Federal contract award
80KSC020C0013
MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1B, PHASE 1.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA KENNEDY SPACE CENTER |
| NAICS | 236210 — Industrial Building Construction |
| PSC | Y1EZ — CONSTRUCTION OF OTHER INDUSTRIAL BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $31.9M |
| Current contract value | $31.9M |
| Potential contract value / ceiling | $31.9M |
| Start date | Apr 2, 2020 |
| Current end date | Feb 29, 2028 |
| Potential end date | Feb 29, 2028 |
| Latest award activity | Aug 7, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 65 of 65 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 7, 2026 | P00064 | $16.2M | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Jun 17, 2026 | P00063 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| May 20, 2026 | P00062 | $80.1K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Feb 6, 2026 | P00061 | $82.1K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Dec 16, 2025 | P00060 | $28.6K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Sep 24, 2025 | P00059 | $23.2K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Jun 17, 2025 | P00057 | $31.4K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Jun 17, 2025 | P00058 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| May 8, 2025 | P00056 | $87.4K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Mar 31, 2025 | P00055 | $73.1K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Mar 26, 2025 | P00054 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Feb 21, 2025 | P00053 | $513.9K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Dec 12, 2024 | P00052 | $54.7K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Sep 26, 2024 | P00051 | $73.7K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Aug 26, 2024 | P00050 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Aug 14, 2024 | P00049 | $26.6K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Aug 12, 2024 | P00048 | $56.5K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Jul 8, 2024 | P00047 | $13.7K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Jun 3, 2024 | P00046 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| May 1, 2024 | P00045 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Apr 2, 2024 | P00044 | $6.0K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Mar 22, 2024 | P00043 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Mar 5, 2024 | P00042 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. |
| Jan 26, 2024 | P00041 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. EXTENDS COMPLETION DATE TO FEBRUARY 29, 2024. |
| Jan 19, 2024 | P00040 | $131.1K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. INCORPORATES CHANGES FOR AN ADDITIONAL $131,105. |
| Nov 28, 2023 | P00039 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1 PHASE 1. MODIFICATION TO EXTEND COMPLETIONS DATE TO JANUARY 31, 2024 TO ALLOW RESOLUTION OF OPEN TECHNICAL ISSUES. |
| Sep 27, 2023 | P00037 | $121.4K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEMS BLOCK 1 PHASE 1. INCORPORATES TRACKING NUMBERS 90, 92, 93, 94, 95, 98, 99 AND REQUEST FOR EQUITABLE ADJUSTMENT 003 FOR AN INCREASE OF $121,446. COMPLETION DATE REMAINS UNCHANGED. |
| Sep 27, 2023 | P00038 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1 PHASE 1. MODIFICATION TO EXTEND COMPLETION DATE TO OCTOBER 31, 2023 TO ALLOW RESOLUTION OF OPEN TECHNICAL ISSUES AND ANY ASSOCIATED SCHEDULE IMPACTS. |
