Federal contract award

80KSC018C0024

FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA KENNEDY SPACE CENTER
NAICS236210 — Industrial Building Construction
PSCZ2NZ — REPAIR OR ALTERATION OF OTHER UTILITIES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$73.0M
Current contract value$73.0M
Potential contract value / ceiling$73.0M
Start dateAug 30, 2018
Current end dateDec 15, 2026
Potential end dateDec 15, 2026
Latest award activityJun 11, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 107 of 107 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 11, 2026P00106$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Feb 19, 2026P00105$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Oct 17, 2025P00104$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Sep 17, 2025P00103$474.4KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Aug 25, 2025P00102$41.0KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Jul 7, 2025P00101$166.9KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Jun 24, 2025P00100$33.5KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Mar 14, 2025P00099$22.2KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Mar 3, 2025P00098$8.1KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Feb 20, 2025P00097$6.2KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Feb 12, 2025P00096$68.0KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Feb 10, 2025P00095$30.0KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Jan 13, 2025P00094$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Nov 26, 2024P00093$111.3KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. EVOLUTION VALVE DIFFERING SITE CONDITION.
Nov 21, 2024P00092$23.0KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Oct 31, 2024P00091$2.7MFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Sep 30, 2024P00090$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Sep 18, 2024P00089$17.5KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Sep 12, 2024P00088$28.9KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Aug 9, 2024P00087$-312.8KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Jul 30, 2024P00086$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL.
Jul 19, 2024P00085$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL.
Jul 5, 2024P00084$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. EXTENDS PERIOD OF PERFORMANCE.
Jun 21, 2024P00083$4.4KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Jun 20, 2024P00082$349.8KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
Jun 4, 2024P00081$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. TIME EXTENSION TO NEGOTIATION FINAL CHANGES.
Feb 28, 2024P00080$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL INCORPORATED AGREED DOWN DAYS OMITTED IN TN-097 $0.0 PRICE CHANGE.
Jan 31, 2024P00079$2.5MFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MODIFICATION INCORPORATE TN-097 REPLACE AND COAT HYDROGEN VENT LINE PIPING IN THE AMOUNT OF $2,470,199.00
Jan 22, 2024P00078$40.5KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. THIS MODIFICATION INCORPORATED TRACKING NUMBER 098 REPLACE VALVE EXPANSION JOINTS IN THE AMOUNT OF $40,517
Dec 18, 2023P00077$757.7KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. THE MODIFICATION INCORPORATES TRACKING NUMBER (TN)-096 DEMOLISH VENT LINE PIPING IN THE INCREASED AMOUNT TO THE CONTRACT OF $797,742.00
Dec 6, 2023P00076$478.6KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. INCORPORATE TRACKING NUMBER (TN)-095 PIPING MATERIAL IN THE AMOUNT OF $478,555.00
Nov 21, 2023P00075$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. REVISED CONTRACT COMPLETION DATE TO ADDRESS PENDING TN NO INCREASE.
Oct 27, 2023P00074$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. INCORPORATE TIME EXTENSION TO ADDRESS PUNCH LIST AND CLOSEOUT IN THE AMOUNT OF $0.0
Sep 8, 2023P00073$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MOD 73: EXTEND THE COMPLETION DATE 49 DAYS, THEREBY EXTENDING THE DATE FROM SEPTEMBER 8, 2023 TO OCTOBER 27, 2023.
Aug 25, 2023P00072$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MOD 72: EXTEND THE COMPLETION DATE 12 DAYS, THEREBY EXTENDING THE DATE FROM AUGUST 27,2023 TO SEPTEMBER 8, 2023.
Aug 10, 2023P00071$0FABRICATION AND CONSTRUCTION TO UPGRADE LIQUID HYDROGEN (LH2) SYSTEM FOR LAUNCH COMPLEX 39B MOD 71: EXTEND THE CURRENT CONTRACT COMPLETION DATE BY 16 CALENDAR DAYS, THEREBY EXTENDING THE DATE FROM AUGUST 11, 2023 TO AUGUST 27, 2023.
Jul 26, 2023P00070$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. EXTEND THE PERIOD OF PERFORMANCE 24 CALENDAR DAYS TO AUGUST 11, 2023.
