Federal contract award

80KSC021F0019

REPLACE ROOF AND ROOFTOP HEATING, VENTILATING AND AIR CONDITIONING (HVAC) EQUIPMENT ON THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX MANUFACTURING AND ADMINISTRATION BUILDING.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA KENNEDY SPACE CENTER
NAICS236210 — Industrial Building Construction
PSCZ2EZ — REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS
Parent award / vehicle80SSC018D0020
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$13.3M
Current contract value$13.3M
Potential contract value / ceiling$13.3M
Start dateJan 4, 2021
Current end dateSep 26, 2026
Potential end dateSep 26, 2026
Latest award activityJun 26, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 26, 2026P00039$171.2KREPLACE THE ROOF AND ROOFTOP HVAC EQUIPMENT ON TWO SEPARATE BUILDINGS WITHIN THE BOOSTER FABRICATION FACILITY (BFF) THE ENGINEERING AND ADMINISTRATION (E&A) BUILDING (E&A) AND THE MANUFACTURING BUILDING AT THE KENNEDY SPACE CENTER, FL.
Dec 2, 2025P00038$120.7KREPLACE THE ROOF AND ROOFTOP HVAC EQUIPMENT ON TWO SEPARATE BUILDINGS WITHIN THE BOOSTER FABRICATION FACILITY (BFF) THE ENGINEERING AND ADMINISTRATION (E&A) BUILDING (E&A) AND THE MANUFACTURING BUILDING AT THE KENNEDY SPACE CENTER, FL.
Nov 26, 2025P00037$0REPLACE THE ROOF AND ROOFTOP HVAC EQUIPMENT ON TWO SEPARATE BUILDINGS WITHIN THE BOOSTER FABRICATION FACILITY (BFF).
Sep 8, 2025P00036$0REPLACE THE ROOF AND ROOFTOP HVAC EQUIPMENT ON TWO SEPARATE BUILDINGS WITHIN THE BOOSTER FABRICATION FACILITY (BFF) THE ENGINEERING AND ADMINISTRATION (E&A) BUILDING (E&A) AND THE MANUFACTURING BUILDING AT THE KENNEDY SPACE CENTER, FL.
Jul 30, 2025P00035$0REPLACE THE ROOF AND ROOFTOP HVAC EQUIPMENT ON TWO SEPARATE BUILDINGS WITHIN THE BOOSTER FABRICATION FACILITY (BFF) THE ENGINEERING AND ADMINISTRATION (E&A) BUILDING (E&A) AND THE MANUFACTURING BUILDING AT THE KENNEDY SPACE CENTER, FL.
Jun 4, 2025P00034$0REPLACE THE ROOF AND ROOFTOP HVAC EQUIPMENT ON TWO SEPARATE BUILDINGS WITHIN THE BOOSTER FABRICATION FACILITY (BFF) THE ENGINEERING AND ADMINISTRATION (E&A) BUILDING (E&A) AND THE MANUFACTURING BUILDING AT THE KENNEDY SPACE CENTER, FL.
Apr 7, 2025P00033$0REPLACE THE ROOF AND ROOFTOP HVAC EQUIP ON TWO SEPARATE BUILDING WITHIN THE BOOSTER FABRICATION FACILITY, ENGINEERING & ADMIN & THE MFG BUILDING AT KSC, FL.
Feb 7, 2025P00032$125.2KREPLACE THE ROOF AND ROOFTOP HVAC EQUIPMENT ON TWO SEPARATE BUILDINGS WITHIN THE BOOSTER FABRICATION FACILITY (BFF) THE ENGINEERING AND ADMINISTRATION (E&A) BLDG. INCORPORATING THE TECHNICAL NUMBER (TN)32.
Dec 20, 2024P00031$-20.6KREPLACE THE ROOF AND ROOFTOP HVAC EQUIPMENT ON TWO SEPARATE BUILDINGS WITHIN THE BOOSTER FABRICATION FACILITY (BFF) THE ENGINEERING AND ADMINISTRATION (E&A) BLDG.
Dec 18, 2024P00030$0REPLACE THE ROOF AND ROOFTOP HVAC EQUIPMENT ON TWO SEPARATE BUILDINGS WITHIN THE BOOSTER FABRICATION FACILITY (BFF) THE ENGINEERING AND ADMINISTRATION (E&A) BLDG. PERIOD OF PERFORMANCE EXTENSION DUE TO PENDING CHANGES.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.