Federal contract award

80KSC019C0013

DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA KENNEDY SPACE CENTER
NAICS236210 — Industrial Building Construction
PSCAR15 — SPACE R&D SVCS; SPACE FLIGHT, RESEARCH & SUPPORTING ACTIVITIES; R&D FACILITIES & MAJ EQUIP
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS AWARD FEE
Obligations$1.5B
Current contract value$1.6B
Potential contract value / ceiling$1.6B
Start dateJul 1, 2019
Current end dateJun 5, 2026
Potential end dateJun 5, 2026
Latest award activityAug 20, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 182 of 182 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 20, 2026P00181$-9.8MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
May 6, 2026P00180$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Mar 2, 2026P00179$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Feb 10, 2026P00178$33.8MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Jan 23, 2026P00177$42.0MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Dec 18, 2025P00176$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Nov 19, 2025P00175$98.0MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Nov 5, 2025P00174$5.0MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Oct 30, 2025P00173$7.5MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Oct 16, 2025P00172$15.0MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Sep 30, 2025P00171$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Sep 25, 2025P00170$29.1MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Sep 16, 2025P00169$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Jul 24, 2025P00167$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Jul 24, 2025P00168$13.5MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Jul 2, 2025P00166$23.0MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Jun 27, 2025P00164$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Jun 27, 2025P00165$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
May 28, 2025P00163$26.5MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
May 14, 2025P00162$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Apr 28, 2025P00160$35.5MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Apr 28, 2025P00161$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Apr 18, 2025P00159$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Apr 16, 2025P00158$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Mar 31, 2025P00157$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Mar 28, 2025P00156$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 156: ADMINISTRATIVE MODIFICATION TO UPDATE ATTACHMENT J-13, AWARD FEE EVALUATION PLAN (AFEP) AREAS OF EMPHASIS (AOES)
Mar 27, 2025P00155$22.6MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). P00155: ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $22,600,000.
Mar 26, 2025P00154$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Jan 31, 2025P00153$74.0MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Dec 20, 2024P00152$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Dec 18, 2024P00151$48.4MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Dec 11, 2024P00150$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 142: INCORPORATES REVISIONS TO FAR 52.225-11, BUY AMERICAN - CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS.
Nov 8, 2024P00149$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 149: INCORPORATES AWARD FEE PERIOD (AFP) 11 RESULTS.
Oct 25, 2024P00148$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Oct 16, 2024P00147$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Sep 30, 2024P00146$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). P00146: UPDATES ATTACHMENT, J-13, AWARD FEE EVALUATION PLAN (AFEP), WITH THE TWELFTH AWARD FEE PERIOD AREAS OF EMPHASIS (AOES).
Sep 24, 2024P00145$1.2MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). P00145: ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $1,200,000.
Sep 19, 2024P00144$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 142: INCORPORATES UPDATED SECTION J, ATTACHMENT J-1, STATEMENT OF WORK (SOW).
Sep 17, 2024P00143$27.0MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). P00143: ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $27,000,000.
Sep 11, 2024P00142$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 142: INCORPORATES REVISIONS TO FAR 52.225-11, BUY AMERICAN - CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS AND ADDS ADDITIONAL LANGUAGE INTO CONTRACT ATTACHMENT J-18, MINOR AGREEMENTS.
Sep 4, 2024P00141$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 141: INCORPORATES TRENDS 1009, 1002, 981, 924, 890, 886, 864, 850.
Aug 9, 2024P00140$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 140: INCORPORATES TRENDS 0777, 0840, 0848, 0849, 0851, 0881, 0883, 0915, 0934, 0980, 1050.
Jul 25, 2024P00139$43.6MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). P00139: ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $43,618,909.
Jun 6, 2024P00138$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). P00138: UPDATES THE LANGUAGE IN DATA REQUIREMENT DELIVERABLE (DRD) 1.0-5 TO INCORPORATE AN OPERATING PLAN REQUIREMENT.
Jun 4, 2024P00137$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). P00137: UPDATES THE LANGUAGE IN DATA REQUIREMENT DELIVERABLE (DRD) 1.0-5 TO INCORPORATE AN OPERATING PLAN.
May 2, 2024P00136$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATE RESULTS OF AWARD FEE PERIOD 10
Apr 18, 2024P00135$75.0MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). P00135: ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $75,000,000.