Jul 6, 2023P00069$12.2KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MODIFICATION TO INCORPORATED TRACKING NUMBER (TN)-094 CABLE ENTRY FITTINGS IN AMOUNT OF $12,212.00
Jun 28, 2023P00068$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MOD 68: REMOVE CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (DEVIATION 21-03).
Jun 23, 2023P00067$2.9KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MOD 67: INCORPORATED TRACKING NUMBER (TN)-093 REPLACE RECEPTACLES IN THE AMOUNT OF $2,862
Jun 21, 2023P00066$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL INCORPORATE CLAUSE 52.204-27 AS PER OFFICE OF MANAGEMENT AND BUDGET (OMB) MEMORANDUM M-23-13.
Apr 26, 2023P00065$184.6KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. INCORPORATE TRACKING NUMBER (TN)091 & 80, EXTEND PERIOD OF PERFORMANCE VALVE DELAY. INCREASE CONTRACT VALUE AND FUNDING.
Apr 19, 2023P00064$33.2KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B. INCORPORATE TRACKING NUMBER 092 LH2 VENT LINES RELOCATE CHECK VALVES IMPLEMENTATION IN THE AMOUNT OF $33,177. THE COMPLETION DATE IS CHANGED TO APRIL 26, 2023.
Apr 6, 2023P00063$6.6KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. INCORPORATE TRACKING NUMBER (TN)-092 MATERIAL IN THE AMOUNT INCREASE OF $6,646
Apr 4, 2023P00062$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. EXTENDS COMPLETION DATE TO APRIL 20, 023 TO ALLOW EVALUATION OF PENDING TRACKING NUMBERS CURRENTLY IN REVIEW AND NEGOTIATIONS.
Mar 21, 2023P00061$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. TIME EXTENSION TO RESOLVE PENDING TN'S $0.0 INCREASE
Mar 8, 2023P00060$6.2KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. INCORPORATED TRACKING NUMBER 90, ADDITIONAL VALVE CONTROL, IN THE AMOUNT OF $6,158.
Mar 6, 2023P00059$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. TIME EXTENSION TO MARCH 21, 2023, TO ALLOW EVALUATION OF PENDING TRACKING NUMBERS CURRENTLY IN REVIEW.
Feb 17, 2023P00058$1.3MFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER. INCORPORATED REQUEST FOR EQUITABLE ADJUSTMENTS (REAS), AN INCREASE OF $1,256,993.00, AND CONTRACT COMPLETION DATE IS CHANGED TO MARCH 06, 2023
Feb 16, 2023P00057$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. TIME EXTENSION TO ADDRESS PENDING TRACKING NUMBERS AND REQUEST FOR EQUITABLE ADJUSTMENT NO INCREASE TO COST.
Jan 31, 2023P00056$16.4KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. INCORPORATE TN-056 REPLACE VALVES INCREASED BY $16,424.
Dec 20, 2022P00055$5.4KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MOD 55:INCORPORATE TRACKING NUMBER (TN) 088 MOVE CAMERA PEDESTAL 4 ADD BOLLARD AND (TN)-089 RFI-354 REMOVE AND RELOCATE CHECK AND VENT VALVES
Nov 2, 2022P00054$8.6KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MODIFICATION TO INCORPORATE CHANGES INCREASING AWARD PRICE $8,552.
Aug 29, 2022P00053$14.1KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MOD 53: INCORPORATE TRACKING NUMBER (TN)-085 ADD GAUGE PANEL A600865 AND SPLIT PIPE SUPPORT. CONTRACT INCREASE $14,118
Aug 4, 2022P00052$456.6KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MOD 52: INCORPORATES TRACKING NUMBER (TN)-081 VAPORIZER PIPE REDESIGN IN AMOUNT OF 456,637
Jul 27, 2022P00051$8.6KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MODIFICATION TO INCORPORATE TRACKING NUMBER (TN) 083 AND TN-084 FOR AN ADDITIONAL $8,558.00.
Jun 30, 2022P00050$140.9KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B. INCORPORATES TRACKING NUMBER-082 LOWER LH2 TANK FILL MANIFOLD FOR AN INCREASE OF $140,908.
