Federal contract award
80KSC019C0007
ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA KENNEDY SPACE CENTER |
| NAICS | 236210 — Industrial Building Construction |
| PSC | Y1EZ — CONSTRUCTION OF OTHER INDUSTRIAL BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $39.4M |
| Current contract value | $39.4M |
| Potential contract value / ceiling | $39.4M |
| Start date | Apr 15, 2019 |
| Current end date | Apr 30, 2026 |
| Potential end date | Apr 30, 2026 |
| Latest award activity | Apr 10, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 118 of 118 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 10, 2026 | P00117 | $20.8K | ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). |
| Feb 20, 2026 | P00116 | $0 | ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). |
| Nov 17, 2025 | P00115 | $0 | ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). |
| Jul 2, 2025 | P00114 | $500.5K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) |
| Jun 4, 2025 | P00113 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS), AT THE KENNEDY SPACE CENTER, FLORIDA. |
| Apr 8, 2025 | P00112 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS), AT THE KENNEDY SPACE CENTER, FLORIDA. |
| Jan 30, 2025 | P00111 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) |
| Dec 19, 2024 | P00110 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) |
| Dec 10, 2024 | P00109 | $3.6K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) |
| Nov 22, 2024 | P00108 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) |
| Nov 8, 2024 | P00107 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) |
| Sep 27, 2024 | P00105 | $120.7K | ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). INCORPORATE TECHNICAL NARRATIVES 148 AND 149 INTO THE CONTRACT. |
| Sep 27, 2024 | P00106 | $654.6K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATE REQUEST FOR EQUITABLE ADJUSTMENT 018 INTO THE CONTRACT. |
| Sep 24, 2024 | P00104 | $31.8K | ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). AWARD OF REQUEST FOR EQUITABLE ADJUSTMENT 020 FOR ADDITIONAL SUPPORT OF TECHNICAL NARRATIVE 110. |
| Sep 12, 2024 | P00103 | $88.8K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MOD 103: INCORPORATES TECHNICAL NARRATIVES (TN)-144 AND (TN)-147A INTO THE CONTRACT |
| Sep 9, 2024 | P00102 | $24.1K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATE TECHNICAL NARRATIVES 141 INTO THE CONTRACT. |
| Aug 16, 2024 | P00101 | $8.6K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATE TECHNICAL NARRATIVES (TNS) 145 AND 146 INTO THE CONTRACT. |
| Aug 13, 2024 | P00100 | $-79.3K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). DEFINITIZE UNDEFINITIZED CONTRACT ACTION (UCA) FOR TRACKING NUMBER 130A. |
| Jul 30, 2024 | P00099 | $13.6K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). |
| Jul 22, 2024 | P00098 | $12.8K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). |
| Jul 11, 2024 | P00097 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). THE CURRENT CONTRACT COMPLETION DATE IS CHANGED FROM JULY 14, 2024 TO JULY 31, 2024. |
| Jul 3, 2024 | P00096 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATE FAR 52.204-30 ALTERNATE I, FEDERAL ACQUISITION SUPPLY CHAIN ACT ORDERS-PROHIBITION (DEC 2023) |
| Jun 27, 2024 | P00094 | $13.1K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATE TRACKING NUMBER'S 138 AND 140 |
| Jun 27, 2024 | P00095 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). THE CURRENT CONTRACT COMPLETION DATE IS CHANGED FROM JUNE 28, 2024 TO JULY 14, 2024, |
| Jun 25, 2024 | P00093 | $47.6K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATE THE FOLLOWING TECHNICAL NARRATIVE (TN) 137, ADDITIONAL SPARE INSTRUMENTS. |