Apr 16, 2024P00134$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). P00134: UPDATES LANGUAGE CONTAINED IN ATTACHMENT J-1, STATEMENT OF WORK.
Mar 29, 2024P00133$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). P00133: INCORPORATES PERIOD 11 AREAS OF EMPHASIS (AOE'S).
Mar 25, 2024P00132$22.0MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 132 - INCREMENTALLY FUNDS CONTRACT IN THE AMOUNT OF $22,000,000. FUNDED THROUGH JUNE 30, 2024.
Mar 20, 2024P00130$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 130: INCORPORATES THE MOST CURRENT J-10 ATTACHMENT INTO THE CONTRACT.
Mar 20, 2024P00131$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). AWARD FEE RESTRUCTURE TO INCENTIVIZE EARLY DELIVERY.
Feb 26, 2024P00129$20.3MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 129: ADDS INCREMENTAL FUNDING TO FUND CONTRACTOR PERFORMANCE THROUGH MAY 20, 2024.
Feb 23, 2024P00128$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 128: INCORPORATES TREND 0765.
Feb 15, 2024P00127$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADMINISTRATIVE CHANGES TO ATTACHMENT J-1 AND J-7.
Jan 30, 2024P00126$22.0MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 126: ADDS INCREMENTAL FUNDING TO FUND CONTRACTOR PERFORMANCE THROUGH APRIL 30, 2024.
Dec 12, 2023P00125$27.8MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 125: ADDS INCREMENTAL FUNDING TO FUND CONTRACTOR PERFORMANCE THROUGH MARCH 31, 2024.
Nov 16, 2023P00124$47.9MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 122: ADDS INCREMENTAL FUNDING TO FUND CONTRACTOR PERFORMANCE THROUGH MARCH 1, 2024
Nov 15, 2023P00123$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). ADMINISTRATIVE MODIFICATION TO UPDATE SECTION B, TABLE B.3 - AWARD FEE TABLE.
Oct 12, 2023P00122$35.8MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 122: ADDS INCREMENTAL FUNDING TO FUND CONTRACTOR PERFORMANCE THROUGH DECEMBER 8, 2023
Sep 29, 2023P00120$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). UPDATES ATTACHMENT, J-13, AWARD FEE EVALUATION PLAN (AFEP), WITH THE TENTH AWARD FEE PERIOD AREAS OF EMPHASIS (AOES).
Sep 29, 2023P00121$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 121: EXTEND FUNDED THROUGH DATE NOVEMBER 3, 2023 AND UPDATE CONTRACT ATTACHMENT J-12. COST AND FUNDING SCHEDULES, IS HEREBY REPLACED IN ITS ENTIRETY
Sep 22, 2023P00118$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MODIFICATION P00118: INCORPORATES TREND 00647. THE TOTAL COST OF THE SUBJECT CONTRACT REMAINS UNCHANGED.
Sep 22, 2023P00119$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 119: INCORPORATES TREND 0795.
Aug 24, 2023P00117$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 117: INCORPORATE TREND 0741. TOTAL COST AND AVAILABLE AWARD FEES ARE HEREBY INCREASED.
Aug 8, 2023P00116$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 116: INCORPORATE TRENDS 0658. TOTAL COST AND AVAILABLE AWARD FEES ARE HEREBY DECREASED.
Jul 20, 2023P00115$36.5MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 115: ADDS INCREMENTAL FUNDING TO FUND CONTRACTOR PERFORMANCE THROUGH OCTOBER 18, 2023
Jul 14, 2023P00114$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 114: INCORPORATE TRENDS 0842
Jun 26, 2023P00112$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 112: INCORPORATE ADMINISTRATIVE CHANGES TO SECTION I, ATTACHMENT J-3, DATA REQUIREMENT DOCUMENTS (DRD) 1.0-5 AND 1.0-6.
Jun 26, 2023P00113$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 113: INCORPORATES TRENDS 00764, 00773, 00796, 00797, 00808, AND 00822.
Jun 9, 2023P00110$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADMINISTRATIVE CHANGES SECTION I, ATTACHMENT J-1, J-7, AND J-16.
Jun 9, 2023P00111$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TREND 00779 AND THE REVISED ATTACHMENT J-1, STATEMENT OF WORK (SOW).
Jun 8, 2023P00109$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TREND 00776 AND THE REVISED STATEMENT OF WORK.