Jun 7, 2022P00049$674.2KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B. MODIFICATION INCORPORATES TRACKING NUMBER 080 LH2 TRANSFER LINE TEE REVISIONS, AND DEVIATION WAIVERS (DW) -023 HELIUM GRADE, AND DW-035 VACUUM RETENTION TEST.
May 4, 2022P00048$4.4KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B. INCORPORATES TRACKING NUMBER 074, RAISE CABLE TRAY IN EE BUILDING (ATTACHMENT 1)FOR $4,417.00.
Apr 19, 2022P00047$16.2KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MOD 47: INCORPORATES TRACKING NUMBER (TN)-077 ARTEMIS I SCHEDULE SLIP AND FIRE ALARM WORK REALIGNMENT AND EXTENDS PERIOD OF PERFORMANCE.
Apr 12, 2022P00046$176.8KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B KENNEDY SPACE CENTER. MOD 46: INCORPORATES TRACKING NUMBERS (TN) TN-075, TN-076 AND TN-078 FOR TIME AND NEGOTIATED AMOUNT.
Apr 1, 2022P00045$48.3KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B KENNEDY SPACE CENTER. MOD 45: INCORPORATES TRACKING NUMBER (TN)067 AND 069 DIFFERING SITE CONDITION AND USER REQUIREMENT.
Mar 16, 2022P00044$11.6KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MOD 44: INCORPORATES TRACKING NUMBERS (TN)-072, GPS POWER CONNECTIONS AND (TN)-073, INCREASED LENGTH OF CABLES.
Mar 4, 2022P00043$72.4KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B. MOD 43: INCORPORATE TRACKING NUMBER (TN)-066 ARTEMIS LAUNCH ADJUST AND DEVIATION WAVIER (DW)-032 BELLOW REMOVAL. COMPLETION DATE IS ALSO CHANGED.
Mar 2, 2022P00042$2.6KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MOD 42: INCORPORATE TRACKING NUMBER (TN)-068 ENCLOSURE SUPPORTS. FUNDING AND VALUES ARE INCREASED.
Feb 15, 2022P00041$30.3KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. INCORPORATES TRACKING NUMBER -070, PROVIDE ALUMINUM WELD SAMPLES PERFORMED BY OTHERS, FOR $30,288.00.
Dec 1, 2021P00040$4.5KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. INCORPORATES TRACKING NUMBER -064 NO COST MODIFICATION OF CLIP SIZES DESIGN CORRECTION.
Nov 19, 2021P00039$238FABRICATION AND CONSTRUCTION TO UPGRADE LIQUID HYDROGEN (LH2) SYSTEM FOR LAUNCH COMPLEX 39B MOD 39: INCORPORATE TRACKING NUMBER (TN)-065 PROPANE PANEL RELIEF VALVES INTO CONTRACT.
Nov 8, 2021P00038$0EO14042 FABRICATION AND CONSTRUCTION TO UPGRADE LIQUID HYDROGEN (LH2) SYSTEM FOR LAUNCH COMPLEX 39B MOD 38: INCORPORATES CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS. (DEVIATION 21-03)
Oct 15, 2021P00037$12.9KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER MOD 37: INCORPORATES TRACKING NUMBERS (TN)-062 AND (TN)-063 MODIFICATIONS DUE TO REQUEST FOR INFORMATION (RFI) RESPONSES AND DESIGN CORRECTIONS
Aug 30, 2021P00036$7.8KFABRICATION AND CONSTRUCTION TO UPGRADE LIQUID HYDROGEN (LH2) SYSTEM FOR LAUNCH COMPLEX 39B. MODIFICATION INCORPORATES TRACKING NUMBER -061 FOR $7,780.00.
Jul 28, 2021P00035$5.9KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MOD 35: INCORPORATES TRACKING NUMBER (TN)-058
Jul 23, 2021P00034$42.4KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER. MOD 34: INCORPORATES TRACKING NUMBERS (TN)'S 056, 059, AND 060. FUNDING AND VALUES ARE INCREASED.
