Federal contract award

80KSC019F0070

GROUNDWATER INTERIM MEASURES AND MONITORING AT CONVERTOR COMPRESSOR BUILDING KENNEDY SPACE CENTER, FLORIDA

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA KENNEDY SPACE CENTER
NAICS541620 — Environmental Consulting Services
PSCC219 — Other Architect and Engineering Services
Parent award / vehicle80KSC019D0011
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$895.6K
Current contract value$895.6K
Potential contract value / ceiling$895.6K
Start dateJun 6, 2019
Current end dateJun 20, 2026
Potential end dateJun 20, 2026
Latest award activityDec 6, 2024
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Dec 6, 2024P00006$0GROUNDWATER INTERIM MEASURES AND MONITORING AT CONVERTOR COMPRESSOR BUILDING KENNEDY SPACE CENTER, FLORIDA
Sep 7, 2023P00005$29.9KGROUNDWATER INTERIM MEASURES AND MONITORING AT CONVERTOR COMPRESSOR BUILDING. MOD 5: INCORPORATE TECHNICAL DIRECTIVE(TD)#5. FUNDING AND VALUE ARE INCREASED BY $29,891.13 AND PERIOD OF PERFORMANCE END DATE IS EXTENDED TO DECEMBER 31, 2024.
Dec 23, 2022P00004$37.3KGROUNDWATER INTERIM MEASURES AND MONITORING AT CONVERTOR COMPRESSOR BUILDING. MOD 4: INCORPORATES TECHNICAL DIRECTIVE 4 INCREASING FUNDING AND VALUE. PERIOD OF PERFORMANCE REMAINS UNCHANGED. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Sep 22, 2022P00003$99.2KGROUNDWATER INTERIM MEASURES AND MONITORING AT CONVERTOR COMPRESSOR BUILDING. MOD 3: INCORPORATES TECHNICAL DIRECTIVE 3 INCREASING FUNDING AND VALUE. PERIOD OF PERFORMANCE END DATE IS EXTENDED. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Jun 30, 2021P00002$161.6KGROUNDWATER INTERIM MEASURES AND MONITORING AT CONVERTOR COMPRESSOR BUILDING. INCORPORATES TECHNICAL DIRECTIVE 2 INCREASING FUNDING AND VALUE $161,614 AND EXTENDING PERFORMANCE END DATE TO JUNE 30, 2023.
Jun 26, 2020P00001$304.9KGROUNDWATER INTERIM MEASURES AND MONITORING AT CONVERTOR COMPRESSOR BUILDING MOD 1: THIS MODIFICATION INCORPORATES TECHNICAL DIRECTIVE #1. FUNDING AND VALUE ARE AND THE PERIOD OF PERFORMANCE END DATE IS EXTENDED TO 6/30/22.
Jun 6, 20190$262.7KGROUNDWATER INTERIM MEASURES AND MONITORING AT CONVERTOR COMPRESSOR BUILDING KENNEDY SPACE CENTER, FLORIDA