May 31, 2023P00107$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD INCORPORATES ADMINISTRATIVE CHANGES TO SECTION I.
May 31, 2023P00108$21.0MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES INCREMENTAL FUNDING IN THE AMOUNT OF $21M. COST AND FUNDING SCHEDULES, IS APPROPRIATELY UPDATED AND IS ATTACHED TO THIS MODIFICATION.
May 10, 2023P00106$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). UPDATES SECTION B, TABLE B.3 - AWARD FEE TABLE.
Apr 27, 2023P00105$100.2MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 105: PROVIDED INCREMENTAL FUNDING SUFFICIENT FOR PERFORMANCE THROUGH 9/15/23
Apr 26, 2023P00104$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADMINISTRATIVE CHANGES TO STATEMENT OF WORK.
Apr 20, 2023P00103$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). CORRECTS ADMINISTRATIVE ERRORS BETWEEN MODIFICATIONS P00084 AND P00089 ON THE ATTACHMENT J-13, AWARD FEE EVALUATION PLAN (AFEP).
Apr 19, 2023P00102$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TREND 00700.
Apr 13, 2023P00101$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADMINISTRATIVE CHANGES SECTION I (SUBCONTRACTS) AND SECTION J (SMALL BUSINESS SUBCONTRACTING PLAN).
Mar 31, 2023P00100$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). UPDATES ATTACHMENT, J-13, AWARD FEE EVALUATION PLAN (AFEP), WITH THE NINTH AWARD FEE PERIOD AREAS OF EMPHASIS (AOES).
Mar 29, 2023P00099$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TREND 00191. THE TOTAL COST OF THE SUBJECT CONTRACT REMAINS UNCHANGED.
Mar 21, 2023P00098$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TRENDS 00490, 00733 AND 00742. TOTAL CONTRACT VALUE IS INCREASED AND PERIOD OF PERFORMANCE REMAINS UNCHANGED.
Mar 2, 2023P00095$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADMINISTRATIVE CHANGES TO THE CONTRACT CLAUSE, FAR 52.225-11.
Mar 2, 2023P00096$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADMINISTRATIVE CHANGES TO ATTACHMENT J-1, ATTACHMENT J-6, AND ATTACHMENT J-18.
Mar 2, 2023P00097$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TREND 00757 AND TREND 00772. CHANGES ARE EFFECTIVE IMMEDIATELY AND THE PERIOD OF PERFORMANCE REMAINS UNCHANGED.
Feb 13, 2023P00094$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES ADMINISTRATIVE CHANGES TO SECTION B, TABLE B.3, AWARD FEE.
Feb 9, 2023P00093$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES REVISIONS TO DATA REQUIREMENTS DOCUMENT (DRD) 1.0-8, FIXED PRICE PROPOSAL.
Jan 27, 2023P00091$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TREND 00728 IN THE AMOUNT OF $68,466 AND ADMINISTRATIVELY REVISE THE AMOUNT IN ATTACHMENT J-12, COST AND FUNDING SCHEDULE.
Jan 27, 2023P00092$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 92: INCORPORATES TREND 00721 IN THE AMOUNT OF ($57,149).
Jan 20, 2023P00090$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES REVISIONS TO ATTACHMENT J-3, KSC PROJECT-SPECIFIC REQUIREMENTS AND ATTACHMENT J-19, SMALL BUSINESS SUBCONTRACTING PLAN
Jan 6, 2023P00089$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). UPDATES ATTACHMENT, J-13, AWARD FEE EVALUATION PLAN (AFEP), WITH THE REVISED EIGHTH AWARD FEE PERIOD AREAS OF EMPHASIS (AOES).
Dec 20, 2022P00088$95.0MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES INCREMENTAL FUNDING IN THE AMOUNT OF $95M. ATTACHMENT J-12, COST AND FUNDING SCHEDULES, IS APPROPRIATELY UPDATED AND IS ATTACHED TO THIS MODIFICATION.
Nov 23, 2022P00087$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TREND 00506, 00667,00728 FOR A TOTAL COST INCREASE OF $560,133.
Nov 22, 2022P00086$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). UPDATES SECTION B, TABLE B.3 - AWARD FEE TABLE.
