, 2026P00018$5.7MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Feb 17, 2026P00017$5.2MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Dec 15, 2025P00015$3.0MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Nov 20, 2025P00014$8.3MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Sep 25, 2025P00013$0STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Sep 19, 2025P00011$5.0MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Sep 19, 2025P00012$133.3KSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Sep 18, 2025P00010$8.0MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Aug 20, 2025P00009$4.8MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Jul 23, 2025P00008$9.0MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Jun 17, 2025P00007$9.0MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Jun 5, 2025P00006$0UPDATE CLAUSES IAW PCD 21-01B
May 20, 2025P00005$7.0MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
May 6, 2025P00004$5.2MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
May 1, 2025P00003$0REMOVAL OF CLAUSES IAW PCD 25-01, CLASS DEVIATION FROM FAR REGARDING E.O. 14173 AND E.O. 14168 AND PCD 25-02, CLASS DEVIATION FROM FAR REGARDING E.O. 14148 AND E.O. 14057
Feb 7, 2025P00002$0STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Jan 24, 2025P00001$0REMOVAL OF CLAUSES/DRDS IAW EO 14148-DEVELOPMENT,FABRICATION, INTEGRATION, TESTING, VERIFICATION, OPERATIONS OF SPACE FLIGHT, AIRBORNE, GROUND SYSTEM HARDWARE, AND DEVELOPMENT/VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE /SCIENCE MISSIONS.
Jan 13, 2025P00016$7.1MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
Jan 8, 20250$5.0MSTUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.

Estimated positioning window

Apr 8, 2029 – Oct 8, 2029

Recompete signal:
45/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 45/100. Available recorded signals: 40 points.

Contract end 2030-04-08 (1261 days from calculation)
+5 points
2 historical awards in this buyer and category group
+10 points
30 recorded award transactions
+10 points
Latest award action: 2026-08-18
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceFeb 18, 2025
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceFeb 18, 2025
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceFeb 18, 2025
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceFeb 18, 2025
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceMay 17, 2023
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceMay 17, 2023
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceMay 12, 2023
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceMay 12, 2023
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceApr 20, 2023
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceApr 20, 2023
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceMar 20, 2023
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceMar 20, 2023
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceJan 13, 2023
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceJan 13, 2023
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceJan 12, 2023
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceJan 12, 2023
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceJan 3, 2023
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceJan 3, 2023
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceDec 19, 2022
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceDec 19, 2022
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceNov 21, 2022
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceNov 21, 2022
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceOct 27, 2022
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceOct 27, 2022
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceAug 16, 2022
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceAug 16, 2022
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceJan 4, 2022
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceJan 4, 2022
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceNov 18, 2021
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceNov 18, 2021
Shani L. SmithContactshani.l.smith@nasa.gov
301-286-7213
SourceNov 18, 2021
Pauline BarrettContactsislyn.p.barrett@nasa.gov
3012863294
SourceNov 18, 2021

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.