| Jun 18, 2024 | P00092 | $30.4K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). TECHNICAL NARRATIVE (TN) 134, DUCT ISOLATION VALVE WASHERS |
| May 13, 2024 | P00091 | $352.1K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATE TECHNICAL NARRATIVE 128, ECS REPAIRS OVERHEAD. |
| Apr 25, 2024 | P00090 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). EXTEND PERIOD OF PERFORMANCE. |
| Apr 24, 2024 | P00089 | $396.7K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATES TRACKING NUMBERS AND REQUEST FOR EQUITABLE ADJUSTMENT. |
| Mar 20, 2024 | P00088 | $350.0K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATES TRACKING NUMBER 130-A, RE-PIPE HUMIDIFIERS, INTO SUBJECT CONTRACT. |
| Mar 18, 2024 | P00087 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). EXTEND VAB ECS PERIOD OF PERFORMANCE. |
| Mar 8, 2024 | P00086 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION TO INCORPORATE TIME EXTENSION TO RESOLVE PENDING TECHNICAL NOTICES AND REQUEST FOR EQUITABLE ADJUSTMENTS. $0.0 INCREASE |
| Feb 23, 2024 | P00085 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). NO COST MODIFICATION TO INCORPORATE TIME EXTENSION TO RESOLVE PENDING TRACKING NUMBERS, AND REQUEST FOR EQUITABLE ADJUSTMENT'S (REA). |
| Feb 15, 2024 | P00084 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION EXTENDS COMPLETION DATE TO FEBRUARY 26, 2024. |
| Feb 8, 2024 | P00083 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 83: INCORPORATE TIME EXTENSION TO RESOLVE PENDING TN'S, REA'S. $0.0 INCREASE |
| Jan 31, 2024 | P00082 | $96.4K | INSTALL ECS VAB HIGH BAY 3_INCORPORATE CHANGES FOR TRACKING NUMBER TN-110 RFI-257, REA-016 RESCINDED TN-121A, AND REA-017 SURGE PANEL PROGRAMING THE TOTAL AMOUNT OF $96,424 |
| Jan 23, 2024 | P00081 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATE TIME EXTENSION TO RESOLVE PENDING TECHNICAL NOTICES, REQUEST FOR EQUITABLE ADJUSTMENTS AND ALLOW FOR PROPOSAL NEGOTIATIONS. |
| Jan 10, 2024 | P00080 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). TIME EXTENSION TO 1/25/2024, TO RESOLVE PENDING TECHNICAL NOTICES, REQUEST FOR EQUITABLE ADJUSTMENTS AND ALLOW FOR PROPOSAL NEGOTIATIONS. |
| Dec 18, 2023 | P00079 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MOD 79: INCORPORATE TIME EXTENSION TO RESOLVE PENDING TRACKING NUMBERS (TN)'S AND REQUEST FOR EQUITABLE ADJUSTMENT (REA)'S. |
| Dec 14, 2023 | P00078 | $148.5K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MOD 78: INCORPORATE REQUEST FOR EQUITABLE ADJUSTMENT REA-003 NEW TRAINING REQUIREMENTS IN THE SETTLED AMOUNT OF $148,500 |
| Dec 11, 2023 | P00077 | $11.0K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MOD 77: INCORPORATE CHANGES FOR TRACKING NUMBER (TN) RFI-265 OUTLET BOXES AND (TN)-133 DRAIN PIPING TAGS THE TOTAL AMOUNT OF $11,027 |
| Nov 16, 2023 | P00076 | $0 | INSTALL ECS VAB HB MODIFICATION TO INCORPORATE TIME EXTENSION TO RESOLVE PENDING TN'S, REA'S. $0.0 INCREASE |
| Oct 25, 2023 | P00075 | $24.4K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MOD 75: INCORPORATE CHANGES FOR TRACKING NUMBER (TN)126A BOILER RELIEF VALVE PIPING AND TN-127 LADDER MODS IN THE TOTAL AMOUNT OF $24,399 |
| Oct 16, 2023 | P00074 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). NO COST TIME EXTENSION TO RESOLVE PENDING TECHNICAL NOTICES, REQUESTS FOR EQUITABLE ADJUSTMENTS AND ALLOW FOR PROPOSAL NEGOTIATIONS. |
| Sep 27, 2023 | P00073 | $12.7K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATE TRACKING NUMBER 125 FOR $12,653. NUMBER 125 HEATER CONTROLS LIMITATIONS IN THE AMOUNT OF $12,653. |
| Sep 18, 2023 | P00072 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). TIME EXTENSION TO RESOLVE PENDING TRACKING NUMBERS, REQUEST FOR EQUITABLE ADJUSTMENTS AND ALLOW FOR PROPOSAL NEGOTIATIONS. |