Nov 18, 2022P00085$49.0MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). ADDS INCREMENTAL FUNDING AND ADMINISTRATIVELY CORRECT THE TABLE FOR P00078 FUNDING, ALL OTHER TERMS AND CONDITIONS OF THE SUBJECT CONTRACT REMAIN UNCHANGED.
Nov 17, 2022P00084$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). UPDATES ATTACHMENT, J-13, AWARD FEE EVALUATION PLAN (AFEP), WITH THE EIGHTH AWARD FEE PERIOD AREAS OF EMPHASIS (AOES).
Nov 15, 2022P00083$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADMINISTRATIVE CHANGES TO THE CONTRACT CLAUSE, FAR 52.225-11.
Nov 4, 2022P00081$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD INCORPORATES ADMINISTRATIVE CHANGES TO THE ATTACHMENT J-22, QUALIFICATION-CRITICALITY CLASSIFICATION MATRIX.
Nov 4, 2022P00082$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TREND 00493 FOR A TOTAL COST INCREASE OF $439,018.
Oct 17, 2022P00080$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD INCORPORATES ADMINISTRATIVE CHANGES. REPLACEMENT PAGES ARE ATTACHED AND SHOULD BE APPROPRIATELY INSERTED INTO COPIES OF THE CONTRACT.
Oct 13, 2022P00079$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD INCORPORATES ADMINISTRATIVE CHANGES. REPLACEMENT PAGES ARE ATTACHED AND SHOULD BE APPROPRIATELY INSERTED INTO COPIES OF THE CONTRACT.
Oct 7, 2022P00077$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TRENDS 00522 AND 00537. THE TOTAL COST OF THE SUBJECT CONTRACT REMAINS UNCHANGED.
Oct 7, 2022P00078$7.0MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $7,000,000. ATTACHMENT J-12, COST AND FUNDING SCHEDULES, IS APPROPRIATELY UPDATED AND ATTACHED.
Oct 6, 2022P00076$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TRENDS 00515, 00587, 00629, 00640 AND 00642.
Sep 23, 2022P00075$10.0MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). ADDS INCREMENTAL FUNDING, ALL OTHER TERMS AND CONDITIONS OF THE SUBJECT CONTRACT REMAIN UNCHANGED.
Sep 15, 2022P00074$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 74: INCORPORATES TREND 00150. THE TOTAL COST OF THE SUBJECT CONTRACT REMAINS UNCHANGED.
Sep 8, 2022P00073$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TREND 00627 AND THE REVISED STATEMENT OF WORK. THE TOTAL COST OF THE SUBJECT CONTRACT REMAINS UNCHANGED.
Sep 1, 2022P00069$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 69: INCORPORATES TRENDS 00485, 00510, AND 00525. THE TOTAL COST OF THE SUBJECT CONTRACT REMAINS UNCHANGED.
Sep 1, 2022P00070$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TRENDS 00492 AND 00500. THESE CHANGES ARE EFFECTIVE IMMEDIATELY AND THE PERIOD OF PERFORMANCE REMAINS UNCHANGED.
Sep 1, 2022P00071$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 71: INCORPORATES TREND 00494.THE TOTAL COST OF THE SUBJECT CONTRACT REMAINS UNCHANGED
Sep 1, 2022P00072$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD INCORPORATES ADMINISTRATIVE CHANGES TO ATTACHMENT J-16, ADVANCED AGREEMENT 01, LIVING AWAY FROM HOME OPTION (LAFHO).
Aug 26, 2022P00068$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES INTERIM ESTIMATE AT COMPLETE (IEAC), INCREASES VALUE, AND EXTENDS PERIOD OF PERFORMANCE TO 05/18/2026.
Jul 18, 2022P00067$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). UPDATSE AWARD FEE EVALUATION PLAN (AFEP), WITH THE UPDATED SEVENTH AWARD FEE PERIOD AREAS OF EMPHASIS (AOES).
Jul 7, 2022P00066$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TRENDS 00524, 00589, 00634 AND 00638 FOR A TOTAL COST INCREASE OF $110,463.
Jun 30, 2022P00065$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TRENDS 00489 AND 00499 FOR A TOTAL COST INCREASE OF $611,697.
Jun 27, 2022P00064$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TREND 00668 PYRO RACK DIRECT CURRENT FIRING CIRCUIT SPARES FOR A TOTAL COST INCREASE OF $271,656.