| Sep 1, 2023 | P00036 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. EXTENSION TO SEPTEMBER 30, 2023. |
| Aug 9, 2023 | P00035 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1 PHASE 1. MOD 35: EXTEND COMPLETION DATE TO AUGUST 31, 2023 TO ALLOW RESOLUTION OF OPEN TECHNICAL ISSUES AND ANY ASSOCIATED SCHEDULE IMPACTS. |
| May 4, 2023 | P00034 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1 PHASE 1. EXTENDS THE COMPLETION DATE FROM APRIL 06, 2023 TO JULY 31, 2023. |
| Mar 31, 2023 | P00033 | $44.7K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1B. PHASE 1. INCORPORATES MULTIPLE TRACKING NUMBERS AND REQUEST FOR EQUITABLE ADJUSTMENT FOR $44,676.00. |
| Feb 15, 2023 | P00032 | $56.7K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1B, PHASE 1. INCORPORATES TRACKING NUMBERS 085, 085, 086, AND 087. THE CONTRACT COMPLETION DATE OF APRIL 6, 2023, REMAINS UNCHANGED. |
| Sep 22, 2022 | P00031 | $141.0K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEMS BLOCK 1 PHASE 1. INCORPORATES MULTIPLE TRACKING NUMBERS FOR $140,978. THE CONTRACT COMPLETION DATE OF APRIL 6, 2023, REMAINS UNCHANGED. |
| Aug 25, 2022 | P00030 | $643.9K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEMS BLOCK 1 PHASE 1. INCORPORATES TRACKING NUMBER 056 FOR AN ADDITIONAL $643,896. ALSO UPDATES VENDOR INFO IN THE SYSTEM. |
| Aug 17, 2022 | P00029 | $945.8K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. INCORPORATES TRACKING NUMBER 072 AND DEVIATION WAIVER 018 FOR AN ADDITIONAL $945,787. THE CONTRACT COMPLETION DATE IS EXTENDED TO APRIL 6, 2023. |
| Aug 3, 2022 | P00028 | $227.3K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. INCORPORATES MULTIPLE TRACKING NUMBERS AND A COST DEVIATION WAIVER FOR AN ADDITIONAL $227,326.00. |
| Jun 10, 2022 | P00027 | $36.2K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. INCORPORATES MULTIPLE TRACKING NUMBERS AND A DEVIATION WAIVER. AWARD INCREASED $36,247.00. CONTRACT COMPLETION DATE, AUGUST 8, 2022, REMAINS UNCHANGED |
| Mar 3, 2022 | P00026 | $16.6K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SLS BLOCK 1 PHASE 1. MOD 26: INCORPORATES TRACKING NUMBERS (TN)-054-DRYWALL-EQUIPMENT MODIFICATIONS, 059-REPLACE CIRCUIT, 060-CIRCUIT RECONFIGURATION, AND 063-RE-ROUTE YARD CONDUIT. |
| Feb 14, 2022 | P00025 | $47.7K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. INCORPORATES TRACKING NUMBERS 057 AND 058 FOR $47,682. COMPLETION DATE REMAIN UNCHANGED. |
| Jan 27, 2022 | P00024 | $65.6K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. INCORPORATES TRACKING NUMBERS 050 AND 051 FOR AN ADDITIONAL $65,554.00. |
| Jan 13, 2022 | P00022 | $95.8K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1 PHASE 1. INCORPORATES TRACKING NUMBER 052 AND 053 FOR AN ADDITIONAL $95,784.00. ALSO INCORPORATES DEVIATION WAIVER 010 AT NOT COST. |
| Jan 13, 2022 | P00023 | $70.9K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SLS BLOCK 1 PHASE 1. INCORPORATES TRACKING NUMBERS 036 AND 055 FOR AN ADDITIONAL $70,882. COMPLETION DATE REMAINS UNCHANGED. |
| Jan 5, 2022 | P00021 | $706.0K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SLS BLOCK 1 PHASE 1. MOD 21: INCORPORATES TRACKING NUMBER (TN)-030, REVISED LHE PUMP DELIVERY DATE AND UPDATES COMPLETION DATE. |
| Dec 6, 2021 | P00019 | $37.8K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1 PHASE 1. INCORPORATES TRACKING NUMBERS 043, 046 AND 047 FOR AN ADDITIONAL $37,786.00. |
| Dec 6, 2021 | P00020 | $45.3K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SLS BLOCK 1 PHASE 1. MOD 20: INCORPORATES TRACKING NUMBERS (TN)'S 038, 048, AND 049. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