| Sep 13, 2023 | P00071 | $181.0K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATE CHANGES FOR TRACKING NUMBER 119 ECS REPAIRS IN THE AMOUNT OF $181,035. |
| Sep 1, 2023 | P00070 | $3.2K | ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).MOD 70: INCORPORATE CHANGES FOR TRACKING NUMBER (TN)-123 IN THE AMOUNT OF $3,174. |
| Aug 25, 2023 | P00069 | $9.5K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 70: INCORPORATE CHANGES FOR TRACKING NUMBER 120 AND 122 IN THE AMOUNT OF $9,482 |
| Aug 17, 2023 | P00068 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION TO INCORPORATE TIME EXTENSION TO SEPTEMBER 18,2023. RESOLVE PENDING TN'S AND REA. $0.0 INCREASE |
| Aug 7, 2023 | P00067 | $14.7K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 67: INCORPORATE CHANGES FOR TRACKING NUMBER 115, REQUEST FOR EQUITABLE ADJUSTMENT-015 IN THE AMOUNT OF $14,702. CONTRACT COMPLETION DATE IS EXTENDED. |
| Aug 3, 2023 | P00066 | $45.5K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS)_INCORPORATE CHANGES FOR TRACKING NUMBERS 113 AND 118. |
| Jul 6, 2023 | P00065 | $31.7K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 65: INCORPORATE TRACKING NUMBER (TN) REWIRE FIVE ADDITIONAL SCR PANELS IN THE AMOUNT OF $31,739. |
| Jun 28, 2023 | P00064 | $116.4K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 64: INCORPORATE TRACKING NUMBER (TN)-111 STRATIX SWITCHES IN THE AMOUNT OF $116,383. |
| Jun 22, 2023 | P00063 | $8.5K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION INCORPORATES TRACKING NUMBER (TN) 096, 116 AND REQUEST FOR INFORMATION 239 TN-116 AMOUNT OF $8,452. |
| Jun 12, 2023 | P00062 | $45.7K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MOD 62: INCORPORATE TRACKING NUMBERS (TN)-099, 104, 109 AND 114 IN THE AMOUNT OF $45,678 |
| Jun 8, 2023 | P00061 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATES FAR 52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENT (APR 2008). |
| May 31, 2023 | P00060 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MOD 60: INCORPORATE TIME EXTENSION TO RESOLVE PENDING TRACKING NUMBERS (TN)'S AND REASONABLE EQUITABLE ADJUSTMENT (REA) |
| May 24, 2023 | P00059 | $104.8K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MOD 59: INCORPORATE TRACKING NUMBERS (TN)'S AND REQUEST FOR EQUITABLE ADJUSTMENT (REA) 005,008,012, 013, 014, AND TN-112 IN THE AMOUNT OF $104,760.00 |
| May 9, 2023 | P00058 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). COMPLETION DATE CHANGED TO MAY 31, 2023 TO RESOLVE PENDING TECHNICAL NOTICES, REQUEST FOR EQUITABLE ADJUSTMENTS, AND ALLOW FOR PROPOSAL NEGOTIATIONS. |
| May 1, 2023 | P00057 | $194.9K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MODIFICATION TO INCORPORATE TRACKING NUMBERS (TN)'S 107 AND 108 REQUEST FOR EQUITABLE ADJUSTMENT(REA) 010 AND 011. FUNDING AND CONTRACT VALUES INCREASED. |
| Apr 21, 2023 | P00056 | $0 | ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). MODIFICATION TO INCORPORATE TIME EXTENSION TO RESOLVE PENDING TRACKING NUMBERS AND REQUEST FOR EQUITABLE ADJUSTMENTS. $0.0 INCREASE |
| Mar 21, 2023 | P00055 | $0 | ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). MODIFICATION TO INCORPORATE. TIME EXTENSION TO RESOLVE PENDING TRACKING NUMBERS AND REQUEST FOR EQUITABLE ADJUSTMENTS. $0.0 INCREASE |
| Feb 28, 2023 | P00054 | $21.5K | ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). MODIFICATION TO INCORPORATE TRACKING NUMBERS (TN)'S TN-100, TN-102, TN-105, AND TN-106 TOTAL INCREASE IN THE AMOUNT OF $21,475. |
| Feb 15, 2023 | P00053 | $19.2K | ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).INSTALL MODIFICATION TO INCORPORATE. REQUEST FOR EQUITABLE ADJUSTMENTS 009 REFRIGERANT INCREASE IN THE AMOUNT OF $19,182 |