Jun 15, 2022P00063$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES REVISED AND UPDATED PROPOSAL FOR COVID-19 IMPACTS AND COSTS, INCREASES VALUE, AND EXTENDS PERIOD OF PERFORMANCE TO 05/29/2024.
Jun 3, 2022P00062$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). UPDATES SECTION B, TABLE B.3 - AWARD FEE CHART.
May 17, 2022P00061$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TRENDS 00458, TOTAL COST DECREASE OF $414,909. REPLACEMENT PAGES ARE ATTACHED AND SHOULD BE APPROPRIATELY INSERTED INTO COPIES OF THE CONTRACT.
May 12, 2022P00060$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TRENDS 00192 AND 00491 FOR A TOTAL COST INCREASE OF $604,839.
May 4, 2022P00058$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 58: INCORPORATES PROPOSAL 2, APPENDIX B, 124 TRENDED CHANGES, INCREASING COST $27,248,340.00. PERIOD OF PERFORMANCE REMAINS UNCHANGED.
May 4, 2022P00059$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). UPDATES SECTION F CLAUSE F.6 UPDATES ATTACHMENT J-13, AWARD FEE EVALUATION PLAN AND UPDATES J-18, EXCEPTIONS AND MINOR AGREEMENTS.
May 2, 2022P00057$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TREND 00156, INCREASING COST $2,132,121.00. PERIOD OF PERFORMANCE REMAINS UNCHANGED.
Apr 25, 2022P00056$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 56: UPDATES AWARD FEE EVALUATION PLAN (AFEP) WITH THE SEVENTH AWARD FEE PERIOD AREAS OF EMPHASIS. (AOES)
Apr 21, 2022P00055$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TRENDS AND MULTIPLE UPDATES FOR A TOTAL COST INCREASE OF $590,042.
Mar 30, 2022P00054$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 54:INCORPORATES TREND, 00111, ADDITIONAL PANEL REQUIREMENTS CAUSING ADDITIONAL E-ROOM. TOTAL COST OF CONTRACT IS INCREASED.
Mar 24, 2022P00053$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES TRENDS 00112, 00126, 00127, 00159 AND 00175. VALUE IS INCREASED, ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Mar 22, 2022P00052$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD INCORPORATES ADMINISTRATIVE CHANGES. REPLACEMENT PAGES ARE ATTACHED AND SHOULD BE APPROPRIATELY INSERTED INTO COPIES OF THE CONTRACT.
Mar 1, 2022P00051$25.0MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES MOBILE LAUNCHER 2 RE-PLAN SCOPING DOCUMENT RESPONSE, INCREASES VALUE, FUNDING, AND EXTENDS PERIOD OF PERFORMANCE TO 01/21/2024.
Jan 21, 2022P00050$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).MOD 50: INCORPORATE REVISED ATTACHMENT J-1, STATEMENT OF WORK AND ATTACHMENT J-10, CODE OF RECORD.
Jan 6, 2022P00049$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATE TRENDS, 00145, COMPUTER EQUIPMENT TO SUPPORT RECENTLY STAFFED PERSONNEL 00174, BLUEBEAM LICENSES AND 00189, COVID-19 PREVENTION IMPACTS.
Nov 5, 2021P00048$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MODIFICATION TO INCORPORATE UPDATED B.3 AWARD FEE CHART. THESE CHANGES ARE EFFECTIVE IMMEDIATELY AND THE PERIOD OF PERFORMANCE REMAINS UNCHANGED.
Oct 29, 2021P00047$0EO14042 DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES ATTACHMENT J-13, AWARD FEE EVALUATION PLAN (AFEP) UPDATED WITH SIXTH AWARD FEE PERIOD AREAS OF EMPHASIS (AOES).
Oct 15, 2021P00045$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). REPLACES NFS SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY RESOURCES WITH SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY RESOURCES.
Oct 15, 2021P00046$0EO14042 DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES CLAUSE, 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS. (DEVIATION 21-03)
Sep 23, 2021P00044$3.3MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). ADDS INCREMENTAL FUNDING. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. REPLACEMENT PAGES ATTACHED.
Aug 25, 2021P00043$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 43: INCORPORATES TRENDS 00100 COMPLETE TRADE STUDY DESIGN DEVELOPMENT, 00123 HURRICANE LOADS AND 00178 PURCHASE OF CONEX BOXES.
