Federal contract award

80KSC019F0068

GROUNDWATER INTERIM MEASURES AND CONTINUED OPERATION, MAINTENANCE AND MONITORING (OM&M)OF EXISTING AIR SPARGE SYSTEM TO PROTECT OUTSTANDING FLORIDA WATERS AND PREVENT THE EASTERN GROUNDWATER PLUME AT THE FORMER COMPONENTS CLEANING FACILITY (CCF EAST)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA KENNEDY SPACE CENTER
NAICS541620 — Environmental Consulting Services
PSCC219 — Other Architect and Engineering Services
Parent award / vehicle80KSC019D0011
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$2.7M
Current contract value$2.7M
Potential contract value / ceiling$2.7M
Start dateSep 16, 2019
Current end dateJun 30, 2026
Potential end dateJun 30, 2026
Latest award activityFeb 20, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Feb 20, 2026P00009$-114.3KGROUNDWATER INTERIM MEASURES AND MONITORING AT COMPONENTS CLEANING FACILITY
Dec 9, 2025P00008$0GROUNDWATER INTERIM MEASURES AND MONITORING AT COMPONENTS CLEANING FACILITY AND ARE SOUTH OF K7-516 KENNEDY SPACE CENTER, FL
Dec 7, 2024P00007$0GROUNDWATER INTERIM MEASURES AND MONITORING AT COMPONENTS CLEANING FACILITY AND AREA SOUTH OF K7-516 KENNEDY SPACE CENTER, FLORIDA
Aug 30, 2023P00006$65.2KGROUNDWATER INTERIM MEASURES AND MONITORING AT COMPONENTS CLEANING FACILITY AND AREA SOUTH OF K7-516. MOD 6: INCORPORATES TECHNICAL DIRECTIVE (TD)-6. FUNDING AND VALUES ARE HEREBY INCREASED, AND PERIOD OF PERFORMANCE EXTENDED.
Jan 12, 2023P00005$340.8KGROUNDWATER INTERIM MEASURES AND MONITORING AT COMPONENTS CLEANING FACILITY AND AREA SOUTH OF K7-516. INCORPORATES TECHNICAL DIRECTIVE #5. FUNDING AND VALUE ARE INCREASED $340,815.00. THE PERIOD OF PERFORMANCE END DATE REMAINS UNCHANGED.
Aug 25, 2022P00004$185.0KGROUNDWATER INTERIM MEASURES AND CONTINUED OPERATION MAINTENANCE AND MONITORING (OM&M) OF EXISTING AIR SPARGE SYSTEM. MOD 4: INCORPORATES TECHNICAL DIRECTIVE (TD)#4. FUNDING AND VALUE ARE INCREASED TO $2,388,474.00.
Jul 12, 2021P00003$516.2KGROUNDWATER INTERIM MEASURES AND CONTINUED OPERATION MAINTENANCE AND MONITORING (OM&M) OF EXISTING AIR SPARGE SYSTEM. MOD 3: INCORPORATE TECHNICAL DIRECTIVE (TD)3. TASK ORDER FUNDING AND VALUES ARE INCREASED. PERIOD OF PERFORMANCE IS EXTENDED.
Aug 20, 2020P00002$1.2MGROUNDWATER INTERIM MEASURES AND CONTINUED OPERATION, MAINTENANCE AND MONITORING (OM&M) OF EXISTING AIR SPARGE SYSTEM. . .MOD INCORPORATES TECHNICAL DIRECTIVE #2 INCREASING FUNDING&VALUE $1,169,731. PERIOD OF PERFORMANCE END DATE REMAINS UNCHANGED.
Apr 15, 2020P00001$263.0KGROUNDWATER INTERIM MEASURES AND CONTINUED OPERATION, MAINTENANCE AND MONITORING(OM&M)MOD 1: INCORPORATES TECHNICAL DIRECTIVE (TD) #1, ADDING FUNDING AND VALUE BY $263,006.00 THE PERIOD OF PERFORMANCE END DATE IS EXTENDED TO 6/30/22
Sep 16, 20190$254.6KGROUNDWATER INTERIM MEASURES AND CONTINUED OPERATION, MAINTENANCE AND MONITORING (OM&M)OF EXISTING AIR SPARGE SYSTEM TO PROTECT OUTSTANDING FLORIDA WATERS AND PREVENT THE EASTERN GROUNDWATER PLUME AT THE FORMER COMPONENTS CLEANING FACILITY (CCF EAST)

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.