| Feb 10, 2023 | P00052 | $100.8K | INSTALL ECS VAB HB-3 MODIFICATION TO INCROP. TN-098 ADDITIONAL CLP, TN-101 SANITARY DRAIN, AND REA-007 GLYCOL INCREASE TOTAL $100,752 |
| Jan 6, 2023 | P00051 | $89.3K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY (HB)3 ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATES TRACKING NUMBERS 0092, 097 AND REQUEST FOR EQUITABLE ADJUSTMENT 006 FOR $89,322. COMPLETION DATE IS CHANGED TO MARCH 24, 2023. |
| Nov 17, 2022 | P00050 | $404.6K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY(HB)3 ENVIRONMENTAL CONTROL SYSTEM (ECS). MOD 50: INCORPORATES TRACKING NUMBER (TN)093, 094, AND 095. FOR A TOTAL INCREASE OF $404,602, AND EXTENDS THE ENDING PERIOD OF PERFORMANCE. |
| Oct 19, 2022 | P00049 | $305.5K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY(HB)3 ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATES TRACKING NUMBER (TN) 087 FOR $305,465.00. CONTRACT COMPLETION DATE IS CHANGED TO DECEMBER 30, 2022. |
| Aug 26, 2022 | P00048 | $12.0K | ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). INSTALL ECS HB 3 VAB, MODIFICATION INCORPORATES TN-090 LOGAN FENCE POST AND TN-091 ADD TO PRV TOWER MAKE UP. CONTRACT INCREASE $12,007 |
| Aug 9, 2022 | P00047 | $57.2K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY(HB)3 ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATES TRACKING NUMBER (TN) 083 HUMIDIFIER ACTUATOR CIRCUITS AND TN-089 COOLING TOWER VALVES. CONTRACT INCREASE OF $57,201 |
| Aug 1, 2022 | P00046 | $13.2K | INSTALL ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). MODIFICATION INCORPORATES TRACKING NUMBER (TN) 086 INSTALL RESET LCD ENCLOSURE AND TN-088 THIRD FLOR LIGHT REMOVAL. CONTRACT INCREASED $13,193. |
| Jul 27, 2022 | P00045 | $11.9K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY(HB)3 ENVIRONMENTAL CONTROL SYSTEM (ECS). MOD 45: ICORPORATES TRACKING NUMBERS (TN)-084 AC-23 POWER SUPPLY TOGGLE SWITCH AND (TN)-085 CONTROL ROOM PENETRATIONS |
| May 19, 2022 | P00044 | $5.5K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY(HB)3 ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION TO INCORPORATE TRACKING NUMBER (TN) -080A TN-082 FOR AN ADDITIONAL $5,535.00. |
| May 11, 2022 | P00043 | $1.2M | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION TO INCORPORATE TRACKING NUMBERS (TN)-078 THROUGH 081 FOR AN ADDITIONAL $1,246,000 AND EXTENDS COMPLETION DATE TO NOVEMBER 5, 2022. |
| Apr 15, 2022 | P00042 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 42: CONTRACT COMPLETION DATE IS CHANGED TO 5-16-22 AT NO COST TO EITHER PARTY. SETTLES PENDING TECHNICAL NOTICES AND ALLOW FOR PROPOSAL NEGOTIATIONS. |
| Feb 9, 2022 | P00041 | $9.0K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 41: INCORPORATED TRACKING NUMBER (TN)-077 FIRE SUPPRESSION FLOW SWITCH REMOVAL DUE TO DIFFERING SITE CONDITION |
| Feb 4, 2022 | P00040 | $35.4K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 40: INCORPORATE TRACKING NUMBERS (TN)-074 DESIGN CORRECTION AND (TN)-076 ADDITIONAL PRODUCT DETAIL IMPACTS AND TYPE MODIFICATIONS. |
| Jan 20, 2022 | P00039 | $11.8K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 39: INCORPORATE MODIFICATION RESULTANT OF TRACKING NUMBER (TN)-075 STRATIX SWITCH DESIGN ENHANCEMENT. |
| Dec 28, 2021 | P00038 | $933.8K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 38: INCORPORATE TRACKING NUMBER'S (TN)'S 059A, 062, 068, 070, AND 073 DUE TO SITE CONDITIONS, AND TO EXTEND TIME DUE TO PROJECTED LAUNCH DELAY. |
| Dec 20, 2021 | P00037 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 37: INCORPORATE TIME EXTENSION TO RESOLVE PENDING TECHNICAL NOTICE CHANGES TN-062, TN-059A, AND TN-073. |
| Nov 19, 2021 | P00036 | $54.1K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATE TRACKING NUMBER -072 FOR AN ADDITIONAL $54,141. |