Aug 19, 2021P00042$64.0MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).MOD 42: ADDS INCREMENTAL FUNDING AND AWARD FEES. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Jul 28, 2021P00041$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 41: INCORPORATES AWARD FEE EVALUATION PLAN (AFEP) UPDATED WITH FIFTH AWARD FEE PERIOD AREAS OF EMPHASIS (AOE) ALL OTHER TERMS AND CONDITION REMAIN UNCHANGED.
Jul 15, 2021P00040$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 40: INCORPORATES SEVERAL ADMINISTRATIVE CHANGES. TOTAL COST AND FUNDED THROUGH DATE REMAINS UNCHANGED.
Jun 9, 2021P00039$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 39: INCORPORATES THE REDUCTION IN EFFORT DESCRIBED BECHTEL TREND 00139, REMOVAL OF CLEANING AGENT REQUIREMENT.
May 26, 2021P00038$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 38: INCORPORATES EFFORTS DESCRIBED BECHTEL TRENDS, WEIGHT LIMIT AND HYPER REQUIREMENTS, MOUNT MECHANISM 3 LATERAL BRACE, AND ADDITIONAL STRUCTURAL ANALYSIS.
May 7, 2021P00037$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MODIFICATION UPDATES B.3 AWARD FEE CHART. THESE CHANGES ARE EFFECTIVE IMMEDIATELY AND THE PERIOD OF PERFORMANCE REMAINS UNCHANGED.
May 6, 2021P00036$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES THE EFFORT DESCRIBED BECHTEL TRENDS. TOTAL COST IS INCREASED $1,040,246, CHANGES ARE EFFECTIVE IMMEDIATELY, PERIOD OF PERFORMANCE REMAINS UNCHANGED.
Mar 31, 2021P00035$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES BECHTEL TREND 00037, TOTAL COST INCREASES $727,436. PERIOD OF PERFORMANCE REMAINS UNCHANGED.
Mar 5, 2021P00034$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 34: INCORPORATES THE EFFORT DESCRIBED BECHTEL TRENDS 00082,00083 AND 00085. CONTRACT VALUE IS INCREASED. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Mar 2, 2021P00033$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 33: INCORPORATES THE EFFORT DESCRIBED BECHTEL TREND 00136. TOTAL COST OF THE SUBJECT CONTRACT IS HEREBY INCREASED BY $601,691
Feb 17, 2021P00032$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES THE EFFORT DESCRIBED BECHTEL TREND 00095 EFFECTIVE IMMEDIATELY, PERIOD OF PERFORMANCE REMAINS UNCHANGED. TOTAL COST IS HEREBY INCREASED $848,749.
Feb 12, 2021P00031$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 31: INCORPORATES THE EFFORT DESCRIBED BECHTEL TRENDS 00039,00090 AND 00092. THESE CHANGES ARE EFFECTIVE IMMEDIATELY AND THE PERIOD OF PERFORMANCE REMAINS UNCHANGED.
Dec 3, 2020P00030$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2. INCORPORATION OF DESIGN CHANGES TO THE ML2, CHANGES ARE EFFECTIVE IMMEDIATELY AND THE PERIOD OF PERFORMANCE REMAINS UNCHANGED.
Nov 23, 2020P00029$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2. MODIFICATION INCORPORATES UPDATED B.3 AWARD FEE CHART, EFFECTIVE IMMEDIATELY. ALL OTHER TERMS AND CONDITIONS OF THE SUBJECT CONTRACT REMAIN UNCHANGED.
Nov 13, 2020P00026$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES THE EFFORT DESCRIBED BECHTEL TRENDS 00066 AND 00069. TOTAL COST AND AVAILABLE AWARD FEE ARE INCREASED FROM $406,080,353 BY $607,128 TO $406,687,481.
Nov 13, 2020P00027$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES THE NEW DEVIATION AND WAIVER PROCESS. REPLACEMENT PAGES ARE ATTACHED AND SHOULD BE APPROPRIATELY INSERTED INTO COPIES OF THE CONTRACT.
Nov 13, 2020P00028$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).INCORPORATES SEVERAL ADMINISTRATIVE CHANGES. THE TOTAL COST AND AVAILABLE AWARD FEE REMAIN UNCHANGED. REPLACEMENT PAGES ATTACHED AND SHOULD BE APPROPRIATELY INSERTED.