Jul 1, 2021P00033$2.7KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, MOD 33: INCORPORATES TRACKING NUMBER (TN)-57. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Jun 9, 2021P00032$3.4KFABRICATION AND CONSTRUCTION TO UPGRADE LIQUID HYDROGEN (LH2) SYSTEM FOR LAUNCH COMPLEX 39B MOD 32: INCORPORATES TRACKING NUMBER (TN) -055 HOSE REEL AND EMERGENCY SHOW ABOVE GRADE ISOLATION VALVES RFI-300.
May 24, 2021P00031$7.1KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. INCORPORATES TRACKING NUMBER (TN)-053 AND TN-054 FOR $7,148.00. PERIOD OF PERFORMANCE REMAIN UNCHANGED.
May 12, 2021P00030$21.3KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. INCORPORATES TRACKING NUMBER (TN) -052 CABLE TRAY MODIFICATION FOR A $21,343.00 INCREASE.
May 3, 2021P00029$12.5KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MODIFICATION INCORPORATES TRACKING NUMBER-051, ADDITIONAL BOLLARDS, FOR AN ADDITIONAL $12,467.00
Apr 15, 2021P00028$21.1KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MOD 28: INCORPORATES TRACKING NUMBER( TN)-050 TRACKING AND FUNDING IS INCREASED. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Apr 12, 2021P00027$6.0KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B. INCORPORATE TRACKING NUMBER (TN)-048 AND -049 FOR $5,963,REQUEST FOR INFORMATION 278 AND 280, AND DEVIATION WAIVERS 028 AND 029.
Mar 16, 2021P00026$58.3KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B. INCORPORATES TRACKING NUMBER-047 FOR $58,281 AND EXTENDS CONTRACT COMPLETION DATE TO MARCH 16, 2022.
Mar 12, 2021P00025$8.0KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B. MODIFICATION TO INCORPORATE TRACKING NUMBER-044 FOR $7,968. FIRM FIXED PRICE, IS HEREBY CHANGED FROM $62,127,011.00 TO $62,134,979.00
Feb 26, 2021P00024$31.1KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. INCORPORATES TRACKING NUMBER (TN) 045 AND 046 FOR AN INCREASE OF $31,101.
Feb 19, 2021P00023$719.4KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B. MODIFICATION TO INCORPORATE TRACKING NUMBER-041 AND 042. FIRM FIXED PRICE IS INCREASED $719,400 AND COMPLETION DATE IS CHANGED TO JANUARY 10, 2022.
Jan 7, 2021P00022$77.8KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MOD 22: INCORPORATES TRACKING NUMBER TN-039 CABLE TRAY GROUND AND SUPPORT AND TN-043 FIRE ALARM CABLE ROUTE
Dec 9, 2020P00021$267.5KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. INCORPORATES TRACKING NUMBER 036 AND 037 FOR $267,534.00. THE EQUIPMENT WILL BE TURNED OVER TO GOVERNMENT AT END OF USE AS NEGOTIATED.
Oct 19, 2020P00020$7.9KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MODIFICATION TO INCORPORATE TRACKING NUMBERS (TN)-034 AND TN-038. AS A RESULT OVERALL AWARD IS INCREASED $7,851.00.
Sep 24, 2020P00019$108.3KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MOD INCORPORATES TRACKING NUMBER-033 AND DEVIATION WAIVER (DW)-025 AND DW-026 FOR $108,321. THE PERIOD OF PERFORMANCE IS REVISED TO 10/12/2021.
Aug 3, 2020P00018$3.3KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN SYSTEM AT LAUNCH COMPLEX 39B. MOD 18: INCORPORATES TRACKING NUMBER (TN) 031 TN-031 CHANGE FILTER/REGULATOR COMPONENT A603424 AND ASSOCIATED PRESSURE GAUGE RFI-223 FOR THE TIME AND AMOUNT OF $3265.00
Jun 23, 2020P00017$23.5KFABRICATION AND CONSTRUCTION TO UPGRADE LIQUID HYDROGEN (LH2) SYSTEM FOR LAUNCH COMPLEX 39B. MODIFICATION INCORPORATES TRACKING NUMBERS 29, 030,032 AND DEVIATION WAIVER 024 IN THE AMOUNT OF $23,485.00. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
May 12, 2020P00016$44.4KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MODIFICATION INCORPORATES TRACKING NUMBER (TN) 027 FOR $44,446.00. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Apr 23, 2020P00015$4.0KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL TN-28 MOD 15: THIS MODIFICATION INCORPORATES TRACKING NUMBER #028 IN THE AMOUNT OF $4008.00. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Feb 26, 2020P00014$10.7KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B. MODIFICATION INCORPORATES TRACKING NUMBER (TN)-25 AND TN-26. FIRM FIXED PRICE INCREASED $10,654 AND COMPLETION DATE EXTENDED 14 DAYS TO SEPTEMBER 8, 2021.