| Sep 22, 2021 | P00018 | $87.1K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1 PHASE 1. MOD 18: INCORPORATES TRACKING NUMBER (TN)-010, AUTOCLAVE TUBE ADAPTERS, INTO THE CONTRACT. FUNDING AND VALUES ARE INCREASED. |
| Sep 15, 2021 | P00017 | $99.1K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1 PHASE 1. MOD 17: INCORPORATES TRACKING NUMBERS (TN)'S 031, 041, 042, AND 045 AND DEVIATION WAIVERS (DW) 006-008 INTO THE CONTRACT. |
| Aug 31, 2021 | P00016 | $30.5K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SLS BLOCK 1 PHASE 1. INCORPORATES TRACKING NUMBERS 028, 034, 037, 044 AND DEVIATION WAIVER 002. CONTRACT IS INCREASED $30,544.00. |
| Aug 25, 2021 | P00015 | $22.6K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1 PHASE 1. MOD 15: INCORPORATES TRACKING NUMBER'S (TN)-032, 033, AND 040 AND DEVIATION WAIVERS (DW) 003-005 INTO THE CONTRACT. |
| Aug 9, 2021 | P00014 | $27.4K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1.INCORPORATES TRACKING NUMBERS 029 AND 035 FOR AN ADDITIONAL $27,443.00. THE CONTRACT COMPLETION DATE OF JANUARY 19, 2022 REMAINS UNCHANGED. |
| Jun 17, 2021 | P00013 | $11.3K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. INCORPORATES TRACKING NUMBER 027 AT AN INCREASE OF $11,295.00 CONTRACT COMPLETION DATE REMAINS UNCHANGED. |
| Jun 4, 2021 | P00012 | $19.7K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1 MOD 12: INCORPORATES TRACKING NUMBER(S) (TN) TN-016, FLOW METER WIRING AND PROGRAMMING REQUIREMENTS, AND TN-026, JOY COMPRESSOR #5 POWER RECONFIGURATION. |
| May 19, 2021 | P00011 | $24.5K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. INCORPORATES TRACKING NUMBERS 021, 022 AND 023 INCREASING AWARD $24,462.00. THE CONTRACT COMPLETION DATE OF JANUARY 19, 2022 REMAINS UNCHANGED. |
| May 12, 2021 | P00010 | $64.1K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1B PHASE 1 MOD 10: INCORPORATES TRACKING NUMBERS (TN)TN-013, TN-020, AND TN-025. FUNDING AND VALUES ARE INCREASED. |
| May 4, 2021 | P00009 | $70.3K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1B PHASE 1 MOD 9:INCORPORATES TRACKING NUMBER (TN)-018 AND 019. FUNDING AND VALUES ARE INCREASED. |
| Apr 12, 2021 | P00007 | $47.9K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1B PHASE 1 MOD 7: INCORPORATES TRACKING NUMBERS (TN)-007, 012, 015, AND 017. TOTAL FUNDING INCREASED FOR THE ABOVE TN'S IS $47,878.00. |
| Apr 12, 2021 | P00008 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1B PHASE 1 MOD 8: CHANGES THE CONTRACTOR'S NAME FROM SAUER, INC TO SAUER CONSTRUCTION, LLC AS IDENTIFIED IN THE ATTACHED CHANGE OF NAME AGREEMENT |
| Mar 10, 2021 | P00006 | $13.1K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1B PHASE 1. MOD 6: INCORPORATES (TRACKING NUMBERS) TN-009, TN-011, AND TN-014. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
| Feb 19, 2021 | P00005 | $10.9K | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1 PHASE 1. INCORPORATES TRACKING NUMBER(S) 006 AND 008. AWARD INCREASED $10,916.00, COMPLETION DATE REMAINS UNCHANGED. |
| Jan 13, 2021 | P00004 | $11.5K | REPAIR VEHICLE ASSEMBLY BUILDING (VAB) UTILITY ANNEX. MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) MOD 4: INCORPORATES TRACKING NUMBER (TN)005, FACT SHEET MEZZAININE WALL MODIFICATIONS. |
| Nov 9, 2020 | P00003 | $1.7K | REPAIR VEHICLE ASSEMBLY BUILDING (VAB) UTILITY ANNEX. MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SLS BLOCK 1 PHASE 1. MOD 3: INCORPORATES TRACKING NUMBER (TN)-004, FACT SHEET, SUB SLAB DE-PRESSURIZATION SYSTEM (SSDS) VAPOR POINT DEMOLITION. |