| Nov 8, 2021 | P00035 | $100.7K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 35: INCORPORATES TRACKING NUMBER (TN)-063 AND 067 BASED ON DESCOPE AND DESIGN CORRECTIONS. |
| Oct 26, 2021 | P00034 | $7.7K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MOD 34: INCORPORATED TRACKING NUMBER (TN)-069 TO ADD LIQUID CRYSTAL DISPLAY (LCD) ENCLOSURE FANS DUE TO DESIGN CORRECTION. |
| Oct 20, 2021 | P00033 | $17.7K | COVID INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MOD 33: INCORPORATED TRACKING NUMBER(S) TN-056A, TN-065, TN-066, AND TN-071 DIFFERING SITE CONDITIONS, AND DESIGN CORRECTIONS. |
| Oct 19, 2021 | P00032 | $0 | EO14042 INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MOD 32: INCORPORATE FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS. |
| Aug 17, 2021 | P00031 | $38.9K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATES REQUEST FOR EQUITABLE ADJUSTMENT 004 AND TRACKING NUMBERS 061 AND 064 FOR AN ADDITIONAL $38,867.00. |
| Jul 1, 2021 | P00030 | $8.2K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 30: INCORPORATES TRACKING NUMBER (TN)-060, THIRD FLOOR BARRIER. FUNDING AND VALUES ARE INCREASED. |
| Jun 24, 2021 | P00029 | $33.7K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB 3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 29: INCORPORATES TRACKING NUMBER (TN) 052, CLARIFICATION ON BEACON'S ALARMS. FUNDING AND VALUES ARE INCREASED. |
| Jun 7, 2021 | P00028 | $26.9K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION INCORPORATES TRACKING NUMBERS 057 AND 058 FOR A TOTAL INCREASE OF $26,863.00. |
| May 11, 2021 | P00027 | $23.3K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 27: INCORPORATES TRACKING NUMBERS (TN)S 051, 053, AND 054A INTO THE CONTRACT. FUNDING AND VALUES ARE INCREASED. |
| Apr 6, 2021 | P00026 | $15.9K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY 3 (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATES TRACKING NUMBER (TN) 050, INCREASING TOTAL VALUE $15,859.00 TO $32,150,335.00. |
| Mar 31, 2021 | P00025 | $453.3K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATES TRACKING NUMBER 042, REPLACE HEATERS AND CHAMBERS, FOR AN ADDITIONAL $453,251. |
| Mar 19, 2021 | P00024 | $352.5K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS)MOD 24: INCORPORATES TRACKING NUMBER (TN)S 039, 347A, 048, AND 049 HEREBY INCREASING CONTRACT VALUE AND FUNDING. |
| Mar 10, 2021 | P00023 | $8.5K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 23: INCORPORATES THE REQUEST FOR EQUITABLE ADJUSTMENT (REA) DUE TO HUMIDIFICATION REDESIGN INTO THE CONTRACT |
| Mar 5, 2021 | P00022 | $101.8K | ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). MOD 22: INCORPORATES TRACKING NUMBER (TN)-024 MISC. CHANGES DUE TO DIFFERING SITE CONDITIONS, DESIGN CORRECTIONS, AND ENHANCEMENTS. |
| Feb 23, 2021 | P00021 | $25.0K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 21: INCORPORATES TRACKING NUMBER (TN)-0134, UPDATE HUMIDIFICATION CHAMBERS. FUNDING AND VALUE IS INCREASED. |
| Jan 28, 2021 | P00019 | $2.2M | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). INCORPORATE THE TRACKING NUMBER (TN)S 017, INCREASING TOTAL CONTRACT VALUE $2,170,091.00. CONTRACT COMPLETION DATE CHANGES TO FEBRUARY 22, 2022. |
| Jan 28, 2021 | P00020 | $1.1M | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 20: INCORPORATES TRACKING NUMBERS (TN)'S - 018 AND 0143 ACCELERATE PHASE 2 CONSTRUCTION SCHEDULE FIRE ALARM AND LINE CHANGE. |
| Dec 15, 2020 | P00018 | $42.2K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION TO INCORPORATE TRACKING NUMBER (TN)-041, -045, AND -046, INCREASING CONTRACT VALUE $42,193 TO $27,922,199. |
| Nov 13, 2020 | P00017 | $69.0K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION INCORPORATES TRACKING NUMBERS -037,-038, AND -044 MODIFICATIONS. TOTAL VALUE INCREASES $69,048 TO $27,880,006. |