Nov 12, 2020P00025$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). ATTACHMENT J-13, AWARD FEE EVALUATION PLAN (AFEP) UPDATED WITH FOURTH AWARD FEE PERIOD AREAS OF EMPHASIS (AOES). ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Sep 24, 2020P00024$2.2MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MODIFICATION ADDS INCREMENTAL FUNDING. COST AND FUNDING SCHEDULES APPROPRIATELY UPDATED AND ATTACHED.
Sep 22, 2020P00023$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE EFFORT DESCRIBED IN TN-001, INCREASING CONTRACT VALUE. PERIOD OF PERFORMANCE REMAINS UNCHANGED.
Sep 2, 2020P00021$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MODIFICATION CAPTURES TRENDS INCREASING CONTRACT VALUE. FUNDED THROUGH DATE REMAINS UNCHANGED.
Aug 26, 2020P00022$30.0MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MODIFICATION ADDS INCREMENTAL FUNDING SUFFICIENT FOR PERFORMANCE THROUGH 7/15/22. ATTACHMENT J012 APPROPRIATELY UPDATED AN ATTACHED.
Jul 22, 2020P00020$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). THIS MODIFICATION CAPTURES TRENDS AND COSTS ASSOCIATED WITH COMPUTER EQUIPMENT FOR TELEWORKING DURING THE COVID 19 CRISIS, TOTAL COST IS INCREASED $458,182.00
Jun 15, 2020P00017$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MODIFICATION CAPTURE ADMINISTRATIVE CHANGES, EFFECTIVE IMMEDIATELY. REPLACEMENT PAGES ATTACHED, ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
May 29, 2020P00018$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MODIFICATION INCORPORATES UUPDTED B.3 AWARD FEE CHART, EFFECTIVE IMMEDIATELY.
May 29, 2020P00019$14.4MDESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MODIFICATION ADDS INCREMENTAL FUNDING, SUFFICIENT THROUGH 11/30/2021. UPDATED SCHEDULE ATTACHED.
May 7, 2020P00016$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 16: THIS MODIFICATION CAPTURES A 3 MONTH EXTENSION. TO INCLUDE SUPPORT SERVICES, DESIGN EFFORT AND CONSTRUCTION EFFORT. ENDING POP IS EXTENDED TO 6/14/23.
Apr 8, 2020P00015$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MODIFICATION CAPTURES ADMINISTRATIVE CHANGES. REPLACEMENT PAGES ARE ATTACHED AND SHOULD BE APPROPRIATELY INSERTED INTO COPIES OF THE CONTRACT.
Mar 15, 2020P00014$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). INCORPORATES UPDATED AWARD FEE EVALUATION PLAN, EFFECTIVE IMMEDIATELY.
Mar 5, 2020P00013$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MODIFICATION CAPTURES REQUIREMENT CHANGES COST IMPACT IN EFFORT TO COMPLETE SYSTEM REQUIREMENTS REVIEW, UPDATE STATEMENT OF WORK AND SKID SPACE RESERVE STUDY ADDITION.
Feb 20, 2020P00012$0DESIGN&CONSTRUCTION OF SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2) MOD 12:CHANGE KENNEDY GROUND CONTROL SUBSYSTEM (KGCS) REQUIREMENT FROM GOVERNMENT FURNISHED EQUIPMENT (GFE) TO GOVERNMENT FURNISHED DESIGN (GFD) COST&AWARD FEE ARE INCREASED
Jan 17, 2020P00010$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD REVISES MULTIPLE PAGES (ATTACHED). CHANGES EFFECTIVE IMMEDIATELY, FUNDED THROUGH AND END DATE REMAIN UNCHANGED. TOTAL COST AND AWARD FEE REMAIN UNCHANGED.
Jan 17, 2020P00011$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD ADDS REQUIREMENT FOR DESIGN, FABRICATION, TESTING INSTALLATION AND VERIFICATION OF THE LAUNCH CONTROL SUBSYSTEM AND REVIEWS. COST AND AWARD FEE INCREASE $925,795.