Dec 18, 2019P00013$32.0KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MOD 13: THIS MODIFICATION CHANGES COMPONENTS FOR A FILTER, ADDS ANNULUS CRYOGENIC PIPING MOD. OBLIGATION AND VALUE IS INCREASED BY $32,044.00.
Nov 26, 2019P00012$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MODIFICATION TO CHANGE APPROPRIATION DATA SET FORTH IN BASE CONTRACT, INCORPORATE DW'S 016 AND 019 AND INCORPORATE TN 022. AS A RESULT FIRM FIXED PRICE REMAINS UNCHANGED AT $60,797,14.00.
Oct 29, 2019P00011$67.9KFABRICATION&CONSTRUCTION OF LIQUID HYDROGEN (LH2) MOD 11: ADD TRACKING NUMBER 019/CHARPY TEST FOR ANNULUS PIPING FOR $100,253.00 AND CREDIT TRACKING NUMBER 021/HEX TOWER SUPPORT FOR -$32,386.00. PRICE IS INCREASED BY $67,867.00.
Sep 30, 2019P00010$1.8KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. THE PURPOSE OF THIS MODIFICATION IS TO ADD TN'S 015 AND 020 IN THE AMOUNT OF $1,789.00. AS A RESULT OF THIS MODIFICATION, SECTION B, PARAGRAPH B.2 - NFS 1852.216-78 FIRM FIXED PRICE, IS HEREBY CHANGED FROM $60,727,458.00 TO $60,729,247.00.
Sep 10, 2019P00009$54.7KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MOD 9: A. THE PURPOSE OF THIS MODIFICATION IS TO ADD TN'S 014 AND 017 AS FOLLOWS: 1) TN 014/RFI 125/EO 10/VALE ACCESS STAIR REQUIREMENTS (ATTACH 1), IN THE AMOUNT OF $12,652.00. 2) TN 017/EO 03/GROUNDING WIRE REVISIONS (ATTACH 2), IN THE AMOUNT OF $42,043.00. B. AS A RESULT OF THIS MODIFICATION, SECTION B, PARA B.2 - NFS 1852.216-78 FIRM FIXED PRICE, IS HEREBY CHANGED FROM $60,672,763.00 TO $60,727,458.00 AN INCREASE OF $54,695.00. C. STATEMENT OF RELEASE - IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENTS FOR THE NEGOTIATED TN 014 AND 017 CHANGES, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THESE CHANGES.
Aug 16, 2019P00008$29.7KMOD 8: THE PURPOSE OF THIS MODIFICATION IS TO ADD TASK NUMBERS (TN'S) AS FOLLOWS: TN 007: ADD FILTER REGULATOR, IN THE AMOUNT OF $3,640.00. TN 009: VACUUM SENSOR VALVE CHANGES, IN THE AMOUNT OF $17,291.00. TN 010: FIRE SUPPRESSION BRANCH CONNECTION DETAIL CHANGES, IN THE AMOUNT OF $0.00. TN 011: VPP BOX SUPPORT, IN THE AMOUNT OF $1,882.00. TN 012: EMI FILTER ROTATION, IN THE AMOUNT OF $316.00. TN 013: OPEN-CUT REPAIR FOR ACCESS DRIVE TO CAMERA PAD, IN THE AMOUNT OF $6,557.00. TN 016: REVISION OF KGCS CABLE SCHEDULE&RACK LOCATION, IN THE AMOUNT OF $0.00. TN 018: VAPORIZER PAD CONCRETE SLOPE, IN THE AMOUNT OF $0.00. AS A RESULT OF THIS MODIFICATION, SECTION B, PARAGRAPH B.2- NFS 1852.216-78 FIRM FIXED PRICE, IS HEREBY CHANGED FROM $60,643,077.00 TO $60,672,763.00 AN INCREASE OF $29,686.00.