| Nov 3, 2020 | P00016 | $88.1K | INCORPORATED TN-031 AND TN-035 MODIFICATIONS |
| Oct 19, 2020 | P00015 | $17.9K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION INCORPORATES TRACKING NUMBERS (TN)-030,-032,-036, AND TN-040. TOTAL CONTRACT VALUE INCREASED $17,853.00. |
| Sep 25, 2020 | P00014 | $20.8K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION INCORPORATES TRACKING NUMBER-029. TOTAL CONTRACT VALUE INCREASES $20,803. |
| Sep 21, 2020 | P00013 | $8.1K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 13: INCORPORATES THE REQUEST FOR EQUITABLE ADJUSTMENT DUE TO RADIOGRAPHIC WELD INSPECTION TESTING DELAY. CONTRACT VALUE AND FUNDING ARE INCREASED. |
| Sep 17, 2020 | P00012 | $20.2K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 12: INCORPORATES CHANGES TO TRACKING NUMBER-026 "UPDATE DESIGN DETAILS". AS A RESULT, FUNDING AND CONTRACT VALUE IS INCREASED. |
| Aug 6, 2020 | P00011 | $2.3K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 11: INCORPORATES TRACKING NUMBER (TN) -028, NEW FLEX ADAPTER, THE CONTRACT VALUE WILL INCREASE BY $2341. |
| Jul 16, 2020 | P00010 | $34.9K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION INCORPORATES TRACKING NUMBERS 020,-025, AND -027. TOTAL VALUE IS INCREASED $34,888 TO $27,653,644. |
| Jun 26, 2020 | P00009 | $11.1K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION INCORPORATES DEVIATION WAIVER 007 AND TRACKING NUMBER 023 FOR $11,135.00. ALL OTHER ITEMS REMAIN THE SAME. |
| May 21, 2020 | P00008 | $116.5K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 8: THIS MODIFICATION INCORPORATES TRACKING NUMBERS (TN)016, 019,AND 021. THE TOTAL CONTRACT VALUE AND FUNDING IS INCREASED. |
| Apr 29, 2020 | P00007 | $41.2K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 7: THIS MODIFICATION INCORPORATES TRACKING NUMBER (TN) 012, 022, AND DEVIATION WAIVER (DW) 13. |
| Mar 10, 2020 | P00006 | $172.8K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION INCORPORATES TRACKING NUMBERS 009-011,AND 013-015. TOTAL CONTRACT VALUE INCREASED $172,799. ALL OTHER ITEMS REMAIN THE SAME. |
| Jan 21, 2020 | P00005 | $19.0K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS). MODIFICATION INCORPORATES TRACKING NUMBER 006. TOTAL CONTRACT VALUE INCREASES $18,967 TO $27,277,129. ALL OTHER ITEMS REMAIN THE SAME. |
| Jan 8, 2020 | P00004 | $248.8K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 4: THIS MODIFICATION INCORPORATES TRACKING NUMBER 001, 007, AND 008. AS A RESULT THE TOTAL CONTRACT VALUE WILL INCREASE BY $248,790.00. |
| Oct 25, 2019 | P00003 | $25.1K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MODIFICATION TO INCORPORATE TN-003,004, AND 005. CONTRACT TOTAL VALUE INCREASE IS $25,081. DW-001,002,003 AND 004 ARE ALSO INCORPORATED. |
| Sep 26, 2019 | P00002 | $5.6K | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 2: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE TRACKING NUMBER (TN) 2, RELOCATION OF 1 INCH CONDUIT RESULTING IN AN INCREASE OF $5,611.00 AND CHANGING THE COMPLETION DATE TO 2/9/21. |
| Jun 5, 2019 | P00001 | $0 | INSTALL VEHICLE ASSEMBLY BUILDING (VAB) HIGH BAY THREE (HB-3) ENVIRONMENTAL CONTROL SYSTEM (ECS) MOD 1: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ESTABLISHED CONTRACT COMPLETION DATE AND INCORPORATE THE SITE SPECIFIC SAFETY&HEALTH PLAN. AS A RESULT OF THIS MODIFICATION: A. THE SITE SPECIFIC SAFETY&HEALTH PLAN APPROVED MAY 30, 2019 IS INCORPORATED AS ATTACHMENT 1 OF THIS MODIFICATION. B. THE CONTRACT COMPLETION DATE IS ESTABLISHED AT FEBRUARY 1, 2021 IAW THE NOTICE TO PROCEED LETTER ISSUED ON APRIL 30, 2019. C. CHANGE IN CONTRACT PRICE: $0 |
| Apr 15, 2019 | 0 | $27.0M | ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). |