| Oct 6, 2020 | P00002 | $10.6K | REPAIR VEHICLE ASSEMBLY BUILDING (VAB) UTILITY ANNEX. MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SLS BLOCK 1 PHASE 1. MOD INCORPORATES TRACKING NUMBER (TN) 002,003 AND DEVIATION WAIVER 001 FOR AN INCREASE OF $10,623.00. |
| Jul 29, 2020 | P00001 | $0 | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SLS BLOCK 1 PHASE 1. NO COST MODIFICATION INCORPORATES TRACKING NUMBER 001 AND SITE SPECIFIC SAFETY AND HEALTH PLAN, REV 1, 140 PGS, DATED 6/3/2020, INTO SECTION J, LIST OF ATTACHMENTS, J-L. |
| Apr 2, 2020 | 0 | $10.6M | MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1B, PHASE 1. |
Estimated positioning window
Feb 28, 2027 – Aug 29, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2028-02-29 (492 days from calculation)
- +25 points
- 2 historical awards in this buyer and category group
- +10 points
- 65 recorded award transactions
- +10 points
- Latest award action: 2026-08-07
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
| Contact | Role | Published contact methods | Evidence | Source date |
|---|---|---|---|---|
| Anthony M. Caruvana | Contact | anthony.m.caruvana@nasa.gov 321 867-3464 | Source | Feb 20, 2020 |
| C. M. Julius Williams | Contact | christopher.m.williams@nasa.gov 321 861-2661 | Source | Feb 20, 2020 |
| Anthony M. Caruvana | Contact | anthony.m.caruvana@nasa.gov 321 867-3464 | Source | Feb 18, 2020 |
| C. M. Julius Williams | Contact | christopher.m.williams@nasa.gov 321 861-2661 | Source | Feb 18, 2020 |
| Anthony M. Caruvana | Contact | anthony.m.caruvana@nasa.gov 321 867-3464 | Source | Feb 14, 2020 |
| C. M. Julius Williams | Contact | christopher.m.williams@nasa.gov 321 861-2661 | Source | Feb 14, 2020 |
| Anthony M. Caruvana | Contact | anthony.m.caruvana@nasa.gov 321 867-3464 | Source | Feb 11, 2020 |
| C. M. Julius Williams | Contact | christopher.m.williams@nasa.gov 321 861-2661 | Source | Feb 11, 2020 |
| Anthony M. Caruvana | Contact | anthony.m.caruvana@nasa.gov 321 867-3464 | Source | Feb 10, 2020 |
| C. M. Julius Williams | Contact | christopher.m.williams@nasa.gov 321 861-2661 | Source | Feb 10, 2020 |
| Anthony M. Caruvana | Contact | anthony.m.caruvana@nasa.gov 321 867-3464 | Source | Feb 7, 2020 |
| C. M. Julius Williams | Contact | christopher.m.williams@nasa.gov 321 861-2661 | Source | Feb 7, 2020 |
| Anthony M. Caruvana | Contact | anthony.m.caruvana@nasa.gov 321 867-3464 | Source | Jan 31, 2020 |
| C. M. Julius Williams | Contact | christopher.m.williams@nasa.gov 321 861-2661 | Source | Jan 31, 2020 |
| Anthony M. Caruvana | Contact | anthony.m.caruvana@nasa.gov 321 867-3464 | Source | Jan 31, 2020 |
| C. M. Julius Williams | Contact | christopher.m.williams@nasa.gov 321 861-2661 | Source | Jan 31, 2020 |
| Anthony M. Caruvana | Contact | anthony.m.caruvana@nasa.gov 321 867-3464 | Source | Jan 15, 2020 |
| C. M. Julius Williams | Contact | christopher.m.williams@nasa.gov 321 861-2661 | Source | Jan 15, 2020 |
| Anthony M. Caruvana | Contact | anthony.m.caruvana@nasa.gov 321 867-3464 | Source | Jan 13, 2020 |
| C. M. Julius Williams | Contact | christopher.m.williams@nasa.gov 321 861-2661 | Source | Jan 13, 2020 |
| Anthony M. Caruvana | Contact | anthony.m.caruvana@nasa.gov 321 867-3464 | Source | Nov 18, 2019 |
| C. M. Julius Williams | Contact | christopher.m.williams@nasa.gov 321 861-2661 | Source | Nov 18, 2019 |
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.