Jul 17, 2019P00007$162.7KFABRICATION AND CONSTRUCTION TO UPGRADE LIQUID HYDROGEN (LH2) SYSTEM FOR LAUNCH COMPLEX 39B MOD 7: A. THE PURPOSE OF THIS MODIFICATION IS TO ADD DWS 007, 008, 010, 011&012, ADD TN 04 AND EXTEND THE PERIOD OF PERFORMANCE AS FOLLOWS: 1) DW 007/EPOXY EMBEDS, IN THE AMOUNT OF $0.00. 2) DW 008/PANEL WELDS, IN THE AMOUNT OF $0.00. 3) DW 010/ROUNDED ROD, IN THE AMOUNT OF $0.00. 4) DW 011/ONE PIECE VALVE, IN THE AMOUNT OF $0.00. 5) DW 012/VJ SHOP HYDRO, IN THE AMOUNT OF $0.00. 6) TN 04/RFI 020/LH2 SPHERE ANNULUS EVACUATION SYSTEM, IN THE AMOUNT OF $162,729.00. 7) AS A RESULT OF TN 04, SECTION F, PARAGRAPH F.1, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, IS HEREBY CHANGED TO REVISE THE PERIOD OF PERFORMANCE AS FOLLOWS: THE PERIOD OF PERFORMANCE IS EXTENDED FROM AUGUST 23, 2021 TO AUGUST 25, 2021. B. AS A RESULT OF THIS MODIFICATION, SECTION B, PARAGRAPH B.2 - NFS 1852.216-78 FIRM FIXED PRICE, IS HEREBY CHANGED FROM $60,480,348.00 TO $60,643,077.00 AN INCREASE OF $162,729.00.
Jul 9, 2019P00006$28.7KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL. MOD 6: THE PURPOSE OF THIS MODIFICATION IS TO ADD THE FOLLOWING TN'S (TECHNICAL NUMBERS) 1. 005, 006, AND 008, PNEUMATIC PANEL MODS, IN THE AMOUNT OF $17,373.00. 2. TN 006, TUBING, IN THE AMOUNT OF $9,451.00, AND TN 008, BUILDING DOOR HEIGHT CHANGE, IN THE AMOUNT OF $1,886.00 FOR A TOTAL AMOUNT OF $28,710.00. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
May 9, 2019P00005$32.0KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MOD 5: THE PURPOSE OF THIS MODIFICATION IS TO ADD TN 003-RFI 029, 064, 094&105 RESOLVE GROUNDING AND BONDING DESIGN ISSUES (ATTACHMENT 1), IN THE AMOUNT OF $32,038.00. AS A RESULT OF THIS MODIFICATION, SECTION B, PARAGRAPH B.2 - NFS 1852.216-78 FIRM FIXED PRICE, IS HEREBY CHANGED FROM $60,419,600.00 TO $60,451,638.00 AN INCREASE OF $32,038.00.
Apr 15, 2019P00004$69.8KFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MOD 4: A. THE PURPOSE OF THIS MODIFICATION IS TO ADD DW'S 005, 006 AND 009 AND TN 02 AS FOLLOWS: 1) DW 005/CHANNEL C4 7.25 (ATTACHMENT 1), IS HEREBY ADDED IN THE AMOUNT OF $0.00. 2) DW 006/CONCRETE RETARDANT (ATTACHMENT 2), IS HEREBY ADDED IN THE AMOUNT OF $0.00. 3) DW 009/TEST CYLINDERS (ATTACHMENT 3), IS HEREBY ADDED IN THE AMOUNT OF $0.00. 4) TN 02/RFI 040/LH2 FLOW VALVES - CHANGE MANUAL VJ VALVES TO Y-PATTERN FLOW PATH (ATTACHMENT 4), IS HEREBY ADDED IN THE AMOUNT OF $69,790.00. B. AS A RESULT OF THIS MODIFICATION, SECTION B, PARAGRAPH B.2 - NFS 1852.216-78 FIRM FIXED PRICE, IS HEREBY CHANGED FROM $60,349,810.00 TO $60,419,600.00 AN INCREASE OF $69,790.00. C. STATEMENT OF RELEASE IT IS HEREBY AGREED THAT THE EQUITABLE ADJUSTMENTS AGREED TO HEREIN FOR TN 02 CONSTITUTES AN ACCORD AND FULLY SATISFIES ANY AND ALL CLAIMS AGAINST THE GOVERNMENT ARISING OUT OF, OR RELATED TO, THE CHANGES SPECIFIED IN THIS SUPPLEMENTAL AGREEMENT.