Dec 17, 2019P00009$0DESIGN AND CONSTRUCTION OF NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MODIFICATION INCORPORATES UPDATED TABLE B.4.1 TO DCMA APPROVED 2019 AND 2020 PROVISIONAL BILLING RATES. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Dec 3, 2019P00008$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE EFFORT NECESSARY TO COMPLETE A PAD ACCESS FEASIBILITY STUDY. THE TOTAL COST OF THE SUBJECT CONTRACT IS HEREBY INCREASED FROM $359,991,200 BY $56,747 TO $360,047,947. THE TOTAL AVAILABLE AWARD FEE REMAINS UNCHANGED AT $23,262,384. THE TOTAL COST AND AVAILABLE AWARD FEE IS HEREBY INCREASED FROM $383,253,584 BY $56,747 TO $383,310,331. THESE CHANGES ARE EFFECTIVE IMMEDIATELY AND THE PERIOD OF PERFORMANCE REMAINS UNCHANGED. THE FUNDED THROUGH DATE REMAINS UNCHANGED AT OCTOBER 1, 2021. REPLACEMENT PAGES ARE ATTACHED AND SHOULD BE APPROPRIATELY INSERTED INTO COPIES OF THE CONTRACT.
Nov 21, 2019P00007$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 7: 2. THE CONTRACT VALUE IS INCREASED BY $68,990 TO ACCOUNT FOR COST IMPACTS SUSTAINED DUE TO THE CLOSURE OF KENNEDY SPACE CENTER FOR HURRICANE DORIAN. 3. THE CONTRACT VALUE IS DECREASED BY $181,762 DUE TO THE REMOVAL OF THE RELIABILITY, MAINTAINABILITY, AND AVAILABILITY EFFORT DESCRIBED IN TN-002. 4. THE CONTRACT VALUE IS HEREBY INCREASED BY $345,162 TO IMPLEMENT THE ADDITIONAL TECHNICAL REVIEWS REQUESTED WITH TN-004. 5. THESE CHANGES ARE EFFECTIVE IMMEDIATELY AND THE PERIOD OF PERFORMANCE REMAINS UNCHANGED. 6. THE FUNDED THROUGH DATE REMAINS UNCHANGED AT OCTOBER 1, 2021. 7. THE TOTAL COST OF THE SUBJECT CONTRACT IS HEREBY INCREASED FROM $359,758,810 BY $232,390 TO $359,991,200. THE TOTAL AVAILABLE AWARD FEE REMAINS UNCHANGED AT $23,262,384. THE TOTAL COST AND AVAILABLE AWARD FEE IS HEREBY INCREASED FROM $383,021,194 BY $232,390 TO $383,253,584.
Nov 14, 2019P00006$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). THE PURPOSE OF THIS MODIFICATION IS TO UPDATE B.3 AWARD FEE CHART AND 52.242-93A1 CONTRACTOR WORKFORCE REPORT (JUL 2018) ALTERNATE 1 (JUL 201). ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Oct 30, 2019P00005$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). THE PURPOSE OF THIS MODIFICATION IS TO UPDATE B.3 AWARD FEE CHART. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Sep 18, 2019P00003$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 3: 52.244-2 SUBCONTRACTS (OCT 2010)(ALTERNATE I JUNE 2007) IS HEREBY UPDATED TO ADD THE FOLLOWING PARAGRAPH (J) FILL-IN: GP STRATEGIES, BRPH, CIMARRON, ONYX. AWARD FEE EVALUATION PLAN (AFEP) UPDATED WITH SECOND AWARD FEE PERIOD AREAS OF EMPHASIS (AOES). ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Sep 18, 2019P00004$20.8MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 4: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $20,820,988.08. THE TOTAL FUNDED AMOUNT IS HEREBY INCREASED TO $296,658,688.08. ALL OTHER TERMS REMAIN UNCHANGED.
Aug 27, 2019P00002$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 2: THE PURPOSE OF THIS MODIFICATION IS TO MAKE SEVERAL FORMAT REVISIONS TO THE CONTRACT. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Jul 9, 2019P00001$0DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). MOD 1: THE PURPOSE OF LAUCHING THIS MODIFICATION IN FPDS-NG WAS ONLY TO MAKE SYSTEMS MATCH. THIS MOD WAS CREATED IN ERROR, A SYSTEM GLITCH. THIS MOD DOES NOT EXIST WITHIN THE CONTRACT FILES. THERE ARE NO AWARD DOCUMENTS FOR THIS MOD.
Jun 25, 20190$275.8MDESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).