Mar 8, 2019P00003$78.8KFABRICATION AND CONSTRUCTION TO UPGRADE LIQUID HYDROGEN (LH2) SYSTEM FOR LAUNCH COMPLEX 39B MOD 3: A. THE PURPOSE OF THIS MODIFICATION IS TO ADD TN 01 AND EXTEND THE PERIOD OF PERFORMANCE AS FOLLOWS: 1) TN 01 IMPACTS FROM GOVERNMENT SHUTDOWN, IN THE AMOUNT OF $78,810.00. 2) AS A RESULT OF THE GOVERNMENT SHUTDOWN ON DECEMBER 22, 2018, SECTION F, PARAGRAPH F.1, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, IS HEREBY CHANGED TO REVISE THE PERIOD OF PERFORMANCE AS FOLLOWS: THE PERIOD OF PERFORMANCE IS EXTENDED FROM JULY 16, 2021 TO AUGUST 23, 2021. B. AS A RESULT OF THIS MODIFICATION, THE TOTAL CONTRACT VALUE WILL INCREASE FROM $60,271,000.00 TO $60,349,810.00 AN INCREASE OF $78,810.00.
Mar 4, 2019P00002$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MOD 2: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DW'S 003&004 AND MODIFY SECTION E INSPECTION AND ACCEPTANCE AS FOLLOWS: 1. DW 003/24, RCP IN LIEU OF 21, IS HEREBY ADDED IN THE AMOUNT OF $0.00 (SEE ATTACHMENT 1). AS A RESULT OF THIS MODIFICATION, THE TOTAL CONTRACT VALUE REMAINS UNCHANGED AT $60,271,000.00.
Nov 30, 2018P00001$0FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL MOD 1: A THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH THE PERIOD OF PERFORMANCE END DATE, INCORPORATE THE APPROVED SITE SPECIFIC SAFETY AND HEALTH PLAN AND INCORPORATE DW 001 AS FOLLOWS: 1. SECTION F, PARAGRAPH F.1, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, IS HEREBY CHANGED TO ESTABLISH A PERIOD OF PERFORMANCE COMPLETION DATE AS FOLLOWS: "IN ACCORDANCE WITH THE NOTICE TO PROCEED, THE PERIOD OF PERFORMANCE END DATE IS JULY 16, 2021." 2. SECTION J, PARAGRAPH J.1.A.F, SAFETY AND OCCUPATIONAL HEALTH PLAN, IS HEREBY CHANGED TO INCORPORATE THE APPROVED SITE SPECIFIC SAFETY PLAN (SEE ATTACHMENT 1). 3. DW 001/MAJOR EQUIPMENT SUBMITTALS, IS HEREBY ADDED IN THE AMOUNT OF $0.00 (SEE ATTACHMENT 2). B. AS A RESULT OF THIS MODIFICATION, THE TOTAL CONTRACT VALUE REMAINS UNCHANGED AT $60,271,000.00. C. STATEMENT OF RELEASE IT IS HEREBY AGREED THAT THE EQUITABLE ADJUSTMENTS AGREED TO HEREIN CONSTITUTES AN ACCORD AND FULLY SATISFIES ANY AND ALL CLAIMS AGAINST THE GOVERNMENT ARISING OUT OF, OR RELATED TO, THE CHANGES SPECIFIED IN THIS SUPPLEMENTAL AGREEMENT.
Aug 30, 20180$60.3MFABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2026-12-15 (51 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
107 recorded award transactions
+10 points
Latest award action: 2026-06-11
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.